EGEE is a project funded by the European Union under contract IST-2003-508833 HellasGrid node hosting requirements & SLA Nektarios Kozyris - Christos Aposkitis.

Slides:



Advertisements
Similar presentations
Basic Concepts of a Computer Network
Advertisements

Subsystems of a TV Production Studio. Studio – big room with high ceiling Prop storage – known as a Scene Dock, for temporary storage of active sets/props.
Opening the Key to Hi-Tech Video Surveillance & Intelligent Video Analytics with Video Management Software Opening the Key to Hi-Tech Video Surveillance.
Communications Room: Router/WAP, Switch, Server, Patch Panel Communications Room: Router/WAP, Switch, Server, Patch Panel Hard-wired Ethernet Ports… Site.
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
Total HVAC Control from anywhere Easy control that can save a fortune
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
The Cable Guys Inc. Drew Leach Tom McLoughlin Philip Mauldin Bill Smith.
Chapter 19 Electrical Plans.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Network/Technology Infrastructure Plan Section 5 – 6 – 7 As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.
NETWORKING CLASSIFICATION OF COMPUTERS * Size *Cost *#of users *Storage capacity.
Run Run Shaw Library of CityU By CyberFarm2000 (Janice, Winter and Frank)
Broadband Education Services, June 2009, Crete, Greece Broadband services for schools through the Greek School Network.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Managing a computerised PO Operating environment 1.
INFSO-RI Enabling Grids for E-sciencE EGEE-II activities overview NA3: Training and Induction Fotis Georgatos, Aris Sotiropoulos,
Solutions Overview SAVE FROM 10 – 50%
Module 10 Configuring and Managing Storage Technologies.
May 2001GRNET GRNET2 Designing The Optical Internet of Greece: A case study Magda Chatzaki Dimitrios K. Kalogeras Nassos Papakostas Stelios Sartzetakis.
Managing Computerised Offices Operating environment
1 9/10/2015 PanelDog DC Graphical LCD Meter Series.
ACCOUNTABILITY shouldn’t mean working 24/7.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
Multi-media Computers and Computer Networks. Questions ? Media is used for ………………… Multimedia computer is capable of integrating ………………………………….. OCR stands.
The rush for Xirrus and our many partners begins now. | WI-FI for K-12 ENVIRONMENTS E-Rate 2.0.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE II - Network Service Level Agreement (SLA) Establishment EGEE’07 Mary Grammatikou.
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
R&E Networks Go Green - From Infrastructure to Applications Nezar Sami Nile University
Vulnerabilities in peer to peer communications Web Security Sravan Kunnuri.
Manos Varvarigos Professor, Computer Engineering. & Informatics, Univ. of Patras Director of Networking Technologies Sector of CTI
Natick Public Schools Technology Update April 23, 2007 Dennis Roche, CISA Director of Technology.
The University of Bolton School of Games Computing & Creative Technologies LCT2516 Network Architecture CCNA Exploration LAN Switching and Wireless Chapter.
EGEE is a project funded by the European Union under contract IST EGEE Usage and Programming Introduction Flavia Donno Section Leader for LCG.
What kind of technical infrastructure would be required? Team 4 I.T.
1 Introduction One of the largest research laboratories in the Computer Science Department of the School of Electrical and Computer Engineering, National.
EGEE is a project funded by the European Union under contract IST HellasGrid Hardware Tender Christos Aposkitis GRNET EGEE 3 rd parties Advanced.
INFSO-RI Enabling Grids for E-sciencE Hellas Grid infrastructure update Kostas Koumantaros, Christos Aposkitis EGEE-HellasGrid Coordination.
EGEE is a project funded by the European Union under contract IST EGEE NA3 Third parties roles and responsibilities Christos Aposkitis GRNET.
Services provided by CERN’s IT Division Ethernet in controls applications European Organisation for Nuclear Research European Laboratory for Particle.
SECOND EGEE CONFERENCE The Hague, November 2004 GRNET Input NA2 Networking Activity SECOND EGEE CONFERENCE The Hague, November 2004 Hara Biba Greek Research.
Nikhef/(SARA) tier-1 data center infrastructure
May 2004NTUA1 National Technical University of Athens EGEE Project 3 rd Parties Kick off Meeting, Athens, May 27-28, 2004 Dr. Costis Christogiannis Telecommunications.
State Purchasing Team 4, Information Technology. Overview Team 4 Members & Responsibilities Current Contracts - IT Hardware - Wireless Services - Audio.
Internet2 AdvCollab Apps 1 Access Grid Vision To create virtual spaces where distributed people can work together. Challenges:
INFSO-RI Enabling Grids for E-sciencE EGEE-II activities overview NA3: Training and Induction Fotis Georgatos, Aris Sotiropoulos,
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
EGEE is a project funded by the European Union under contract IST EGEE Induction Course Christos Aposkitis GRNET EGEE 3 rd parties Advanced.
Transition from Phase I to Phase II : The resource requirement estimation for Phase II of the Project should be so done that all the pending tasks of the.
Jan Gruntorád, CEO CESNET (eInfrastructure and Grids for e-Regions)
Beyond the Classroom – Campus-wide AV Todd Johnson K-12 Systems Sales Executive Alpha Video & Audio, Inc.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
Geaux Beyond Typical Digital Signage. Learning Objectives Why Digital Signage? Collaboration, Goals, Budget Planning. Choosing Your System. Hardware Management.
Dr. W. Huisman Cairo, november 19th ISO 15189:2007 clauses 5.1 Personnel 5.2 Accommodation and environmental conditions 5.3 Laboratory equipment.
Center for Advanced Technology and Training CATT Room Instruction Demo
Project Target Develop a Web Based Management software suit that will enable users to control Hardware using standard HTTP & Java Applet compatible web.
Electronics and Controls
EGEE Collaboration Board Chair
CERN Data Centre ‘Building 513 on the Meyrin Site’
HellasGrid CA & euGridPMA
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
Fotis Karayannis HellasGrid Scientific Coordinator GRNET
Network Requirements Javier Orellana
IT Wiring 综合布线.
INFNGRID Workshop – Bari, Italy, October 2004
Networking and Telecommunications
Villas, appartments, residence
Presentation transcript:

EGEE is a project funded by the European Union under contract IST HellasGrid node hosting requirements & SLA Nektarios Kozyris - Christos Aposkitis GRNET EGEE 3 rd parties Advanced Induction Course, Athens 20-21/01/05

Athens, 20-21/01/ Contents of this session HellasGrid node location & requirements Access Grid node locations & requirements Time schedules Discussion

Athens, 20-21/01/ HellasGrid node locations K1: Demokritos (HG node + Tape library) K2: NTUA (HG node) K3: IASA (HG node) K4: CTI - Patras (HG node) K5: AUTH - Salonica (HG node + Access Grid) K6: FORTH - Heraklion (HG node + Access Grid) K7: GRNET (Access Grid) K8: GSRT (Access Grid)

Athens, 20-21/01/ Equipment distribution Quantity per node Item No.DescriptionΚ1Κ2Κ3Κ4Κ5Κ6Κ7Κ8Total SECTION 1 1Servers α of which storage servers Storage arrays Routers GbE switch ports SECTION 2 5Tape library1 1 6Client software SECTION 3 7Servers Display screens Audio subsystems Cameras

Athens, 20-21/01/ HG node requirements Physical requirements 12 m 2 free space Floor or ceiling cabling rails Physical security (lock, alarm) Controlled access (security staff 24x7) Power requirements 40KVA (220V) power capacity with mains circuit breaker Preferably 380V mains, to reduce phase irregularities. Separate circuit breaker for each phase UPS 40 KVA – 10 min. – by pass switch Generator support with automatic control 12 circuits for 220V sockets – 16A circuit breaker each 10 sockets at 220V for temporary usage

Athens, 20-21/01/ HG node requirements – cont’d A/C BTU estimated capacity 22 ο average temperature 50% average humidity Alarm capabilities – should be carefully watched Network 1 Gbps connection to GRNET Shared with the connection of the institution Sufficient coverage of these points is a PREREQUISITE for the installation. There is no way that these can be ignored or passed by. Relevant mention in the HellasGrid contract.

Athens, 20-21/01/ Access Grid node requirements Meeting room for people 10 sockets at 220V 3 RJ-45 network sockets or local hub/switch Preferably (not strictly required but would enhance the quality of communications): Elongated “U” layout Sound insulation – Quiet !!! No natural lighting “Warm” lights – 3600 ο K white temperature Projection area

Athens, 20-21/01/ Time schedules Confirmation of infrastructure availability: 31/1/2005 Qualification by GRNET:31/3/2005 Contract signing:10/4/2005 Installation of hardware (estimated):10/7/2005

Athens, 20-21/01/ Thank you for your attention Draft contract will be circulated by GRNET Comments ? Discussion….