Take 5 for Safety E. Lessard January 19, 2016. Credited Controls  Credited controls: controls determined through safety analysis to be essential for.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Edward T. Lessard R&D ERL Meeting Accelerator Safety Order (ASO) Requirements E. Lessard, Associate Chair for ESSHQ Collider-Accelerator.
Advertisements

Conduct of Operations – Operations Aspects of Unique Processes Photo of the Week Collider-Accelerator Department Take 5 for Safety.
NSF Audit Accelerator Safety Envelopes Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Airflow and BSC Biosafety and Biosecurity Awareness Training
FT-ICR Facility Safety Update. Updates to prior policies: Lab spaces have been classified as “safety glasses required at all times”
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
LArTF and MicroBooNE Installation
Digital Celeris Integrated System Patient Room Isolation Room Programmable Controllers Local Display & Command Unit.
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Work In Confined Spaces
Chemical Fume Hood  A type of local ventilation device that is designed to limit the user's exposure to hazardous or noxious fumes, vapors or dusts.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Welding, Subpart J OSHA 500 Course. Critical Hazards n Heat is a source of ignition in the various welding processes n Welding fumes can become a health.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
Take 5 for Safety Conduct of Operations – Control of Equipment and
Permit to Work Procedure Document Number: KOC.SA.004
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
Confined Space Instructional Goal You will be able to recognize confined space and permit required confined space, and be aware of the procedures used.
Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department Take 5 for Safety.
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
Welding and Cutting for construction. Welding safety program guidelines Person responsible Accountability and enforcement Job hazard assessment Special.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Contractor Safety Council
Safety Review for Modifications Calling For Help Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Machine-Experiments January 19, 2005 Machine status.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
PLC Based sequential batch process CONTROL system
Unit 4: General Safety Practices
Take 5 for Safety E. Lessard June 2, Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
Why Do We Need The ASO? E. Lessard Collider-Accelerator Department (C-AD) Brookhaven National Laboratory DOE Accelerator Safety Workshop to
Building 801 Release of 25-day Sr-82 Collider-Accelerator Department Take 5 for Safety.
EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7,
Lab Safety: Physical and Chemical Hazard Y.Khosravi
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Laboratory Safety CH1, CH3. OSHA Laboratory Standard Requires a Chemical Hygiene Plan Rules for safe handling of hazardous chemicals.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Take 5 for Safety E. Lessard January 13, Readiness for High Consequence Risks: Accelerator Operations  Implementing procedures tie responsible.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
MICE Video Conference November 11, 2002 Safety Scheme on the Facility Integration Edgar Black IIT.
Brookhaven Science Associates U.S. Department of Energy RSVP Safety and Environmental Protection Issues E. Lessard Associate Chair for ESHQ Collider-Accelerator.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
ORNL is managed by UT-Battelle for the US Department of Energy Considerations for Engineering (and other) Controls for Oxygen Deficiency Safety Kelly Mahoney.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Dfernandez Computing & Controls Dec 3/4 MaxIV Control Systems for Accelerators and Automation David Fernández. ALBA Computing & Controls.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Ray Karol 2/26/2013. Annual Audit Next week BNL is conducting the annual internal assessment of our environmental and safety programs and compliance assessments.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Shielding Design for LCLS Injector Operation – Phase one
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
Course Structure.
Hazard Alert: Fire inside a fume hood
Presentation transcript:

Take 5 for Safety E. Lessard January 19, 2016

Credited Controls  Credited controls: controls determined through safety analysis to be essential for safe operation directly related to the protection of personnel or the environment  Credited Controls are identified in the Accelerator Safety envelopes for C-AD accelerator facilities  Responsibilities to assure Credited Controls are operational or in-place are assigned in the OPM 2.5 series of procedures 2

Credited Controls at C-AD  Access Control System used to protect personnel from ionizing radiation and/or oxygen deficiency hazards  STAR flammable gas systems  PHENIX flammable gas systems  Ionizing radiation shielding for accelerator and accelerator facilities  Laser interlocks for protection of personnel from laser and radiation hazards  Activated soil caps  Radiation monitoring and interlocking Chipmunks for personnel radiation safety as determined by the C-AD RSC 3

Credited Controls at C-AD  MIRP BLIP: Stack monitoring system Water tank hot-box exhaust fan system including ductwork and exhaust fan low-flow alarm system Linac to BLIP bending magnet interlocks  MIRP B801 TPL: Hot cells, hot boxes and fume hoods (configuration and shielding) Hot cell, hot box and fume hood exhaust systems including fans and ductwork  NSRL B958 exhaust fans  The VODH system at RHIC including pressure sensors, interlocks, cryogenic sectionalizing valves and signal to the RHIC ODH system 4

Picture of the Week – How Many Hazards Can You Spot? 5