1 Update from the Tent Thomas K Hemmick for the Tent People.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

INFN Trieste, October 2008 Summary of measurements on: CsI coated ThGEM triple CERN.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
T.K. Hemmick. Preparation for Next Test Beam SLAC ESTB (End Station Test Beam) Back ~1/3 of SLAC for light source. 120 Hz “moderate” beam 5 Hz (minimum)
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
CsI Photocathode Production and Testing
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
1 Stony Brook Update: A bit more on Negative Ions T.K. Hemmick for the Tent Crew.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
1 Stony Brook Update Jason Kamin… the Cleaning Machine! T.K. Hemmick.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
1 Some updates on water and other items… Stony Brook HBD Crew…
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
Completion of the MICE-US construction project
ELENA electron cooler and SEM grids status
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists.
HBD -- BRIEF T.K. Hemmick.
HBD Light RICH -- BRIEF T.K. Hemmick.
T.K. Hemmick for the Stony Brook Crew
Progress/Status on Cherenkov Beam Test
Presentation transcript:

1 Update from the Tent Thomas K Hemmick for the Tent People

2 GEMs in the house. First shipment excellent from 5/6 sides. Some dust visible from bottom. GEMs now in vacuum storage. –Heavy initial out-gassing. OVERNIGHT to get below 1x10 -4 torr. 2 days until torr. –Second pump down into range in 2 hours. Sorting task from database now done. –See Anne Sickles talk. Looking forward to getting more. –See Ilia’s talk.

3 Last week Railroad Success Railroad system transports cathodes from evaporator into glove box. System complete and tested in dry run last week. NOTE: Summer students have arrived BillJason GabbyBen MattGreg Ben-II

4 Gain box installed interior to Glovebox Gain test box now installed into glovebox. –BigMac feed-throughs –Added MgF 2 window. –Fresh He leak test (1 fixed). –Pump via diaphragm/sorption See 55 Fe today. Ready for full dry run. Rich Tom

5 HBD Support Cage Ready Cage test fit through removable window. Yup, it fits! Looking good for HBD vessel delivery.

6 Single pad gain vs time tests. Top GEM was previously coated w/ CsI & cleaned. Full gain reached after ~1 day. Rate of approach to full gain depends upon rate of source. Question: Could pad13 be full gain due to source and other pads not yet saturated?

7 Tests with CsI on the pads Same set of GEMS. CsI added. Test 4 different pads. All similar behavior…