Tevatron BPM Upgrade Project Review Summary Stephen Wolbers December 19, 2003 Tevatron Department Meeting.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
Retention and Disposition. Are messages public records? At NMU, all messages composed and maintained on University hardware are considered.
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Engineering & Instrumentation Department, ESDG, Rob Halsall, 24th February 2005CFI/Confidential CFI - Opto DAQ - Status 24th February 2005.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Current (recycler) timing/trigger system appears to be sufficient for TeV BPMs - add injection event to beam sync - TSG FPGAs nearly full, but dropping.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
6 Oct 2003Vince Pavlicek1 Make a BPM out of a Damper?
Tevatron BPM Upgrade Stephen Wolbers CD Briefing February 4, 2004.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
BPM Upgrade Projects Status & Technical Update Bob Webber DOE Review of Tevatron Operations March 2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
F Fermilab July 6, 2005Recycler Damper Stability1 Recycler Damper High Frequency Stability Jim Crisp
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Tevatron BPM Upgrade Stephen Wolbers DOE Review February 25, 2004.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron R. K. Kutschke †, J. Steimel, R.Webber, S. Wolbers, Fermilab*, Batavia,
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
TeV BPM Review 12/16/2003 Summary Status, Motivation, and Directions.
F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004.
TBPM Front-End Software Design Review L.Piccoli April
Specifications of Tevatron BPM Upgrade Jim Steimel.
Bob Hirosky L2  eta Review 26-APR-01 L2  eta Introduction L2  etas – a stable source of processing power for DØ Level2 Goals: Commercial (replaceable)
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Planning/Budget Stephen Wolbers CD All Hands Meeting May 7, 2004.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
Preliminary Project Execution Plan
Presentation transcript:

Tevatron BPM Upgrade Project Review Summary Stephen Wolbers December 19, 2003 Tevatron Department Meeting

Technology Choice Review The Tevatron BPM Project had a technology choice review on Tuesday, December 16, Charge, talks, etc. can be found at: bd.fnal.gov/run2upgrade/reviews/Tev_BPM_TechReview.html bd.fnal.gov/run2upgrade/reviews/Tev_BPM_TechReview.html One important explicit goal written in the charge is to have a system ready by October 1, 2004.

Talks at the Review Project Overview – Steve Wolbers Requirements – Mike Martens Specifications – Jim Steimel P/pbar separation measurement status – Rob Kutschke Electronics choices – Vince Pavlicek Summary – Bob Webber

Electronics Choice The project proposes to use a modified RR Echotek ECDR-GC814/8-SV board as the choice for the core electronics. –Changes include: Dual-port RAM instead of FIFO. Flashram instead of EPROM (allows programming FPGA over VME bus). VME interface replacement (Cyprus->Tundra) Many reasons for the choice, including: –Timescale –Availability of people/skills –See Bob Webber’s talk for a complete discussion of the choice.

Recommendations from the review (in my words) 1. By February show that a Echotek system (RR version) can produce turn-by-turn and closed orbit measurements using the undersampling technique and with the required accuracy. This should be done before a release of a purchase order for the full set of boards. This should not be held up until a proof of the p-pbar de-embedding technique is shown to work. 2. There should be an allowance for a second signal path for some subset of the BPM's for a system that can use timing to separate p and pbar signals. 3. A system integrator should be appointed.

Other issues/concerns Lack of a Commissioning plan pbar/p separation Calibration/timing/test systems Accuracy in light of pickup geometry and off-center beams BLM interface Q/A, testing, signoff Schedule Transition to operations

What’s Next? Make measurements in Tevatron with Echotek, damper board, scope and DSR board to: –Prove that Echotek can measure p’s with required accuracy –Prove (advance our learning) of the pbar/p separation Prepare for a large Echotek purchase –Sole source –Lots of signatures Organize/coordinate important tasks like calibration, commissioning, etc. Recruit system integrator