Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios We acknowledge the support of the European Community-Research Infrastructure Activity.

Slides:



Advertisements
Similar presentations
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
LHC Crab Crossing Frank Zimmermann LHC-CC09. Large Hadron Collider (LHC) proton-proton and ion-ion collider next energy-frontier discovery machine c.m.
Long-range beam-beam compensation at HL-LHC Tatiana Rijoff, Frank Zimmermann ColUSM # /03/2013.
“LHC-CC08” Joint BNL/US-LARP/CARE-HHH Mini-Workshop on Crab Cavities for LHC Frank Zimmermann Thanks to Ilan Ben-Zvi, Rama Calaga, Walter Scandale, Yi-Peng.
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann Special PAF meeting We acknowledge the support of the European.
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann ACES workshop We acknowledge the support of the European Community-Research.
Name Event Date Name Event Date 1 SLHC Machine Plans We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities fundamental limitations to the ultimate performance of high-luminosity.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
Thoughts on crab cavity noise, Fritz Caspers, Bandwidth of cavity structure with loaded Q is nearly always MUCH higher than generator bandwidth.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
Beam-beam studies in the LHC and new projects T. Pieloni for the LHC and HL-LHC Beam-Beam Teams ICFA mini-workshop on "Beam-Beam Effects in Hadron Colliders”
Summary of the Accelerator Working Group 1st ECFA LHeC Workshop; 1-3 September 2008, Divonne 1 First discussions started at CERN at the end of last year.
Scenarios for the sLHC and the vLHC Walter Scandale, Frank Zimmermann CERN HCP2007 We acknowledge the support of the European Community-Research Infrastructure.
Update on LHC Upgrade Plans Frank Zimmermann ATLAS Upgrade Week Tuesday 10 November 2009.
Frank Zimmermann, LHCb Upgrade Meeting Overview of LHC Machine Upgrade Plans from an LHCb Perspective - Frank Zimmermann LHCb Upgrade Meeting CERN, 5 August.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
CERN Upgrade Plans for the LHC and its Injectors Frank Zimmermann EPS HEP 2009 EPS HEP 2009 Krak ó w, 17 July 2009 Krak ó w, 17 July 2009.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios CERN-KEK Committee, 3 rd meeting, Friday 12 December CERN Lucio Rossi – CERN/AT.
Name Event Date Name Event Date 1 CERN Super-LHC We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Issues related to crossing angles Frank Zimmermann.
Turnaround time in modern hadron colliders & store-length optimization
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
Collision with a crossing angle Large Piwinski angle
CERN Upgrade Plans for the LHC and its Injectors
contribution to the round table discussion
LUMI06 preliminary conclusions
fundamental equations of LHC performance
Study of the Heat Load in the LHC
Study of the Heat Load in the LHC
LHC Accelerator Upgrade
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Jean-Pierre Koutchouk, Frank Zimmermann
Scenarios for the LHC Upgrade
Measurements, ideas, curiosities
Progress towards Pulsed Multi-MW CERN Proton Drivers
potential CERN facilities to study proton-driven plasma acceleration
LHC (SSC) Byung Yunn CASA.
Possible Scenarios for an LHC Upgrade
Frank Zimmermann & Walter Scandale
SLHC-PP kick-off meeting, CERN 9 April 2008
High Energy High Intensity Hadron Beams
LHC Machine Advisory Committee, CERN 12th June 2008
MEIC New Baseline: Performance and Accelerator R&D
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring the European Research Area" programme (CARE, contract number RII3-CT ) W. Scandale & F. ZimmermannNovember 2008 W. Scandale, F. Zimmermann CERN

outline motivation & staged approach upgrade scenarios & luminosity levelling injector upgrade & schedule crab cavities complementary advanced schemes - LR + HO beam-beam compensation, e-cloud mitigation, crystal collimation, cooling, crab waists,… strategy for “phase 2”

Three Strong Reasons for LHC Upgrade J. Strait ) after few years, statistical error hardly decreases 2) radiation damage limit of IR quadrupoles (~700 fb -1 ) reached by ~2016 = → time for an upgrade! 3) extending physics potential! (A. de Roeck et al) hypothetical luminosity evolution

staged approach to LHC upgrade “phase 1” 2013: new triplets, D1, TAS,  *=0.25 m in IP1 & 5, reliable LHC operation at ~2-3x luminosity; beam from new Linac4 “phase 2” 2017: target luminosity 10x nominal, possibly Nb 3 Sn triplet &  *~0.15 m complementary measures : e.g. long-range beam-beam compensation, crab cavities, new/upgraded injectors, advanced collimators, coherent e- cooling??, e- lenses?? longer term (2020?): energy upgrade, LHeC,… phase-2 might be just phase 1 plus complementary measures + injector upgrade

Name Event Date Name Event Date7 LHC phase-2 upgrade paths for IP1 & 5 ultimate beam (1.7x10 11 p’s/bunch, 25 ns spacing),  * ~10 cm ultimate beam (1.7x10 11 p’s/bunch, 25 ns spacing),  * ~10 cm early-separation dipoles in side detectors, crab cavities early-separation dipoles in side detectors, crab cavities → hardware inside ATLAS & CMS detectors, first hadron crab cavities; off-  stronger triplet magnets D0 dipole small-angle crab cavity J.-P. Koutchouk early separation (ES) stronger triplet magnets small-angle crab cavity ultimate LHC beam (1.7x10 11 p’s/bunch, 25 ns spacing) ultimate LHC beam (1.7x10 11 p’s/bunch, 25 ns spacing)  * ~10 cm  * ~10 cm crab cavities with 60% higher voltage crab cavities with 60% higher voltage → first hadron crab cavities, off-  -beat L. Evans, W. Scandale, F. Zimmermann full crab crossing (FCC) wire compensator larger-aperture triplet magnets 50 ns spacing, longer & more intense bunches (5x10 11 p’s/bunch) 50 ns spacing, longer & more intense bunches (5x10 11 p’s/bunch)  *~25 cm, no elements inside detectors  *~25 cm, no elements inside detectors long-range beam-beam wire compensation long-range beam-beam wire compensation → novel operating regime for hadron colliders, beam generation F. Ruggiero, W. Scandale. F. Zimmermann large Piwinski angle (LPA) stronger triplet magnets ultimate LHC beam (1.7x10 11 p’s/bunch, 25 ns spacing) ultimate LHC beam (1.7x10 11 p’s/bunch, 25 ns spacing)  * ~10 cm  * ~10 cm smaller transverse emittance smaller transverse emittance → constraint on new injectors, off-  -beat R. Garoby low emittance (LE)

Name Event Date Name Event Date8 basic idea: reduce  to compensate for larger Piwinski angle and get the full benefit of IR upgrade; at the same time the smaller emittance relaxes aperture constraints → possible implications for the injection design “LE”: rationale for lower emittance (R. Garoby); fundamental equations of LHC performance

Name Event Date Name Event Date bunches with 7.55 cm length, ultimate bunch intensity 1.7x10 11, 9.5  sep. [10 34 cm -2 s -1 ]  [  m]  *=0.1 m  *=0.5 m  *=0.25 m 5 h turnaround  Q tot  [  m]  *=0.1 m  *=0.5 m  *=0.25 m and  Q vs. emittance ultimate Gaussian bunches, 25 ns [10 34 cm -2 s -1 ]  [  m]  *=0.1 m  *=0.5 m  *=0.25 m 5 h turnaround  Q tot  *=0.1 m  *=0.5 m  *=0.25 m  [  m] 1404 bunches with 41 cm full length, bunch intensity 4.9x10 11, 8.5  sep. long flat “LPA” bunches, 50 ns

Name Event Date Name Event Date10 luminosity gain from smaller emittance for Gaussian ultimate bunches and  *~ m, emittance reduction from 3.75 to 2 micron yields ~40-50% higher integrated luminosity; a smaller emittance reduction to 2.6 micron gives ~22-27% av. luminosity increase for long flat bunches and  *~0.25, emittance can be reduced only to 3 micron (tune shift limit), and the luminosity gain here is 13% for comparison the luminosity gain from crab cavities would be ~90% for  *~0.1 m

parametersymbolnominalultimateESFCCLELPA transverse emittance  [  m] protons per bunchN b [10 11 ] bunch spacing  t [ns] beam currentI [A] longitudinal profile Gauss Flat rms bunch length  z [cm] beta* at IP1&5  [m] full crossing angle  c [  rad] Piwinski parameter  c  z /(2*  x *) geometric reduction peak luminosityL [10 34 cm -2 s -1 ] peak events per #ing initial lumi lifetime  L [h] effective luminosity (T turnaround =10 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] effective luminosity (T turnaround =5 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] e-c heat SEY=1.4(1.3)P [W/m] 1.1 (0.4) 1.04(0.6)1.0 (0.6) 0.4 (0.1) SR heat load KP SR [W/m] image current heatP IC [W/m] gas-s. 100 h (10 h)  b P gas [W/m] 0.04 (0.4) 0.06 (0.6)0.06 (0.56) 0.09 (0.9) extent luminous region  l [cm] comment nominalultimateD0 + crab crabwire comp.

Name Event Date Name Event Date12 average luminosity vs  * assuming 5 h turnaround

Name Event Date Name Event Date progress with all 4 scenarios ES: 2008 SPS beam studies; beam-beam working meeting August 2008; detailed design & discussion with experiments; → G. Sterbini, J.-P. Koutchouk FCC:two mini-workshops, global collaboration, joint studies with KEKB team; staged approach → R. Calaga LPA: 2008 simulations & PS beam study → C. Bhat LE: 2008 proposal (R. Garoby); parameter study → discussion?!

Name Event Date Name Event Date14 luminosity leveling ES or FCC LPA average luminosity initial luminosity peak may not be useful for physics (set up & tuning?) experiments prefer ~constant luminosity, less pile up at start of run, higher luminosity at end ES, or FCC: dynamic  squeeze, or dynamic  change (either IP angle bumps or varying crab voltage); LE:  or  change; LPA: dynamic  squeeze, or dynamic change of bunch length how can we achieve this? LE

Name Event Date Name Event Date15 25 ns spacing 50 ns spacing IP1& 5 event pile up for 25 & 50-ns spacing w/o leveling ES, EL or FCC LPA

LHC Upgrade Beam Parameters, Frank ZimmermannPAF/POFPA Meeting 20 November 2006 run time & average luminosity w/o levelingwith leveling luminosity evolution beam current evolution optimum run time average luminosity

LHC Upgrade Beam Parameters, Frank ZimmermannPAF/POFPA Meeting 20 November 2006 ES, low  *, with leveling LPA, long bunches, with leveling events/crossing 300 run time N/A2.5 h av. luminosityN/A2.6x10 34 s -1 cm -2 events/crossing 150 run time 2.5 h14.8 h av. luminosity2.6x10 34 s -1 cm x10 34 s -1 cm -2 events/crossing 75 run time 9.9 h26.4 h av. luminosity2.6x10 34 s -1 cm x10 34 s -1 cm -2 assuming 5 h turn-around time examples

50-ns upgrade with 25-ns collisions in LHCb upgrade bunch structures 25 ns 50 ns nominal 25 ns ultimate & 25-ns upgrade (ES & FCC) 50-ns upgrade (LPA), no collisions in LHCb! 50 ns 25 ns

Name Event Date Name Event Date 19 CERN W. Scandale & F. ZimmermannHHH, CARE Meeting, CERN, experimenters’ choice (LHCC July 2008) no accelerator components inside detector lowest possible event pile up possibility of easy luminosity levelling → full crab crossing upgrade → and/or low-emittance upgrade?

Name Event Date Name Event Date21 LHC injector upgrade Reasons: need for reliability: need for reliability: accelerators are old [Linac2: 1978, PSB: 1975, PS: 1959, SPS: 1976] accelerators are old [Linac2: 1978, PSB: 1975, PS: 1959, SPS: 1976] they operate far from their design parameters and close to hardware limits they operate far from their design parameters and close to hardware limits the infrastructure has suffered from the concentration of resources on LHC during the past 10 years the infrastructure has suffered from the concentration of resources on LHC during the past 10 years need for better beam characteristics need for better beam characteristics Roland Garoby, LHCC 1July ‘08

Name Event Date Name Event Date22 PSB SPS SPS+ Linac4 ( LP)SPL PS LHC / SLHC DLHC Output energy 160 MeV 1.4 GeV 4 GeV 26 GeV 50 GeV 450 GeV 1 TeV 7 TeV ~ 14 TeV Linac2 50 MeV (LP)SPL: (Low Power) Superconducting Proton Linac (4-5 GeV) PS2: High Energy PS (~ 5 to 50 GeV – 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) SLHC: “Superluminosity” LHC (up to cm -2 s -1 ) DLHC: “Double energy” LHC (1 to ~14 TeV) Proton flux / Beam power present and future injectors PS2 Roland Garoby, LHCC 1July ‘08

layout of the new injectors SPS PS2 SPL Linac4 PS R. Garoby, CARE-HHH BEAM07, October’07; L. Evans, LHCC, 20 Feb ‘08

R. Garoby, LHCC 1 July 2008 injector upgrade schedule synchronized with LHC IR upgrades LHC IR phase 1 LHC IR phase 2

Collimation phase 2 Linac4 + IR upgrade phase 1 New injectors + IR upgrade phase 2 ATLAS will need ~18 months shutdown goal for ATLAS Upgrade: 3000 fb -1 recorded cope with ~400 pile-up events each BC M. Nessi, CARE-HHH LHC crab-cavity validation mini-workshop August 2008, R. Garoby, LHCC July 08

LHC Luminosity/Sensitivity with time 100 fb -1 /yr SHUTDOWN 1000 fb -1 /yr 200 fb -1 /yr fb -1 /yr First physics run: O(1fb -1 ) ADD H(120GeV)   F. Moortgat, A. De Roeck A. de Roeck, 2007

“Piwinski angle” luminosity reduction factor without crab cavity nominal LHC  c /2 effective beam size  →  /R  crab cavity motivation “LPA” upgrade “FCC” upgrade

CARE-HHH LHC Crab Cavity Validation Mini-Workshop, 21 August 2008 Bob Palmer invention 1988 crabbed beams in KEKB first use in operating ring collider 2007 LHC global crab LHC local crab global & local schemes considered for LHC  KEKB experience  R&D plan  phased approach: (1) prototype (2) “global” crab cavity test in IR4, (3) “local” crab cavities in IR1 & 5  EuCARD, US-LARP & international collaboration

1. Beam-beam studies: a. K. Ohmi (KEK) - white noise - SS & WS simulations, BBSS code, scaling law with respect to noise correlation time, effect of RF curvature, luminosity estimates b. Y.-P. Sun, U. Dorda, R. Tomas (CERN); R. Calaga (BNL) – single particle dynamics, Sixtrack/MADX/BBTRACK codes WS simulations, footprints, luminosity, noise spectrum,… c. J. Qiang (LBNL), SS simulations, BeamBeam3D code 2. Collimation & impedance: a. Y.-P. Sun, R. Tomas, J. Barranco, F. Zimmermann (CERN); R. Calaga (BNL) – Sixtrack/Colltrack tracking, cleaning efficiency b. F. Zimmermann, E. Metral (CERN); R. Calaga (BNL),…: impedance estimates and HOM damping requirements 3. Operational scenarios: a. A. Morita (KEK); R. Calaga (BNL); R. Tomas, F. Zimmermann (CERN): crab ramping/detuning studies b. K. Oide et al (KEK): joined KEKB machine experiments & studies global crab-cavity simulation & theory effort

example: Yi-Peng Sun IP bunch shapedynamic aperture tracking for global 800-MHz crab cavity

another example: emittance growth due to crab up/down ramping with tune spreadw/o tune spread Akio Morita → no emittance dilution for ramp time > 10 turns → voltage ramping not a problem for Q loaded >10 6 Akio Morita

Name Event Date Name Event Date 33 tentative schedule for crab-cavity prototype & first beam tests schedule T. Linnecar, HHH Crab-Cavity Validation Workshop August 2008 local crab cavities together with IR phase-2 ~2017 ?

 beam-beam compensation  crab waist collision  electron-cloud mitigation  crystal collimation  cooling

long-range beam-beam compensation LR beam- beam in LHC prototype compensator in the SPS distance [mm] lifetime vs separation at various tunes G. Sterbini, J.-P. Koutchouk U. Dorda, et al, SPS MD August 2008 compensation efficiency with 2 wires

cryostat around cold beam pipe two-stage pulse tube cryocooler Ic (A) B (T) Ex-situ, 1.1 mm  MgB 2 wire (Columbus) MgB 2 conductor high-Tc s.c. LRBB compensator A.Ballarino, CARE-HHH mini-workshop, 28 August 2008

Name Event Date Name Event Date 37 electron lens use of e-lens as tune-spread compressor improves simulated LHC beam lifetime (phase to IP important) A.Valishev, CARE-HHH mini-workshop on beam-beam Compensation, 28 August 2008

 beam-beam compensation  crab waist collision  electron-cloud mitigation  crystal collimation  cooling

Name Event Date Name Event Date 39 crab-waist collisions crab-waist collisions K. Ohmi vertical focus moves through the beam horizontally

Name Event Date Name Event Date 40 “crab-waist” collisions at DAFNE (note: no crab cavities but sextupoles!) luminosity current product w/o crab waist with crab waist can we make use of crab waists at the LHC? C. Milardi

Name Event Date Name Event Date 41 crab waist in LHC? one example:  =3.5 in LPA option  y squeezed to  x /  =2.1cm (extreme!) → L increases (14/2.1) 1/2 =2.6 times →  y decreases and  x is small for LPA → “crab waist has a chance to work!” K. Ohmi CARE-HHH mini-workshop 28 August ‘08

Name Event Date Name Event Date 42 another use of “crab-waist”: push beam halo away from opposing beam at LR collisions K. Ohmi

 beam-beam compensation  crab waist collision  electron-cloud mitigation  crystal collimation  cooling

Humberto Maury Cuna, CINVESTAV, Mexico, FP7 EUROLUMI collaboration! e- heat load for 25 ns spacing “ultimate” ES/FCC upgrade nominal cooling capacity for 0.55 m  * SEY up to 1.4 OK with dedicated IR cryoplant

(longer flat bunches) Humberto Maury Cuna, CINVESTAV, Mexico, FP7 EUROLUMI collaboration! e- heat load for 50 ns spacing LPA upgrade need for dedicated IR cryoplant IRs SEY up to 1.5 OK

Name Event Date Name Event Date 46 Evaporation of metals in relatively high pressure of a rare gas produces very rough and porous films. Already mentioned in the literature, “gold black” has been produced and characterized. Gold black deposited by evaporation in Kr (0.5 mbar) e-cloud mitigation for PS2 & SPS upgrade; effort triggered by HHH ECL’2 workshop P. Chiggiato et al promising: graphite coating on black gold substrate no dependence on time of exposure to air

Space Plasma Environment and Spacecraft Charging incident and emitted currents that result in spacecraft charging ESA funded R&D I. Montero, HHH-APD ECM'08 (Electron Cloud Mitigation 2008) Secondary Electron Emission

synergies with satellite R&D D. Raboso (ESA/ESTEC), MULCOPIM’08

Micro-structured Gold Coating Aluminum alloy Nickel 10 μm Electroplatin g Ni + Ag Silver Sputtering deposition 2μm Au Chemical etching Sil ve r Gold Chemical Etching and Sputtering ESA funded SEY research (UAM & CSIC) CuO Nanowires Growth Gold-Coated Aluminum Particles Sputtering 5 nm Au Surface profile line scan Aluminum alloy substrate Sprinkled Al particles Gold-Coated Micrometrical Ceramic Particles Aluminum alloy substrate Sputtering 25 nm Au Indentation of micro-metrical ceramic particles I. Montero, HHH ECM’08 mini-workshop

ESA funded SEY research (UAM & CSIC) I. Montero, HHH ECM’08 mini-workshop Dispersed Micrometrical Magnetic Particles Gold-Coated Dispersed Nanometrical Alumina Particles Flat 50 nm Gold CuO Nanowires Growth Micro-structured Gold Coating Chemical Etching and Sputtering Methods Gold-Coated Micrometrical Alumina Particles Preliminary results!!

 beam-beam compensation  crab waist collision  electron-cloud mitigation  crystal collimation  cooling

Name Event Date Name Event Date 52 crystal collimation experiments in SPS North area since result: crystal deflection of negative pions and muons parallel simulation effort approved experiment in SPS ring proper W. Scandale et al

 beam-beam compensation  crab waist collision  electron-cloud mitigation  crystal collimation  cooling

Name Event Date Name Event Date 54cooling lower beam emittance can compensate for luminosity loss due to large crossing angle [R. Garoby] may be provided by new injectors and/or by “coherent e- cooling” [V. Litvinenko] CeC proof-of- Principle experiment at RHIC in 2012 damping times in hours: promise of 1-hr damping time at 7 TeV!

Name Event Date Name Event Date 56 strategy for “phase 2” R&D program for larger-aperture higher-field magnets in parallel crab-cavity development and testing design, production & installation of wire compensator already in “phase 0” monitor complementary schemes, like crab waist, coherent e-cooling, e-lenses, crystal collimation; integrate them into upgrade plan when they become available validation generation method for long flat bunches identify main limitations of the real LHC LHC & injector machine studies to explore upgrade scenarios, e.g. LPA and LE close coordination with detector upgrades

generated tracks per crossing, p t > 1 GeV/c cut, i.e. all soft tracks removed! cm -2 s -1 I. Osborne