Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.

Slides:



Advertisements
Similar presentations
Maternal and Child Health Bureau Seminars on Adolescent Health: Nutrition and Physical Activity, Part I July 30, 2003 Health Resources and Services Administration.
Advertisements

This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Time-lapse Seismic and AVO Modeling, White Rose, Newfoundland
Project Status Group B-4 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Al Akhawayn University School of Humanities and Social Sciences Communication Studies Course „Public Relations Communication“ Prof. Dr. Mohammed Ibahrine.
Introduction 12 VDC to 120 VAC Inverter Juan Tello This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
MEDIEVAL UNIT This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Computer Science Program Center for Entrepreneurship and Information Technology, Louisiana Tech University This presentation will probably involve audience.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Breeding Excellence Abroad A Journey In the Caribbean This presentation will probably involve audience discussion, which will create action items. Use.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Mid Term Report Integrated Framework, Visualization and Analysis of Platforms This presentation will probably involve audience discussion, which will create.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
Karl Marx The German Ideology A Contribution to the Critique of Political Economy Prepared by: Erin Mustard Jackeline Hernandez This presentation will.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
CSC 532 Term Paper Topic decision: 10/10/02 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Jean Slaughter –April 5, 2004 – all experimenters’ meeting Purposes of SDA Store to store monitoring of performance Long term trends Analysis of specific.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
THE BOOK BANK MAKERERE UNIVERSITY LIBRARY This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
How abstract components are returned when schema.getElementDeclarations() is called – an animation in 3 slides -- schemas that use and July 26, :00pm.
Irish Financial Regulator Requirements for Management of Liquidity Risk An Industry Perspective This presentation will probably involve audience discussion,
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Progress of Electron Cooling at the Recycler January 26 th, 2006 L. Prost, Recycler Dpt. personnel f Fermi National Accelerator Laboratory.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Project Status [Project Name] [Presenter Name] This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Health Resources and Services Administration Maternal and Child Health Bureau Presentation For DataSpeak May, 2003 Health Resources And Services Administration.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Recycler Operations and Studies July 23-30,2008 Meiqin Xiao.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
1 LoTAG conference – 11 th May 2015 LoHEG - London Highway Engineering Group Update Co-chair – Dale Foden/Ian Hawthorn This presentation.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
LoTAG conference – 1st March 2016
Continuous Random Variables
TMCI Observations in AD
Einstein’s Special and General Theories of Relativity.
Pretest Chapter 17 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Final Project Presentation
واشوقاه إلى رمضان مرحباً رمضان
Presented by: Arlene N. Baratang
Evaluation of Data Fusion Methods Using Kalman Filtering and TBM
Continuous Random Variables
IEEE Rail Transit Vehicle Interface Standards Committee
Baseline Matching / Grading
Test Flow: Acceptance & defect criteria The First half RUP summary
Final Presentation Wireless mouse over BLUETOOTH By: David Gabay
* L. E. Turner and M. R. Smith, University of Calgary, Alberta, Canada
Studies for TBT optics measurements in the PSB
7 - Managing - Misbehavior
Minnesota Counties Computer Consortium(MCCC) Community Registry
Presentation transcript:

Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered.

Recycler Pbar Transfer -Gattuso 2 Beam Lost  Third largest Stash lost (192 E10) It appears that QF buss in the Main Injector did not ramp down at high field invert. Differential quad bus currents of amps.  Machine parameter effected Closed orbit shifted by.5 mm in both plains Coupling changes in machine –Minimum Tune split changed by Magnetized E-Cool 90 and 180 bend magnets

Recycler Pbar Transfer -Gattuso 3 Record Stash Size  New Record of 437 E10  Problems encountered Tunes shift Stochastic Cooling –Transverse Vertical Cooling  Transfer eff Last transfer –ACC to RR 82% –Driven mainly by RR lifetime Normal Transfer Eff –ACC to MI 95% –MI to RR 93% –ACC to MI 90%

Recycler Pbar Transfer -Gattuso 4 First transfer Beam current RF cavity Gap monitor

Recycler Pbar Transfer -Gattuso 5 Damper power Vertical emittance jump Beam loss

Recycler Pbar Transfer -Gattuso 6 Shot 4645  Starting Intensity 417 E10  Emittance Longitudinal emittance 68 eVsecs –( eVsec per Parcel) Transverse 4-5pi  Pre instability Mining efficiency 96% Post(76%) Parcels 3-5 went unstable –Lost 78 E10 Would have extracted ~400e10 We did extract 316E10 (ties our best record) Gives us a very good insight to operations at the 550E10 level  Density Intensity/(long emitt* Trans emitt) 2.8 = 60 e10/((1.3 eVsecs*4)*4 pi) Normally 1.5-2

Recycler Pbar Transfer -Gattuso 7 Longitudinal Emittance

Recycler Pbar Transfer -Gattuso 8 Lifetime Benchmark