ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Overview of Vacuum Systems Tejas Deshpande 24 July, 2014.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Vacuum technologies of existing and future GW interferometers Aspera Technology Forum Darmstadt, March 2012 C.Bradaschia, G.Parguez, A.Pasqualetti.
PEEM III Endstation Design Review
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LIGO-G v1 The LIGO Vacuum System and plans for LIGO-Australia Stan Whitcomb IndIGO - ACIGA meeting on LIGO-Australia 9 February 2011.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Vacuum tests of the accelerating structure mock-up The main outputs of the tests would be the following: Feasibility of the assembly of the vacuum manifold.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
R&D activities in Florence Geppo Cagnoli INFN and U. of Glasgow WG2 & WG3 Meeting – 27 th Apr Firenze.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Vacuum / cryo links Design issues Jo van den Brand, Martin Doets Nikhef Cascina Feb. 3,
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
Electron Screening in deuterated targets ©Francesco Raiola Raiola Francesco, Fakultät für Physik und Astronomie Ruhr-Universität Bochum, D Bochum,
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Status of the activities on the vacuum system C. Garion TBMWG, 27/03/2013 Outline: ON/OFF mechanism: tribology study Pumping technology: MB quad VC Accelerating.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Installation of the T600 at Fermilab Fermilab, February 15,
Vacuum System P. Chiggiato TE-VSC
Performance test of KAGRA cryostat at site
Electrostatic deflector development at RWTH Aachen
RTML Vacuum System RDR Summary FermiLab October 24, 2007
General remarks about the HESR and PANDA vacuum system
Performance test of KAGRA cryostat at site
Challenges of vacuum chambers with adjustable gap for SC undulators
LARP Vertical Test Facility
Baffle arrangement for LCGT
CEPC Vacuum System Dong Haiyi 2017/11/5.
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Quantum noise reduction techniques for the Einstein telescope
Laboratoire des Matériaux Avancés - Lyon
Superattenuator for LF and HF interferometers
Cavity + He Vessel interface
Control systems plans & activities for HL-LHC during LS2
Advanced Virgo – Nikhef tasks
XFEL Collimation and Beam Switchyard Vacuum Issues
GEO HF Limits/Goals/Options…
Virgo Vacuum System – 3G challenges
Cryomodule Assembly Plan
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Dust issue of Vacuum System Notes for discussion 31 Jan 2017
Electron Ring IP Region Optics
Considerations about triangular and L-shaped detectors
Vacuum System Design for the Target Monolith System
HWR and Test Cryomodule for China ADS
Presentation transcript:

ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will follow later  HF at ground floor  LF cryo at upper floor 24/11/20101C. Bradaschia – 3 rd ET General Workshop

24/11/2010C. Bradaschia – 3rd ET General Workshop2

24/11/2010C. Bradaschia – 3rd ET General Workshop3 ET Vacuum System Lay-out  750 mm 2 x 10 km  900 mm 2 x 10 km m  670 mm 2 x 10 km

24/11/2010C. Bradaschia – 3rd ET General Workshop4

24/11/2010C. Bradaschia – 3rd ET General Workshop5

24/11/2010C. Bradaschia – 3rd ET General Workshop6

24/11/2010C. Bradaschia – 3rd ET General Workshop7

24/11/2010C. Bradaschia – 3rd ET General Workshop8 Vacuum pipes 304L, 3-4 mm spiral welded on site, with outer stiffening rings 20 m elements including bellows and lips for on site assembly  HF 0.9 m diameter, free aperture 0.7 m (baffles), outer diameter 1.2 m (thermal insulation)  LF 0.75 m diameter, free aperture 0.45 m (baffles), outer diameter 1.05 m (thermal insulation), cryotrap diameter 1.5 m  filter cavities 0.7 m diameter, free aperture 0.4 m (baffles), outer diameter 1.0 m (thermal insulation)

24/11/2010C. Bradaschia – 3rd ET General Workshop Hz -1/ Hz -1/2 H mbar H 2 O mbar N mbar “Vacuum Noise” - after 400 o C and 150 o C

24/11/2010C. Bradaschia – 3rd ET General Workshop mbar mbar mbar

24/11/2010C. Bradaschia – 3rd ET General Workshop11

24/11/2010C. Bradaschia – 3rd ET General Workshop12 PUMPING SYSTEM Pipes 120 x (60 km / 500 m) Evacuation2000 l/s turbo + scroll Permanent 5000 l/s Ti sublimation l/s Ion Cryotraps (4 x 8 m liquid N 2, 6 x 50 m liquid He) Evacuation2000 l/s turbo + scroll Towers (21 x) upper chamberevac l/s turbo + scroll perm l/s cryo + Ion (TBC) mirror chamberevac l/s turbo + scroll perm l/s cryo + Ion Cryo Towers (4 x) upper chamberevac l/s turbo + scroll perm l/s cryo + Ion (TBC) mirror chamberevac l/s turbo + scroll perm l/s cryo + Ion

24/11/2010C. Bradaschia – 3rd ET General Workshop13 Vacuum System Challenges Cleanliness Thermal treatments Quiet pumping COST