Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised.

Slides:



Advertisements
Similar presentations
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Advertisements

TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Measurement for Civil Engineering works
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
Soils - HDM Chapter 9 All pictures from HDM Ch 9.
Dounreay Nuclear and Chemical Land Contamination.
CONSTRUCTION.
GABION PRESENTATION.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
Understanding Geology and Its Engineering Properties… From A Civil Engineer’s Point of View… Dr.ÖZGÜR YILMAZER Geotechnical Engineer MSc. Geological Engineering.
John Osborne GS/SE March 2013
Grindstone Seepage Mitigation Project Village of Ruidoso Ed Toms 2105 NMWDOC Spring Workshop May 12, 2015.
Civil engineering branches & scopes
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
Current commitments related to Pillar II (Legal Framework) Unions at all levels could and should support by written documents and presence. CONCRETE ACTIONS.
Department of Civil Engineering,
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Decision Making and Data Management in Geotechnical Engineering
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
Mezyad Engineering Consultants L.C.C is an Multidisciplinary engineering consultancy that was founded in It helps clients to optimize the performance.
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Section Engineers Meeting March 6, 2014 Lexington, KY.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Silesian Aviation Cluster as a representative of Polish aviation industry.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Copyright February 10, Introduction to Geotechnical Engineering Prof. Basuony El-Garhy Geotechnical Engineering and Foundations Civil Engineering.
Welcome to Condor Projects Ltd, a specialist contractor to the civil engineering industry with over 30 years experience
Foundation Repair in Kansas City
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete repairs in Dammam
Micropiles and self drilling rods in soil and rock engineering
(Part 66 short, PP 2007, animation+p/r compr.)
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Jet grouting underpinning of a building on a marl embankment platform
By Tomasz Najder, Ph.D Civ. Eng.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
Faculty of Engineering at Shoubra
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
{Graduation Project} An-Najah National University
Drilling and sampling in foundation engineering
Water projects under The Cohesion Fund.
EAG346-Sem II 2014/2015 Lesson 2.
Various Fields in Civil Engineering By R.Janani
Drilling and sampling in foundation engineering
European Standard prEN 14199
FBE05 – Mathematics and Statistics
Earth and Rock fill Dams
Presentation transcript:

Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble- shooter”), as Production Manager (Stabilator AB- International Division in Poland), in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned Polish Najder engineering ® operating in Poland. Now Anna Monika is working as tunnelling consultant in Abu Dhabi. since six generations.Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering ready 2

3 Tomasz in PragueAnna and Tomasz in IstanbulAnna Monika on IcelandJan in Hallandsås ready

4 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Tunneling, rock stability high/low-pressure grouting,Tunneling, rock stability and soil improvement (deep mixing method, high/low-pressure grouting, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Coast protection. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready 4

Tomasz Najder Ph.D Civ. Eng. Born 1951 in Gdańsk (Danzig) in Poland M.Sc. Civ. Eng. at Technical University in Gdańsk / Polen Doctors thesis within geotechnical engineering at Technical University in Gdańsk. Since 1982 in Sweden. Employed in Skanska as Site Manager, Contract Manager, Internal Consultant (”trouble-shooter”) Vice President- Executive Manager of Stabilator Polen. Since 2002 Senior Consultant within family company Najder Engineering ® in Stockholm. Dealing with grouting since ready press 5

6 ready

7 ready

8 ready

Water inflow into Icelandic rock mass: - Ólafsfjördur Tunnel ready

10 Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel ready

11 ready

12 ready

13 ready

14 ready Project description: - The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield mm diameter): Total length 3.300m, including ca m marine crossing section. The first tunnel in the world between two continents

15 ready Coast “5’ to o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions - the first site with gabions based on double twisted mesh (March 1993) First storm – April 1993 After completion of works – May 1993 July 1996

16 Slope collapse 2002 ready

17 Different stages of cliff rebuilding ready

18 ready Deep-Soil-Mixing to create the sealing core of the embankments (Żu ł awy polder in Poland)

19 The catastrophic flood – Gdańsk (Poland) m ready

20 ready

21 ready

m/s ready

23 ready Concrete repairs - waterproofing

24 Royal Castle in Warsaw (Warszawa) - probably the most sofisticated slope protection, waterproofing systems and drainage in the world (?) ready

25 ready

26 ready

Thank You for Your attention! ready 27 THE END

ready Welcome to 28