Together we can build something great FORWARD | 2016 Dimensional Material Sales & Purchases Bill Natalie.

Slides:



Advertisements
Similar presentations
Measuring Carpentry and Miscellaneous Items
Advertisements

CON 4003 Construction Estimating Prof R. V. Locurcio.
6.01 What is Merchandise Inventory?
Stock related security
Warehouse Management System Visit our website at
17 A – Cubic Polynomials 4: Modeling with Cubics.
A rectangular dog pen is constructed using a barn wall as one side and 60m of fencing for the other three sides. Find the dimensions of the pen that.
Bellwork November 1-5, Day 1: Question 1 The dimensions of Joe’s rectangular garden are 18 feet by 12 feet. Joe wants to conduct an experiment to.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
SALES CALL PRACTICE SEMINAR with Duane Weaver. OUTLINE Establish Two Sales Call Scenarios Form Groups of Three Observation/Score Conduct Sales Calls (5.
ISI Request For Quote Integrates with Microsoft Dynamics GP Inventory, Purchase Order Processing and Sales Order Processing Dynamics is a registered trademark.
Perpetual Inventory System
Ch 17 communicating solutions 1.Alphabet of lines- technical lines used in multi-view drawings.
Sinking in Concrete Calculating materials for a concrete job.
Labels 101 What you need to know to sell labels. In This Labels 101 Module Why sell labels? Label basics to get you started How to successfully sell labels.
New Tools to Increase Sales And to Enhance The User Experience.
Indicator 4.05 Process sales documentation. Identify types of information contained in sales documentation The document types can be tailored to meet.
Section 14.2 Application of Extrema
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Placing Promotional Product Orders through GROUP-BUYING.
Agricultural Mechanics Fundamentals & Applications
BILL OF MATERIALS. BEGINNING THOUGHTS ► IDENTIFY ONE MACHINE THAT YOU WILL USE TO BULID YOUR CONCRETE FLOAT? ► WHY MUST YOU USE A RULER WHILE BUILDING.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Pieces of the Puzzle: Costing, Pricing and Contracts Presented by: Rachel Johnsen The Systems House 06/13/11.
Dimensional Analysis Part 2 Chapter 2 Section 2 Units of Measurement.
CENTURY 21 ACCOUNTING © Thomson/South-Western LESSON 6-1 The Nature of Merchandise Inventory.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
 SAP AG 2007 Goods Receipts and Goods Issues Stock Transfers Contents: Inventory Transactions.
 SAP AG 2007 General Structure of Documents General Functions of Documents Contents: Document Handling.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
THE COST OF MANUFACTURING How much does manufacturing cost?
Do Now 9/16/15 A contractor gets a 5% discount from retail price at a supply company. If the retail price for her purchase was $8,420, what does she pay.
Chapter 9 Journalizing Purchases and Cash Payments.
GIMS 4.2A - Grid System for ACCPAC Advantage Series 1 GIMS 4.2A - Features Tour Grid System For ACCPAC Advantage Series
PRODUCT PLACE PRICE PROMOTION EACH MARKETING PLAN OF ACTION INCLUDES THESE 4 PS Marketing is the 4 Ps.
Texas Pipe & Supply System Request. Project Sponsor Mike Gillbert, Vice President of Texas Pipe and Supply Mike Gillbert, Vice President of Texas Pipe.
Precalculus Section 2.4 Use polynomials to find maximum and minimum values Example 1 page 69 Area = length x width A(x) = (60 – 2x)(x) A(x) = 60x - 2x².
The cutting list should contain the following data: 1. PART No. I.e. 1, 2, 3, etc. 2. NAME a description of the part, eg. top 3. QUANTITY required, e.g.
HKAS 2 Inventory. E8-9: Goods in transit Kwok’s inventory balance on December 31, 2009, was $165,000 (based on a 12/31/09 physical count) before considering.
Together we can build something great FORWARD | 2016 Change Order Management in contractERP – Best Practices Brian Mills and Ken Smith.
 One of the major tasks of business is to provide utility.  Utility means usefulness.  In a business context, utility means the ability of a product.
Together we can build something great FORWARD | 2016 FSM (Field Service Management) for contractERP Bill Natalie and Tracie Folscroft.
Together we can build something great FORWARD | 2016 Visual Scheduling and Data Collection (Scanning) Bill Natalie, Shawn Luginbuhl, Jim Welch.
Bill of materials: Include the following Item name Number of pieces Type of material Size of pieces Total feet of different material Unit cost Total project.
STAINED GLASS. Patterns.
Food and Beverage Operational Controls
Modeling Percents SWBAT model percents on a grid and find fraction and percent equivalencies.
HOLLY PACKAGING, Inc. & Mar-leen inc.
LESSON 6-1 The Nature of Merchandise Inventory
What is Added Value? “Added value” describes any activity carried out by the business that increases the value of its product or service. The actual “value.
Pricing Strategies.
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
Ciftpharma Enterprise
Catalog Search & Results
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Career & Technology Education
Chicago Overall Historical Space Available
RIVETS.
FLOW OF INVENTORY COSTS
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
Texas Pipe & Supply System Request.
Each marketing plan of action includes these 4 ps
Product Training Jobs Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Introduction to Bill of Materials
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
P3 Polynomials & Special Products
P.3B Polynomials and Special Factoring
Presentation transcript:

Together we can build something great FORWARD | 2016 Dimensional Material Sales & Purchases Bill Natalie

FORWARD | 2016 Dimensional Material Management: The ability to handle (stock, ship, receive) material by its physical quantity unit of measure (such as EA or PCS), Different scenarios within Dimensional Material Management: 1.Stocked Material with a known dimensional size 2.Special Ordered material with a known dimensional size 3.Non-standard Material, sold and special ordered by the size requirement while Pricing and Costing it in another (such as SQFT, LNFT, even MSF - Thousand Square Feet).

FORWARD | 2016 Stocked Material with a Static Dimensions Example #1: Quote to Sale of stocked building materials WB.5""4X10'LW, 2.5“X8'20GSTUD, PRELUDE12W Customer Belongs to Price Group – Volume Contractor Level 4 Sales Line Details: Drywall, Steel Studs, Grids

FORWARD | 2016 Special Ordered Material with Static Dimensional Size Example #2: Sale of SPECIAL ORDERED ITEM M1GR 24” x 24” MetalWorks Tegular - Gun Metal Grey Ceiling Tile Ordered in either Each, Carton or SQFT Sales Line Details: Special Ordered from Armstrong 480 Sheets (12 EA per CTN, 48 SF)

FORWARD | 2016 Custom Sized Non-standard Material Item Example #3: Custom Orders ¼” Polished Edge Tempered Glass. PE 1/4" TEMPERED Sales Line Details: Special Ordered from Interglass Corporation 2 Pieces Custom Size Example #4 (Coming Soon) Other Charges such as a Pattern Charge or Hole Cut Out Charge