-1- 游叡研幫工程司 Water Leakage Improvement Ray-Yen, YU Assistant Engineer Taipei Water Department 2013 Seoul Study Workshop.

Slides:



Advertisements
Similar presentations
Intelligent Pressure and DMA Management
Advertisements

Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
TILDE DST & DMS Software Decision Support Tool & Data Management System for Leakage and Water Loss Management.
NONREVENUE WATER - Current and Future Remedies Gary Harstead Director – Asset Management United Water NARUC Winter Meeting February 2013.
BAL BHARATI PUBLIC PUBLIC SCHOOL,INDIA
A BETTER TOMORROW made possible Canadian Utilities Learn to Fly through Benchmarking of Water Loss Management Christine McCormack, P.Eng. September 13.
Technology that optimises water distribution networks.
TK3333 Software Management Topic 7: Schedule Control.
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
The South East Queensland Drought Experience Lessons for Canadian Demand Management Practitioners Kirk Stinchcombe Manager, Operational Policy and Planning.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
ENERGY AUDITS & ELECTRICITY BILLS Energy & Environment.
LINDFIELD PUBLIC SCHOOL STAGE TWO TEAM Before we started the challenge, our group found out about water in our world…
A Workshop for Communities Implementing Water Loss Management Prepared for Columbia Basin Trust by IKEN Services Ltd. May 2013 Leak Detection Methods.
© Water Systems Optimization, Inc TAUD Utility Technology Conference Frequently Asked Questions in Leak detection, Distribution System Testing.
Non-Revenue Water Management : The Case of Entebbe , Uganda
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
Chapter 3 Asset Management. 2 Asset management Asset management = infrastructure management Infrastructure management = Capital management = Asset management.
Our Experience in Reducing Water Losses by Regulating Pressure in Water Supply Systems November 2011, Dubai, UAE Prof. Dr. Dipl.-Eng. Gancho Dimitrov Head.
CMP and High Technologies Case of BSG Beshah Mogesse.
What to look for when completing an AWWA Water Audit for the first time Reinhard Sturm, Vice President Water Systems Optimization, Inc. Paul Johnson, Vice.
FINANCIAL STATEMENTS. Why Use Financial Statements? Investors and bankers Investors and bankers Suppliers and creditors Suppliers and creditors You and.
Responses to the Drought What Else Might Be Done? Dr. Kartiki Naik and Madelyn Glickfeld Director, UCLA Water Resources Group.
A report showing the current consumption rates of water in Melbourne, strategies used to save water and outlining strategies to solve our water crisis,
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
Department of Water Affairs Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Water Conservation and Water Demand.
Water Services National Training Group Best Practice in the Management of Drinking Water.
Developing a Non- Revenue Water Strategy
Water in our homes Andrew Tucker Water Strategy Manager Energy Saving Trust.
TSX: PURglobal innovative sustainable infrastructure management solutions NRW – What can we learn from South East Asia? Hugh Chapman - Regional Director,
LELEA’S NEW WATER UPGRADE AND NEW WATER MANAGEMENT.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
1 Public Hearing User Rate Adjustments April 8, 2008.
The Smart Network: NRW, Pressure and Asset Management
ACTIVE LEAKAGE CONTROL SHARING ON PIPE FAILURE IN NEW DEVELOPMENT AREA.
Illinois Water Audit and Loss Control Training Workshop Fall 2014 Intro Fall 2014 Intro.
AS Business Studies Unit 1
The Gulf Oil Spill Whose to Blame as well as a reflection of the science literacy problem in the US.
Technological University wcmasmes.ppt1 Water Conservation & Management in Asian SMEs.
Measuring Water-Energy Savings from AMI Piggybacking technology Janani Mohanakrishnan, Ph.D. Apr 6, 2016.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
What is the Cost of Lost Water? AWWA / RCAP Small Systems Operator Training Columbus, Ohio May 24, 2016 AWWA / RCAP Small Systems Operator Training us,
WATER SYSTEM WORKSHOP February 27, 2012
| Performance Based NRW Reduction Contracts The case of HoChiMinh City Bill Kingdom.
Case study of Velika Kladusha (B&H), Lipjan (Kosovo) and Kochani (Macedonia) Vienna, 13 May 2016.
Lecture (11): Water Distribution Systems
4/14/2018.
DZ11 Qweisma.
DZ01 – Marka D B E C B G A B C.
Managing future water resources
Leakage control in transmission pipelines
An-Najah National University Faculty Of Engineering
Strategy for Waterworks Facilities Development in Tama Area
AGA Workshop: Resource Management and Work Forecasting
Model of block distribution system (Fukuoka City Waterworks Bureau)
Operation and Maintenance for safe drinking water
Reducing Non-Revenue Water
Night Flow Measurement, Step Testing, Leak Detection Equipment
Organisational NRW Management
QGIS, the data model, use and storage
Introduction to NRW Introduction to IWA Water Balance, NRW components and Performance indicators.
District Metered Areas
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
ANNEXURE A « If you can’t measure it … you can’t manage it » The importance of data analytics in the management of water losses Presentation for the Water.
Presentation transcript:

-1- 游叡研幫工程司 Water Leakage Improvement Ray-Yen, YU Assistant Engineer Taipei Water Department 2013 Seoul Study Workshop

-2- Outlines Introduction The Way to Improve Leakage Successful case sharing Achievements

-3- *Supply Area: 434 km 2 *Customers: 3.8 million *Supply Capacity: 2.7 million CMD *Networks: Mains=3,600 km Services=2,700 km Major Figures of TWD

-4- Only one main water source Leakage rate(28.4%) was too high in 2002

-5- Dead level 120 low level 130 mid level 138 water level (m) Feitsui Reservoir Drought of 2002 Worse nightmare came true: Intermittent water supply for 2 months high level 164

-6- Lack of replacement resulted in heavy leakage in Taipei Leakage Control was never a consideration in the past. Put all money into system expansion of Water Supply.

-7- Pipeline Replacement with DMA Zone Dividing Leakage Metering Pipeline Replacement Long-term Monitoring Using DMA as an auditing tool : To evaluate the quality of pipeline replacement and to fix the problem The Way to Improve Leakage

-8- DMA Flow meter 1000~4000 Households Pipeline replacement strategy : Low revenue rate (High leakage) DMA first

day consumption 15-day intake volume Revenue rate = ( consumption) Intake volume  M To evaluate the replacement job by Revenue Rate Leakage Estimation Techniques Meter reading method :

-10- Determining Leaking rate MNF Method Probabilistic MNF Determining Leaking Places Leak in MNF Actual leak (MNF overstate leakage) A : minor leaking B: no leaking C : major leaking Step Metering

-11- M M “Direct” metering the leaking volume of pipes Direct Metering Curb stop Valve Mobile Flow meter

-12- Pipeline Replacement is definitely not an easy job Replace pipes Meter leak volumes Get approval Monitor DMA Acquaint with residents

-13- Achievements

-14- After Revenue rate being increased in DMAs 165 DMAs’ pipeline being replaced Before

others DMAs YangMing South North West East DMAs being set

% 93% 54% 92%95% 56%59% 94% year Before replacement After replacement Before & After Pipeline replacement revenue rate DMAs being finished Revenue rate increasing dramatically 93% 50%

-17- Long-term projectMid-term IWA suggested replacing rate ( 1.5 % /year ) Pipeline replacement length Replacement rate surpassing 1.5% in 10 consecutive years

-18- Leakage rate being reduced 9.34% Long-term project Mid-term

NRW=1000 kCMD 2012 NRW=670 kCMD Reducing 47 kCMD /each year NRW= System input - Revenue volume days (normalize to CMD) NRW dropped Long-term project

-20- Advising Users to Move Water Meters to the Front of Houses Successful Case Sharing

-21- About 200 meters in the houses or behind houses. Our goal is to persuade all users to move the meters to the front of houses and cut off old pipes.

Before Construction: 1.convene a meeting 2.Post notices 3.Persuade users one by one

Link the tap directly 接上水龍頭 水塔 Attention: If users have indirect equipments, then you should tell users to change equipments in advance.

-24- leaking obviously The sound of leaking is so noisy that you can even hear it near gutter. Successfully Persuade users to move meters to the front of houses. 中正路 42 巷全部用戶表位從防火 巷遷移屋前 (totally 30 meters) Leaking seriously

-25- 中正路 62 號後方防火巷 Leakage Improvement Cut off old 75mm PVC Pipe When we cut off old pipes leaking seriously, Revenue rate is up to % that achieves our goal. When we cut off old pipes leaking seriously, Revenue rate is up to % that achieves our goal. After we communicate with users actively and visit them at night several times,finally all users agree to move the meter. We save NRW for 386CMD/per day 。

-26-

-27- After the construction, we make sure that the old pipe have no water. 轉開止水栓, 確認舊管已斷除 ( 無水 )

-28- After the construction, we use hammer to break old pipe and make sure there is no water. So we are sure it is successful. 鐵鎚敲斷防火巷舊管(確認舊管已無水)

(before) Leaking water keeps flowing (after) no leaking anymore The films about leakage improvement.

-30- After all the efforts, we successful move all the meters to the front of the houses. And we cut off all the old and leaking pipes. It is like a mission impossible. The users want to express their appreciation to us. So the neighborhood manager awards us testimonial as a gratitude. 福林里里長致贈感謝狀 Awards

-31-