BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
BNL - FNAL – LBNL - SLAC US LHC Accelerator Research Program LQ Reaction/Impregnation DR’s & Travelers at FNAL CM15 Magnet Systems Working Groups HQ Coils.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
LARP CM15, SLAC, 11/1/2010GianLuca SabbiMagnet R&D Plans Magnet R&D Plan for GianLuca Sabbi LARP Collaboration Meeting 15 SLAC, November 1 st,
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
P. Ferracin on behalf of the MQXF collaboration
BNL Progress with LR, application to LQ
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Mike Anerella December 17, 2013
Coil Design and Fabrication
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
QXF schedule and milestones
Presentation transcript:

BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse Schmalzle, Mike Anerella, Peter Wanderer (BNL) LARP Collaboration Meeting 14 Fermilab April 26-28, 2010 Focus of this talk is on equipment and infrastructure, NOT on tooling

6-8 m coils at FNAL Winding: –6m: present table with stronger motor (minor upgrade) –8m: may need the MQXB winding machine Significant upgrade: software and control system Curing: –6 and 8m LQ coils: OK –6 and 8m HQ coils: new curing mold Reaction: –6m: present oven is OK –8m: oven upgrade (major up. with long shutdown) Impregnation: –Ovens are OK, but angle is smaller and smaller… G. Ambrosio - Long Quadrupole 2 LARP CM14 - FNAL, Apr , 2010

6-8 m coils at BNL Winding: –6m: Minor upgrades: extend winding machine mandrel shuttle; May also need to modify or build additional mandrel rotating supports –8m: Extend winding machine base and winding supports Curing: –6 and 8m: extend curing press Reaction: –6 and 8m: extend oven (major up. with long shutdown) Impregnation: –6m: present equipment is OK –8m: build impregnation dewar (horizontal or angled) G. Ambrosio - Long Quadrupole 3 LARP CM14 - FNAL, Apr , 2010

Assembly & Test at FNAL Assembly: –6m: present press used for 4m mirror Need to complete weld-carriage upgrade –8m: need to check weld press length… Length upgrade is possible Test: –6m: should reassembly/refurbish “Jessica” cryostat; test-stand should be restored and upgraded (current, QP, …) –8m: new cryostat G. Ambrosio - Long Quadrupole 4 LARP CM14 - FNAL, Apr , 2010

Assembly & Test at BNL Assembly: –6 and 8m: some ideas to be explored Test: –6m: Vertical test facility is OK Small upgrade needed for HQ coil test (QP) –8m: new horizonthal cryostat G. Ambrosio - Long Quadrupole 5 LARP CM14 - FNAL, Apr , 2010

Possible plan Make 6m HQ coil and assemble it in mirror structure at FNAL, and test it at BNL; while upgrading BNL equipment for 8m coils. –Get results in the shortest time –Preserve one active long-coil production line –Build equipment for 8m coils Need to evaluate time, cost and funding for this upgrade G. Ambrosio - Long Quadrupole 6 LARP CM14 - FNAL, Apr , 2010

Timeframe 6m coiltimeframe Design & procur. parts and tooling FNALFY11 Q1-Q2 Coil(s) fabricationFNALFY11 Q3-Q4After LQ03 coils Mirror assemblyFNALFY12 Q1 TestBNLFY12 Q2 G. Ambrosio - Long Quadrupole 7 LARP CM14 - FNAL, Apr , m coiltimeframe Design & procur. Parts and tooling BNLFeedback from 6m coil fabric. Infrastructure and cryostat BNLNeed to develop plans and coordinate funds among LARP, BNL, APUL(?), …