MERIT status A.Fabich CERN VRVS 9 th Oct. 2007 A. Fabich, CERN, VRVS 9th Oct 2007.

Slides:



Advertisements
Similar presentations
Weather Discussion May 12, Supercell Mesocyclone?
Advertisements

Purpose of a VPA Filling & Metering Pump… Imagine having an employee who constantly measures out a precise dose of liquid whenever it’s needed.
OUR PLAN Expand our program options to serve our families better in
Mass Flow Controller. Function Delivers user specified flow rate of gas. Flow rate is mass flow rate (i.e. number of molecules per sec Mol/sec), not volume.
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
A few tips on writing a good forecast discussion: Monday, January 24 NWS Discussion as an example Atmo 456 Conlee/Seroka.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
BA271 Week 9 Lecture Using forms in Access. Status Report … Review where we are … –Midterm – Graded! –Final websites – Graded! –Access #1 – Graded! –Access.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
4/24/06 Lenses and Images, continued Friday’s Reading: Section 15.2: Optical Recording and Communication (pp. 489 – 497) Poster Meetings Wednesday 11 am:
Sequences and Series Day 2&3 Happy Monday
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Strawman TXR Deployment Test Plan For a Generic Host Chamber Joe Rice National Institute of Standards and Technology Gaithersburg, MD.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
© Institute for International Research, Inc All rights reserved. Module 6: Manufacturing Throughput.
01/10/ PHOS Cooling status (1 Oct) Incident happened (ECV failure) 1 Oct at 5 Am cooling plant failure happened: ECV (electrical.
Math Minutes - Monday  Find the slope given two points. (-4, 9) (-2, -8) (8, 0) (2, 0) 2) Find the slope of the table. XY ) Classify as.
Kelowna Secondary Grade 10/11 Parent Ambassadors December 5 th, 2013.
PRE-ALGEBRA. Reasoning Strategy: Working Backwards (5-6) You should work backwards if you know the end result and are looking for something that happened.
They call me…JDD “It’s better to lose sleep than friends”
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
CMPT 258 Database Systems Midterm Review. Regarding the Exam Oct 15 Thursday Close book Cheat sheet (1 side of an A4 paper)
MONDAY MARCH 23, 2015 WOD- TEMPERATURE A MEASUREMENT FOR THE SENSATION OF “HOW HOT” OR “HOW COLD” 6.9 A Objective- I will… learn the types of heat and.
Thermodynamics Project Monday, February 1, Monday, 2/1 Upcoming dates:  Wednesday, 2/3 – Thermodynamics quiz  Wednesday, 2/3 – Thermodynamics.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
Monday October 5, 2015 WARM-UP: QUESTION #1 WEEK OF OCT 5 QUESTION - DESCRIBE HOW THE RESPIRATORY SYSTEM AND THE CIRCULATORY SYSTEM WORK TOGETHER. Unit.
Thermodynamics Project Tuesday, February 2, 2016.
Dhani 5A. Length of flight 1 hour,43 minutes Time zone Singapore is 1 hour ahead of surabaya Departure 10 January 2012 Tuesday 5:00 am Arrive 05:00+01:43+01:00=7:43.
RunToShop 1: Project plan estimates for the end of the course.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
Problem of the Week! Delvin exercised 3 days each week. He ran 2 miles on his treadmill, rode his bike for 30 minutes and lifted weights for 15 minutes.
A group of hikers climbed from Salt Flats (elevation -55 feet) to Talon Bluff (elevation 620 feet). What is the difference in elevation between Talon Bluff.
How it works the Kanban ? The definitive slideshow to understand how it works the Kanban Method Example 1 – Point of Use / Warehouse.
My Plan to Go to Around the world By: Benedict/5C.
BACON’S COLLEGE PE DEPARTMENT This Girl Can Project.
Recycler Operations and Studies July 23-30,2008 Meiqin Xiao.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Budapest Prepared for Experience Europe Students, May 31, 2012.
Need Help With Trig graphs? Then this workshop is for YOU! Where: MS109 When: Wednesday March 16 th and Thursday March 17 th When: 11:30 – 12:30 All Math.
MERcury Intense Experiment Experiment Layout
Water Leak.
Status on the PS/SPS  MERIT (nTOF11) interface
Twenty Questions Subject: Time.
Instructions: Adding refrigerant fluid to system
MERIT – status and schedule
Presentation transcript:

MERIT status A.Fabich CERN VRVS 9 th Oct A. Fabich, CERN, VRVS 9th Oct 2007

Logbook Monday 8 Oct, morning: – Hg primary at 77 deg C – Solenoid at 150 K typically Monday afternoon: access – Optics repaired – Mercury loop closed (without Allen screws) – Set point at 30 degC (primary) and 20 degC (secondary); secondary temperature sensor at downstream end (cone/outside). Monday evening: – cooling initiated to 90 K (at % LN2 filling level) Tuesday 9 Oct, morning (6:30): – Reached 90 K – Mercury stabilized at deg C Tuesday afternoon (14:00-14:30): – Nominal cooling cycle with 100% filling level and emptying A. Fabich, CERN, VRVS 9th Oct 2007

Frontend during cryo-cycle A. Fabich, CERN, VRVS 9th Oct am 2:30pm 2:55pm 4:10pm

Temperature readings A. Fabich, CERN, VRVS 9th Oct 2007

Recommendations and future actions Wednesday afternoon: Mercury test drive – Allen screws not fixed. Issue? – Front screw not in place. Issue? Thursday afternoon: access ~2h – Fine adjustment of optics 10 minutes opening primary (all) 30 minutes last adjustments for optics (HP) 20 minutes closing primary (all) 60 minutes putting system in nominal position (AB/ATB, transport) – Verify vacuum how to open valve at lower solenoid? – Connect solenoid power – Assure feed-throughs without ice/water. This causes short-circuits. – HIPOT test – Cleaning of the area. A. Fabich, CERN, VRVS 9th Oct 2007