N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Single cell coordination. Single Cell Cavity Activity Outline 1.ANL EP optimization (TE1AES005) 2.R&D cavities A. Tumble, 2 cavities (TE1ACC004, NR-6,
Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno,
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity degradation after vert. test on the way or in the module, James Kerby ~10% agreement in results across laboratories typical ~20% degradation VT.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Fermilab IB1 Vertical Test Stand Update C.M. Ginsburg (Fermilab) for the VTS group August 31, ft.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Summary of temperature mapping developments G. Ciovati, M. Champion AES Cavity Meeting, JLab, August 28 th 2007.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Single cell coordination. Single Cell Cavity Activity 6-month plan 1.ANL EP cavities (TE1AES005, TE1ACC001) 2.R&D cavities Tumble, 2 cavities Laser re-melting,
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
LCLS II FNAL Niobium Pre- Procurement Review - Overview Camille M. Ginsburg, FNAL April 17, 2014.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Status of the ILCTA_MDB Horizontal Test Stand
Cornell Updates Commissioning of T-map for ILC single cell starts.
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Progress and Issues with VTS Upgrade
ELLIPTICAL SCRF CAVITIES
ILC Cavity & Cryomodule Overview
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
The broken HOM Couplers on 3.9 GHz Cavity #2
Presentation transcript:

N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday

N. Dhanaraj 2 Single Cell Testing Facility at Fermilab Goals:  Fast turnover testing of 1-cell cavities  ILC S0 milestone  Address, explore and incorporate other cavity research issues (Advanced R&D)  Collaborate with other labs (tight-loop processing,….)

N. Dhanaraj 3Infrastructure Action Items 1.Testing Station 2.Diagnostics 3.Cavity Production 4.Processing

N. Dhanaraj 4 Testing Station-RF System Rene Padilla – Working on modifying A0 System to fit 3.9 and 1.3 GHz Components that need to be changed – Identified Quotes and ordering of components – In Process Amplifier – Ordered (Identical to the VTS one) One –Time Recalibration of system– TBD (Rene and John Reid) Safety Review Documentation -TBD Safety Interlock –TBD (Rene and John Reid) Software modification (more visual, eg. Real-time Q vs E curve– TBD (Rene and John Reid)

N. Dhanaraj 5 Testing Station-RF System (Contd.) 3.9 System 1.3 SystemFrequency Range include 1.3 and 3.9 GHz

N. Dhanaraj 6 Testing Station- Couplers Timer has coupler design for center cell Relative position of vacuum port and couplers (to help determine antenna length)-finalized Antenna length for Long End Cell (DESY Standard single cell and ours? ) - TBD Feedthroughs –Input available, Pick-up – To be ordered Mating flange and antenna – To be made Input Coupler Feedthrough

N. Dhanaraj 7 Testing Station- Top Plate/Insert Design initially started by Lyle Rosine, now taken over by Frank Mcconologue

N. Dhanaraj 8 Diagnostics - Thermometry Efforts to test thermometry on 1-cell to help migrate to 9-cell setup Diode Sensors Calibration -In progress (Aseet) Irradiation test at A0, 3.9 GHz testing – March 13 th ? (Aseet) PPD & Aseet -Board Design Read out board – In Progress Fixture for boards – Jlab Idea (Frank, Aseet and Nandhini)

N. Dhanaraj 9 Cavity Production Die drawings – Received from Jlab (Larry Turlington) RRCAT (India) to make Dies Will order single cell cavities for this year from AES Roark possibility overlooked for now due to budget issues Received a single cell cavity from DESY for T-map studies and commissioning of system (Wolf-Dietrich) Seals Al – Diamond for ILC– Ordered (Dan Olis)

N. Dhanaraj 10Processing EP, BCP will be done at ANL End Teflon flanges for BCP: Design concept (Cristian & Allan), Frank Mcconologue to work on modeling A0 HPR seems suitable for rinsing single cell 1.3 GHz cavities (Jlab 1100 psi compared to ours 1200 psi, our nozzle size can be doubled)-A0 Techs Adapters

N. Dhanaraj 11 Safety Reviews & Other Things Need to prepare for Pressure vessel safety – In Progress (Nandhini) Radiation Safety RF safety

N. Dhanaraj 12Budget Priority Description Fermi M&S Time scale Comments Cell test stand Setup 1.00 FTE ENG 0.60 FTE DES $235K1 yearIncludes 3 1-cell cavities 2008 Program S0 SRF R&D 0.50 FTE TEC 0.75 FTE ENG 0.50 FTE TEC $100K $60K 1 year startup Helium + small material 3 additional cavities Total FTE = 1.75 ENG + 1 TEC DES = 3.35 Total M&S $395

N. Dhanaraj 13 Schedule In Progress Always!!!

N. Dhanaraj 14Acknowledgement AD – Allan Rowe, Brian DeGraff, Wade Muranyi, Mike Rauchmiller (Rocky), Helen Edwards, John Reid, Rene Padilla, Mike Foley, Scott Reeves, Yun He SRF Materials Group VTS Group TD – Harry Carter, Timergali Khabiboulline, Charlie Cooper, Dave Burke, Camille Ginsburg, Tug Arkan, Dan Olis, Marc Ross, Shekhar Mishra, Jim Kerby, Don Mitchell, Lyle Rosine, Chuck Grimm, Frank Mcconologue, Kerry Ewald CDF – Aseet Mukherjee PPD Jlab – Gigi Ciovati, Peter Kneisel, Ganapati Myneni, Larry Turlington DESY – Wolf-Dietrich Moeller

N. Dhanaraj 15 Tentative Testing Plans Process R&D (ILC-S0) Reproducibility of the tight loop processing Alternative rinsing (ethanol, degreasing) Pre-processing (tumbling) Baking study SRF R&D Post processing (plasma cleaning) Large grain – Grain size, orientation – Grain boundary dynamics – Processing optimization Beyond Nb (2-3 years from now) –Multilayer (NbN, Nb 3 Sn, MgB 2 … on Nb) –Collaboration W. U

N. Dhanaraj 16 Thank You !!