© 2015 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 Results of PGE’s EIM Comparative Study OPUC Public Meeting Tuesday,

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
NORTHWEST POWER POOL Reliability Update
NWPP Members’ Market Assessment and Coordination Initiative Update NWPP MC Update for WECC IS-AS April 22, 2015 Facilitator: Dan Williams, PGE.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
PacifiCorp-CAISO EIM Initiative Overview
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Presentation to WECC Market Interface Committee March 24, 2015
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
1 The Northwest Wind Integration Action Plan Status Update December 14, 2010.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Avista Wind Integration Thoughts Clint Kalich, Avista Utilities (509) Wind Integration Forum Technical Workgroup.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
NWTC Wind Integration: What Have We Learned? Michael Milligan Consultant National Renewable Energy Laboratory Planning for Wind Workshop NW Power & Conservation.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
NWPP Members’ Market Assessment and Coordination Initiative WECC Market Interface Committee October 14, 2015.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
Northwest Power and Conservation Council The Northwest Forecast – Energy Efficiency Dominates Resource Development Tom Eckman Manager, Conservation Resources.
Monterey Plaza Hotel October 8-10, 2007
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Energy Imbalance Market (EIM) Dan Dettmer Board Meeting February 16, 2011.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Update on Utility Integrated Resource Plans
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
PacifiCorp-CAISO-NVE EIM Initiative Overview
Forecasting and Operations CAISO Case
Update on Energy Imbalance Market
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

© 2015 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 Results of PGE’s EIM Comparative Study OPUC Public Meeting Tuesday, December 1, 2015

Slide 2 Agenda  Overview of Study and Findings  Quantitative Analyses  Overview  Key Assumptions  Results  Qualitative Analyses  Need for New Generation  Reliability  PGE’s EIM Readiness

Slide 3 Overview  PGE studied its two opportunities for participation in a sub-hourly market.  Western EIM  NWPP MC SCED  Benefits evaluated include:  Benefits of going to 5-minute dispatch.  Diversity benefits of joining an EIM.  Potential reliability benefits of participating in an EIM.  Potential benefits of deferring or eliminating the need for new generation or other flexible resources.  PGE’s EIM readiness activities now focused on Western EIM participation.  PGE anticipates participating in the Western EIM beginning in October 2017.

Slide 4 Technical Review Committee TRC PGE Study Committees and Utility Partners EIM Comparative Study with E3 Advisory Committee EIMSAC Utility/Market Operator Partners Clint KalichAvista Scott KinneyAvista Jared EllsworthIdaho Power Ron SchellbergIdaho Power Casey JohnstonNorthwestern Energy Ray BushNorthwestern Energy Bruce McAllisterPacifiCorp Jim PriceCAISO Michael Milligan National Renewable Energy Laboratory (NREL) Brendan KirbyConsultant to NREL Bart McManusBPA John Ollis Northwest Power and Conservation Council Ron ShelburgIdaho Power Company Ted BrekkenOregon State University Eduardo Cotilla- Sanchez Oregon State University Modeling Team John CriderOPUC Cameron YourkowskiRenewables Northwest Bob JenksCUB Scott DowneyPeak Reliability Michael GogginAmerican Wind Energy Assoc. Maury Galbraith Western Interstate Electric Board Mark RothlederCalifornia ISO Carl MonroeSouthwest Power Pool Scott KinneyAvista Corp. Jim ShetlerBANC Rachel DibbleBPA Tess ParkIdaho Power Company Joe LawlorPG&E Steve BeuningXcel Energy

Slide 5 Footprint Comparison of Generation Resource Capacity

Slide 6 Summary of Results  PGE would see modest positive annual savings from joining either the Western EIM or a NW SCED.*  Savings in either footprint are larger either in the presence of higher gas prices, larger renewable resource buildout, or reserve pooling.  Both the Western EIM and NW SCED would provide reliability benefits for PGE.  Given that the Western EIM does not change planning reserve requirements, PGE does not anticipate that participating in an EIM will defer the need for new generation. * Western EIM also referred to as CAISO EIM in PGE’s studies. NW SCED also referred to as NWPP MC SCED. ** Ongoing market costs represent annual market administrative charges. MarketDispatch Savings RangeOngoing Market Costs**Start-Up Costs Western EIM$ MM$ MM$0.645 MM NW SCED$ MM PGE estimates that these charges would be greater than Western EIM equivalent costs.

Slide 7 Overview of Quantitative Analysis Western EIM participants* Business As Usual (BAU) Case NW SCED participants Business As Usual (BAU) Case CAISO Avista Corporation (AVA) PacifiCorp East (PACE) British Columbia Hydro (BCH) PacifiCorp West (PACW) Bonneville Power Administration (BPA) NV Energy (NVE) Idaho Power (IPC) Puget Sound Energy (PSE) Grant County PUD & Douglas County PUD & Chelan County PUC (collectively, MIDC) Northwest Energy (NWMT) Sacramento Municipal Utilities District (SMUD) Seattle City Light (SCL) Tacoma Power (TPWR) Western Area Power Administration – Upper Great Plains West Region (WAUW)  Study Goal: Quantify benefits to PGE of joining either the Western EIM or a NW SCED.  Compare savings to PGE of two markets with same features but different footprints. *After the start of this study, Arizona Public Service (APS) also announced plans to begin participation in the Western EIM in Since PGE’s study was already in progress, APS was excluded from PGE’s study.

Slide 8 Key Base and Sensitivity Scenario Assumptions Base ScenarioSensitivity Scenario Gas price $3.5/MMBtu average for PGE generators *Based on Wood MacKenzie Q forecast High Gas Price Scenario: $4.6/MMBtu average for PGE generators Renewable Resource Buildout 33% RPS for CAISO 20% RPS for PGE 15% RPS avg for NW *Based on TEPPC 2020, with updates for CAISO & PGE High RPS Scenario: 40% RPS for CAISO 25% RPS for PGE 20% RPS avg for NW *2024 RPS target for California & 2025 target for PGE Real-time transmission capability 200 MW PACE->PACW real-time transfer capability for CAISO EIM *reflects historical level of dynamic capability through IPC Alternative Transmission Transfer Scenario: 400 MW PACE->PACW real-time transfer capability for CAISO EIM *reflected updated exchange agreement with IPC

Slide 9 Results by Scenario Base Scenario with Reserve Pooling Alternative Transmission Transfer (for CAISO EIM) $2.7 $4.6 $5.8 $6.4 $3.0 $6.1 $7.2 $3.5 $5.3 * Additional incremental savings from reserve pooling vs. base scenario: +$0.8MM for EIM +$0.7MM for NW SCED Western EIM NW SCED * *

Slide 10 Benefits from Reserve Pooling Western Western EIM Base Western EIM (With Reserve Pooling)  Reserve pooling can reduce power costs by “releasing” some flexible reserves for other dispatch uses within the hour.  Average release was 144 MW for Western EIM.*  However, each Balancing Authority must still schedule enough energy/capacity to meet their own load-resource balance requirements on an hourly basis.  PGE’s long-term planning reserve margin is not affected by joining an EIM.  PGE does not anticipate that participating in an EIM will defer the need for new generation. Average Flexible Up Reserves In Western EIM PGE’s Key Takeaways on Reserve Reductions * Equivalent NW SCED value for reduced reserves was 47 MW.

Slide 11 Both the Western EIM and NWPP MC SCED Provide Reliability Benefits for PGE  A larger operating footprint enhances reliability by increasing the ability of the system to respond to variability for two reasons:  Pooling of variable loads and wind generation increases diversity, which reduces overall per- unit variability.*  A larger pool of resources under an EIM footprint could provide more ramping capability and respond to variations and imbalances more quickly.*  While the hydroelectric generation that dominates the NWPP MC SCED footprint is recognized for its flexibility, the total size and generation diversity of the Western EIM footprint offsets this advantage.  PGE continues to work with the NWPP members on initiatives to improve regional reliability.  Regional Flow Forecasting Tool  Resource Monitoring & Deliverability Tool  Area Control Error Diversity Interchange *National Renewable Energy Laboratory. Operating Reserve Reductions from Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection. May, At 25.

Slide 12 Update on EIM Readiness  Implementation Agreement between PGE and CAISO filed with FERC on November 20,  PGE presently anticipates an October 1, 2017 “Go-Live” for participating in the Western EIM.  Although PGE’s resources will be dispatched via the Western EIM, PGE will continue to participate in the NWPP MC Reliability forums.

Slide 13 Market Readiness Initiatives Produce Benefits Prior to EIM  Improved information on plant operations and outages leads to better planning and decision making.  New systems improve functionality and replace over 23 old systems and spreadsheets.  Improved knowledge of thermal and hydro unit cycling and better monitoring should enhance reliability and maintenance practices.  Port Westward II used in multiple ways, including increased intra-hour flexibility and an additional resource for morning and evening ramps.  Reduction in BPA wind integration costs captured in 2016 power costs.  Updating wind integration to 30/15 committed scheduling decreased PGE’s initial 2016 NVPC forecast by approximately $2.9 million.

Slide 14 Generation Plants Improved Cycling Capabilities Automated Generation Control (AGC) Implemented Revenue Quality Metering Generation Excellence and Reliability Monitoring Power Operations Plant Optimization System 15 Minute Scheduling & Wind Integration Upgrades to Wind Forecasting Tools Outage Management Reporting System Market Interfaces Balancing Authority Area Reliability Based Control ACE Diversity Interchange Plant Information (PI) Consolidation Market Participation Co-Chaired NWPP MC Initiative Consolidation of Regional Transmission Planning Organizations EIM Cost Benefit Analysis Participant in CAISO Stakeholder Process Improvements within Functional Areas Projects In-Flight Projects Completed Market Readiness Initiatives Completed and Underway