US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
RF Cavity / Coupling Coil Module
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
DOE Review Recap Mark Palmer Fermilab August 15, 2014.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
US Construction Project: SSs, PRY, Cavities and test program 1.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
MICE Spectrometer Solenoids Step IV running
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Comments on the February DOE Review
Resource Loaded Schedule and Budget Profile
Completion of the MICE-US construction project
Status of the MICE Construction Project
Mark Palmer for the CESRTA Collaboration
LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010
Spectrometer Solenoid Recovery: Options for Moving Forward
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
Conventional Facilities
Presentation transcript:

US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016

Outline US MICE Budget FY thru Cooling Demo remember US FY is 1oct – 30sept (6 mo from UK) 30sept2017 and that US DOE authorized funding ends 30sept2017 US MICE Budget Breakdown by Activity & FY R&D Risk Register Milestones DOESN’T FY16 4% Continuing Resolution restored! => 96% * $ 6 M = $ 5.76 M ($ 0.24 M less)Balance Sheet – show how this DOESN’T fit within the DOE Funding Profile of $ 9 M, $ 6* M, $ 3 M * FY16 4% Continuing Resolution restored! => 96% * $ 6 M = $ 5.76 M ($ 0.24 M less) plus $ 1.47 M carryover FY15 → FY16 (for ref $ 1.89 M carryover FY14 → FY15 → contingency) April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)2

US-DOE MICE Budget Profile through Cooling Demonstration April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)3 April 16 est indicates with & w/o repair of ds Spectrometer Solenoid also deferred RF Vacuum & RF Assembly from FY15 → FY16 Starting in FY2015 DOE requires MICE to include: MICE Construction, MTA Testing of RF Components, MICE Experiment Support, and Program Management + FY19

Ramp-down by Activity & FY April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)4 April 2016 estimates indicates with and without repair of ds Spectrometer Solenoid

RISK Additional RISKs associated with the repair of the downstream spectrometer solenoid after the recent failure have not yet been re-assessed However, the estimates for the repair of the DS SS magnet include the usual 30-40% construction contingency probability weighted Risk remains ~ $ 700 K which IS included in the funding needs April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)5

probability weighted R&D Risk Register April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)6 no changes since October 2015 Review – no additional risks retired keep same level of risk for Spectrometer Solenoid Magnet Repair this RISK is included in Resource Loaded Schedule estimate

Milestones April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)7 Major US MICE Deliverables: updated (Oct2015) MICE Cooling Demo Magnetic Shielding Received in UK 18july2016 (16may) MICE RF Modules Arrive in UK: RF # 1: 16aug2016 ( 9may) RF # 2: 14sept2016 ( 7june) not on critical path so decided not to use contingency to maintain schedule

US MICE Critical Procurements PRY for Cooling Demonstration April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)8 see RF Modules on next page from: US MICE Cooling Demonstration Procurements.xlsx

US MICE Critical Procurements RF Modules – RF#1 & RF#2 April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)9

US MICE Critical Procurements DS Spectrometer Solenoid Repair April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)10

Balance Sheet April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)11 includes estimate for repair of ds Spectrometer Solenoid

The End April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)12

Backup Materials $ available for Magnet Repair vs. MICE Exp. Support assuming no additional funding remaining est for Magnet incl wgt RISK = $ 2,365 K April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)13

MICE Est & Cash Flow by US FY April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)14 Includes $ 1470 K carryover FY15 → FY16

MICE Est & Cash Flow by US FY April 5, 2016 Peter H. Garbincius | MICE Review (RAL, April 5-6, 2016)15 Mag Int Risk will be delayed until repaired ds Spectrometer Solenoid Magnet is available