Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Benchmark of ACCSIM-ORBIT codes for space charge and e-lens compensation Beam’07, October 2007 Masamitsu AIBA, CERN Thank you to G. Arduini, C. Carli,
Beam stability in the SPL - Proton Driver accumulator for a Neutrino Factory at CERN E.Benedetto (CERN) 21/7/09 NUFACT’09 Workshop, July ‘09.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Booster Beam Dynamics Christian Carli On behalf of the team working on and contributing to the study: M. Aiba did all ORBIT simulations (Booster modelling.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
GDR NEUTRINO - SESSION April, LPNHE Neutrinos options at CERN R. Garoby – 27/04/2009.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Summary of the Accelerator Working Group 1st ECFA LHeC Workshop; 1-3 September 2008, Divonne 1 First discussions started at CERN at the end of last year.
Linac4 Status 1 M. Vretenar sLHC public event
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
10 th January rd EuCARD TLEP3 workshop L. Rinolfi Review of the LEP Injector complex L.Rinolfi.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Status of work at CERN CERN-KEK committee meeting 8/12/2006 Masamitsu Aiba, CERN-JAPAN fellow.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Optics solutions for the PS2 ring February 11 th, 2008 LIS Section Meeting Y. Papaphilippou.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios CERN-KEK Committee, 3 rd meeting, Friday 12 December CERN Lucio Rossi – CERN/AT.
Name Event Date Name Event Date 1 CERN Super-LHC We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
CERN Large Hadron Collider
Optics considerations for PS2
Proton Driver Scenarios at RAL and CERN
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Injector and positron source scheme. A first evaluation Thanks to O
Plans for a Superconducting Proton Linac at CERN
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Superbeams with SPL at CERN
PS2 design status Y. Papaphilippou LIS section meeting
Progress towards Pulsed Multi-MW CERN Proton Drivers
potential CERN facilities to study proton-driven plasma acceleration
LHC (SSC) Byung Yunn CASA.
Optics solutions for the PS2 ring
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Joint session – Beta-beams
First meeting of the LIS section: Welcome to the new members!!
MEIC New Baseline: Luminosity Performance and Upgrade Path
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI

Introduction The 3rd CERN-JAPAN fellow: Since October 1st, 2006 The 1st fellow of accelerator researcher Department/Group: Accelerators and Beams / Beam Instrumentation Supervisor: Dr. Roland Garoby (BI leader, PAF WG chair)

Work plans Not only works for LHC injectors but also works for LHC commissioning Slide from 1 st CERN-KEK Committee meeting

Study items For injectors and PAF (Proton Accelerators for the Future) –Space charge issues and compensation with e- lens –Design of accumulator and compressor for SPL based proton driver For LHC –Beta-beating in commissioning phase A.4 –High-beta optics for ATLAS luminosity measurement

PSB SPS SPS+ Linac4 (LP)SPL PS LHC / SLHC DLHC Output energy 160 MeV 1.4 GeV 4 GeV 26 GeV 50 GeV 450 GeV 1 TeV 7 TeV ~ 14 TeV Linac2 50 MeV (LP)SPL: (Low Power) Superconducting Proton Linac (4-5 GeV) PS2: High Energy PS (~ 5 to 50 GeV – 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) SLHC: “Superluminosity” LHC (up to cm -2 s -1 ) DLHC: “Double energy” LHC (1 to ~14 TeV) Updated list of future accelerators PS2 Present acceleratorsFuture accelerators (LP)SPL is the baseline injector for PS2 PS2 will use nc magnets PS2 size is 15/77 of SPS Slide from BEAM’07 by R. Garoby Space charge issuesSPL based proton driver

Space charge issues PS-Booster beam is dominated space charge effects (tune shift ~0.4) –Effort from simulation side Benchmark of ACCSIM and ORBIT codes →Gives similar picture Simulation for new injection scheme with Linac4 –Investigation on “e-lens compensation” →Next slide

Electron lens compensation Idea –To neutralize space charge potential with electron beam –Ref: A.V.Burov, Q.W.Foster and V.D.Shiltsev, PAC01, P2896 Simulation with ORBIT –New module to introduce e-lens has been developed –First results: OK for tune spread but NG for emittance growth

SPL-Based Proton Driver for Neutrino Factory SPL 5GeV Accumulator Compressor t6 bunches 2 ns r.m.s. 12  s spacing 50 Hz 4 MW Possible lattices for accumulator and compressor have been found. Target M. Aiba, R. Garoby, M, Meddahi (CERN)

Simulation of bunch compression Results: phase space & bunch profile Hor. 1  mm-mrad Long. ±5MeV*120ns Bunch profile  =1.99 ns Ver. 2  mm-mrad

Beta-beating in LHC commissioning phase A.4 Beta-beating –Measure and correct LHC optics in early commissioning stage –Work with R. Calaga(BNL/AB-ABP), A. Morita(KEK/AB-ABP), R. Tomas(AB-ABP), G. Vanbavinckhove(Technische Universiteit Delft/AB-ABP), F. Zimmermann(AB-ABP) Beta-function measurement with phases Measure phases for 3 successive monitors Measurement error in arcs  /  ~4% (Allowable in early LHC~20%)

High-beta optics High-beta optics  *>2600m –For the luminosity measurement at ATLAS and TOTEM –Work with H. Burkhardt(AB-ABP), M. Giovannozzi(AB-ABP), S. White(Universite de Paris-Sud/AB-ABP) –One of optics issues: compensate the loss in betatron tune dQx~-0.5 and dQy~-1.0 High-beta optics, IR1(ATLAS) dQx~-0.2, dQy~-0.5 (by S. White) Compensation, IR2 dQx~0.0, dQy~+0.5

Publications AB-BI note: –“Memo for scaling-FFAG lattice design” –“Accumulator lattice design for SPL beam” –“Compressor lattice design for SPL beam” PAC07(co-author): –“SIMULATION OF THE CERN PS BOOSTER PERFORMANCE WITH 160MeV H− INJECTION FROM LINAC4”, F. Gerigk et. al. –“SPACE-CHARGE COMPENSATION OPTIONS FOR THE LHC INJECTOR COMPLEX”, F. Zimmermann et. al. NuFact07 (to be published): –“Accumulator and Compressor for the CERN SPL Proton Beam” Beam07 (to be published): –“BENCHMARK OF ACCSIM-ORBIT CODES FOR SPACE CHARGE AND ELECTRON-LENS COMPENSATION”

Remarks Studies for injectors and LHC are getting fruits. Thank you to Roland, colleagues at CERN, fellowship committee and CERN- KEK committee