RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
MICE - UK Project Progress Roy Preece 30 th April 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
MICE Demonstration of Ionisation Cooling Colin Whyte University of Strathclyde On behalf of the MICE collaboration 1RF Review 9th-10th Sept. 2015, Abingdon.
Standalone Commissioning Plan in MICE Hall K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review 9th Sept 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Integration of the Spectrometer Solenoid Magnets
Completion of the MICE-US construction project
RF Layout 3pi/2 for Discussion
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
An X-band system for phase space linearisation on CLARA
Test plan of ESS HB elliptical cavity
V. Veshcherevich Cornell University
Presentation transcript:

RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon

2 Outline Interfaces High power RF co-axial lines Vacuum Window protection Vacuum volume dimensions and pumping Temperature - control Cavity tuning – air Connections to magnets Bellows Flange bolt pattern Quench force Sliding platforms Clean room End flanges Controls and Monitoring Interlocks RF Power amplifiers Vacuum Temperature – independent Cavity tuning – LabView LLRF – offline test Muon Timing Safety Ionising radiation High voltage for RF amplifiers

Demonstration of Ionisation Cooling 3RF Review 9th & 10th Sept '15 Abingdon RF power transmission overhead SF6 filled co-ax lines Relatively easily de- mountable

Flexible coax Line Trimmers Hybrid Splitter Directional Coupler in each line 4616 Pre Amplifier TH116 Amplifier 500kW Load Directional Coupler 6 inch RF Power 4RF Review 9th & 10th Sept '15 Abingdon Simplified distribution network- overhead Off-centre mounting of hybrid takes up phase shift Minimised length of 4” line- minimises losses

Co-axial line support 5RF Review 9th & 10th Sept '15 Abingdon Coax support structure Drill and tap PRY for 2 off vertical upright supports Steve Plate & Holger don’t see this as a problem Fasten Coax support frame to uprights

Offline support frame 6RF Review 9th & 10th Sept '15 Abingdon

7 NEW RF SUPPORT PILLAR POSITIONS RF MODULE Co-Axial line trimmer supports SUPPORT PILLAR POSITIONS TAKEN FROM DRG NO TD DOWNSTREAM AFC UPSTREAM AFC

RF module vacuum 8RF Review 9th & 10th Sept '15 Abingdon Large, complicated vacuum volume – 2 large turbo-pumps mounted to central spool, located behind south side of PRY with large bore pump path Note T Anderson talk on Be window protection.

Cavity temperature 9RF Review 9th & 10th Sept '15 Abingdon Cavity on frequency at 36.5 degrees Water flow rates on cavity restricted due to small cooling pipes 0.05 degrees cavity temperature stability can be achieved RF trips result in cavity detuning which can again take 5 minutes to recover from RF is always applied at effectively maximum Temperature stabilisation system with heater, cold water and mixing valve control by high resolution process controller that self learns

MTA Cavity results 10 B=0 0.5M+ pulses at >11MV/m 14MV/m for short periods. No evidence of breakdown B=5T >7.5M pulses 8MV/m MV/m MV/m MV/m No breakdown below ~14MV/m RF Review 9th & 10th Sept '15 Abingdon

Cavity Tuning 11RF Review 9th & 10th Sept '15 Abingdon 0.5M pulses 5Hz, B=5T, 1.6MW (10.3MV/m) 1.4kW ave, 1Hz update interval

Vacuum connections 12RF Review 9th & 10th Sept '15 Abingdon mm OD x mm ID nested bellows : Extended length 66mm Closed length 14mm Stroke 52mm nom free length 40mm Axial stiffness 200N/mm. 316L, 0.91mm thk. End terminals: 316.

Quench Forces 13RF Review 9th & 10th Sept '15 Abingdon

14RF Review 9th & 10th Sept '15 Abingdon RF CAVITY MODULE MOVING PLATFORM (TOP VIEW) EXISTING AFC MOVING PLATFORM ARRANGEMENT RF MODULE C of G LINE RF MODULE FRAME FOOTPRINT EXISTING SS TIE-DOWN ARRANGMENT (DOWNSTREAM) PLATFORM TRANSIT ROLLERS SPACED AT MAX. SPAN IN AVAILABLE ENVELOPE BETWEEN FLOOR BEAMS HOWEVER MODULE LOAD OFFSET OFFSET CTR

RF Review 9th & 10th Sept '15 Abingdon RF CAVITY MODULE MOVING PLATFORM ARRANGEMENT OPTIONS (TOP VIEW) EXISTING AFC MOVING PLATFORM ARRANGEMENT PROPOSED RF MODULE MOVING PLATFORM ARRANGEMENT EXISTING SS TIE-DOWN ARRANGMENT EXISTING AFC MOVING PLATFORM ARRANGEMENT PROPOSED RF MODULE MOVING PLATFORM ARRANGEMENT EXISTING SS TIE- DOWN ARRANGMENT 15 OPTION 1OPTION 2 DOWNSTREAM SPECTROMETER UPSTREAM SPECTROMETER

Cooling Demonstration 16RF Review 9th & 10th Sept '15 Abingdon

Partial Return Yoke (PRY) 17 Flux return path to protect sensitive equipment from fringe field of magnet chain. 100mm thick soft iron plate Step IV PRY re-used and extended for cooling demonstration. Extension also made in the USA, drawings complete, ready to go to contract. New, extended support structure made in UK. New floor fixings required RF Review 9th & 10th Sept '15 Abingdon

RF Module End Plates 18RF Review 9th & 10th Sept '15 Abingdon RF Module end plates are heavy, 3-400kg. Require hoist/frame in clean room. Cannot flow significant clean gas to preserve cleanliness because of fragile windows. Replace Vac flanges with thin/light ‘clean’ plates which allow insertion into beamline. Build structure around magnets and fit to clean room extension.

19RF Review 9th & 10th Sept '15 Abingdon RF system overall control State machine control RF measurements Important vacuum /voltage/ temperature parameters Interlock status and trips Illustration shows the main operator panel for ALICE more in-depth control pages are clickable from this main screen

Off-line Testing 20RF Review 9th & 10th Sept '15 Abingdon RF Module RF Amplifier Area

Cooling Demonstration Installation start 1 st June RF cavities, 2 secondary absorbers bracketing main absorber 21RF Review 9th & 10th Sept '15 Abingdon Extended Partial Return Yoke – USA 2 x 201MHz cavities - USA Be windows Tested in B field to 14MV/m 2 x 2MW 201MHz amplifier chains – UK RF infrastructure support - UK RF controls and monitoring – UK Muon phase determination - UK

i RF Review 9th & 10th Sept '15 Abingdon22