Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen 05.10.2012 ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
The KM3NeT Neutrino Telescope Uli Katz ECAP / Univ. Erlangen th International Workshop on Ring-Imaging Cherenkov Detectors (RICH 2010) Cassis,
Neutrino Astronomy with KM3NeT was: Mediterranean Neutrino Telescopes - Status and Future Uli Katz ECAP / Univ. Erlangen International School.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
News from KM3NeT Uli Katz ECAP / Univ. Erlangen MANTS Meeting, Garching, October 2013.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.
G. Riccobene, INFN-LNS Nikhef, May 24-25, 2012 Giorgio Riccobene INFN-Laboratori Nazionali del Sud Abyssal undular vortices in the Eastern Mediterranean.
WPC Status Report KM3NeT General Assembly, Catania, 22/2/2011 Paschal Coyle, CPPMarseille legal, governance, financial engineering and site issues of the.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
Neutrino telescopes: ANTARES and KM3NeT Maarten de Jong Programme: Group composition (current): 6+2 staff, 4 post-doc, 4 PhD. Vidi 1, Veni 1+1.
KM3NeT – Stautus and Future Uli Katz ECAP / Univ. Erlangen th International Workshop on Next Generation Nucleon Decay and Neutrino Detectors.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Calibration and Instrumentation: Overview and General Issues Robert Lahmann WPFL meeting Amsterdam 6-July-2010.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
2012 a year of transition Paschal Coyle, Mauro Taiuti, E. de Wolf IB-meeting, 29 January 2013, CPPM.
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
DOM & DU tendering and assembly
Status Optical System KM3NeT
Deep-sea neutrino telescopes
PPM: Description of the KM3NeT network by WP H
KM3NeT multi-km3 neutrino telescope: perspectives
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
KM3NeT 2.0 Kick-off meeting, Athens,
Els de Wolf 20 February 2012, Catania
miniDOM report Vlad Popa
The KM3NeT Phase-1 Memorandum of Understanding
Data transport architecture over fiber and/or copper
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
KM3NeT institute board meeting
KM3NeT: where are we and where do we go
Presentation transcript:

Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012

U. Katz: Report from Erlangen Meeting 2 Agree on strategy for KM3NeT construction phase 1, using the available resources within their restrictions If not: Agree why there is no agreement Issues addressed: Technology Time lines MoU Participants: Marco Anghinolfi, Tasos Belias (observer), Edward Berbee, Tonino Capone, Marco Circella, Paschal Coyle, Eric Heine, Maarten de Jong, Uli Katz (chair), Paul Kooijman, Antoine Kouchner (tel.), Patrick Lamare, Daniel Lambert, Magalie Magne, Riccardo Papaleo, Paolo Piattelli, Mauro Taiuti, Claude Vallee Scope/aim of the meeting, participants

U. Katz: Report from Erlangen Meeting 3 Strings (France, NL, Romania, INFN): DOM prototyping & field tests PMT procurement Backbone cable validation Deployment technology (LOM) Towers (Italy, fall-back to “NuOne solution”) Preparation for production Sea-bed networks Toulon: In MEUST framework, for strings Capo Passero: For strings and towers Current activities

U. Katz: Report from Erlangen Meeting 4 22/06/ KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef Two assembly- tables for top hemisphere, pmt’s and electronics. Assembly of bottom hemisphere, pmt’s with bases and signal collection board Storage for components, sufficient for one day. Gel-filling for top-and bottom hemisphere + test before filling. Storage-buffer for ready and partly ready products. Test setup for both top and bottom- hemispheres. Assembly of dom’s, simple end check. Packaging and transport. Storage-buffer for empty (rolling) tables. DOM production site Edward Berbee

U. Katz: Report from Erlangen Meeting 5 Production Hall (available) 45 m x 3 m Sufficient light Tooling Vacuum equipment available Oil fill equipment available Temperature equipment for curing glue being prepared Personal tooling being collected Test tooling (OTDR, Voltage, etc.) available Procedures Assembly of the VEOC available Assembly of penetrator available Oil fill of VEOC available Acceptance tests (to trap assembly failures) being defined Production schemes 3Q12 Test cable (fibres under surveillance) (Atlantic at 5000m and/or Toulon area; test programme being defined) 4Q12 Cable for 3 PPM-DOMs >4Q12: 4 x test cables for integration test programme with string/LOM Oil filling equipment Eric Heine

U. Katz: Report from Erlangen Meeting 6 Scope of work #20 storeys #8 m bar length #40 m distance between storeys #100 m distance between base and first storey #6 SOM on each storey #2 Hydro on each storey Oceanographic instrumentations on the tower structure Length of storey, inter storey distance, SOM location and orientation may be adjusted to optimize physics Riccardo Papaleo

U. Katz: Report from Erlangen Meeting 7 JJD Catane 20/02/ V, 44 KW 3100 V, 38 KW 26 KW 25 KW 13 KW 12 KW Tendering for MEOC procurement and (MEOC+node) deployment completed. Last discussions ongoing with ALCATEL and France Telecom Marine. Order to be placed before 22/08/12 Power transport optimized in consulation with external company Checked at full load with simulation of final components 12 KW effective per node, 9 KW for DUs 500W / user port Claude Vallee

U. Katz: Report from Erlangen Meeting 8 Scope of work SJB#1 SJB#2 SJB#3 SJB#4 Primary JB 8 Outputs Capo Passero Termination Frame Capabilities: 20 Optical Fibers G KV 50 kW 8 Outputs Riccardo Papaleo

U. Katz: Report from Erlangen Meeting 9 Italian (sub)project financed through ERDF/Sicily (PON): 20 M€ must be spent by March 2015 Installation must exist (?) at same time scale (?) France, Netherlands: Mixed technology unacceptable for MoU Germany, Romania: Mixed technology may be adverse to funding prospects Romania: MoU needed to secure/release money Strategic constraints

U. Katz: Report from Erlangen Meeting 10 The string design is considered as the baseline KM3NeT detection unit subject to its validation; Italian groups will contribute to the validation of the string detection unit; The Italian PON budget will be used for a seafloor network at the Capo Passero site, and several detection units (towers and strings); the seafloor network will be designed to be compliant with both strings and towers; The seafloor network at the Capo Passero site will accommodate an additional number of strings produced by the KM3NeT Collaboration, at least equal to the number of strings realized with the PON budget; The tower construction will be planned in a staged way in order to switch to the string design at any time and as soon as it has been validated; The French budget for a neutrino telescope in the scope of the KM3NeT- MEUST project will be used to realize a shore station, a seafloor network in the Toulon area and several string detection units; The seafloor network at the Toulon site will be designed to accommodate string detection units; The Netherlands and Romania budgets will be used for the construction of string detection units. The agreement

U. Katz: Report from Erlangen Meeting 11 Current management election process is stalled Search committee (Paschal Coyle, Els de Wolf, Mauro Taiuti) have been asked to manage path towards MoU and first elections under this MoU Time scale: “agreed” MoU draft by October 2012 (optimistic), latest end-2012 MoU should be open to partners who have no secured funding as yet (in-kind contributions, etc.) Part of the NL money will be used to install ERIC in Amsterdam Towards management and MoU