Status of FTK Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Fabruary 2, 2010 Status & Evolution of FTK (impact on Italian groups) Schedule.

Slides:



Advertisements
Similar presentations
22 settembre 2004A. Annovi1 SVT upgrade status A. Annovi - Assisi, 22 settembre 2004.
Advertisements

Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Track quality - impact on hardware of different strategies Paola FTK meeting Performances on WH and Bs   2.Now we use all the layers.
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
Simulation Tasks  Understanding Tracking  Understanding Hardware 1.Two types of tasks: a.Implementing known functions in ATLAS framework b.Understanding.
FTK poster F. Crescioli Alberto Annovi
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
7/20/04Director's Review - SVT Upgrade1 Silicon Vertex Trigger (SVT) Upgrade J. Adelman, I. Furic, Y.K. Kim, M. Shochet, U.K. Yang (Chicago) T. Liu (Fermilab)
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Alberto AnnoviFTK meeting - September 30, 2004 Ideas for a Fast-Track trigger processor - FTK... an evolution of the CDF Silicon Vertex Trigger (SVT) A.
ATLAS Trigger Development
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
1 FTK AUX Design Review Functionality & Specifications M. Shochet November 11, 2014AUX design review.
SVT workshop October 27, 1998Stefano Belforte - INFN Pisa1 SVT Vertical Slice Test Goals Schedule Hardware to be tested Software  pre-existing  developed.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
Performances of the upgraded SVT The Silicon Vertex Trigger upgrade at CDF J.Adelman 1, A.Annovi 2, M.Aoki 3, A.Bardi 4, F.Bedeschi 4, S.Belforte 5, J.Bellinger.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
FTK high level simulation & the physics case The FTK simulation problem G. Volpi Laboratori Nazionali Frascati, CERN Associate FP07 MC Fellow.
Associative Memory design for the Fast Track processor (FTK) at Atlas I.Sacco (Scuola Superiore Sant’Anna) On behalf Amchip04 project (A. Annovi, M. Beretta,
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
Global Costs based on TP (6-10 y): ~1150 K€ Italy ~1150 K€ USA ~200 K€ Waseda ~300+ extra K€ new institutions Costs for 2013 run ~400 K€ Italy ~500 K€
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
Paola TDAQ FTK STATUS (valid for both Option A & B) Paola Giannetti for the FTK collaboration  Work done for each milestone since the TDAQ.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Status of FTK Paola Giannetti INFN Pisa for the FTK Group ATLAS Italia November 17, 2009.
Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
AMBFTK Report AMBFTK: problems to solve Power distribution: Crates – compatibility with CDF crates? Thermal dissipation: Cooling Signals I/O:
New AMchip features Alberto Annovi INFN Frascati.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
UPDATE ON HARDWARE 1 1.VERTICAL SLICE & COOLING TESTS 1.ONLY a TEST STAND or a SMALL DEMONSTRATOR ?? 2.CRATE.
Outline The Pattern Matching and the Associative Memory (AM)
Firmware development for the AM Board
IAPP - FTK workshop – Pisa march, 2013
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
The Associative Memory – AM = Bingo
FTK Update Approved by TDAQ in april
Project definition and organization milestones & work-plan
Cost &Personnel Estimates Project Organization
Summary of Deliverables & reached Milestones
AM system Status & Racks/crates issues
* Initialization (power-up, run)
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Pending technical issues and plans to address and solve
Update on CSC Endcap Muon Port Card
Overview of the ATLAS Fast Tracker (FTK) (daughter of the very successful CDF SVT) July 24, 2008 M. Shochet.
ATLAS L1Calo Phase2 Upgrade
FTK variable resolution pattern banks
KICK OFF meeting - project presentation
PID meeting Mechanical implementation Electronics architecture
SVT – SuperB Workshop – Frascati Sept. 2010
FTK Fibers Pixel & SCT RODS ATCA
Presentation transcript:

Status of FTK Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Fabruary 2, 2010 Status & Evolution of FTK (impact on Italian groups) Schedule for the procedure: TDAQ first, USG after The collaboration – Hardware sharing FTK Schedule & Global Costs Milestones

Status & Evolution 2  3 x10 34 : 90% DONE see Draft Techinical Proposal performance studies: a good step in the TP– we can still improve - Again: New architecture  After approval split into multiple activities build the system for 3 x10 34 (2016?) ITALY 2 jobs:  Standard: AMboard (Pisa), Pixel clustering mezzanine (Frascati) – 2013?  Challenging: TSP and new AMchip → R&D – ready ? (Pisa-Frascati-Fermilab + someone else?) vertical (start 2012)→ protoFTK studies → insertion new prototypes → before (2015?) (Pisa-Frascati-Pavia-Bologna)

FTK Document Status & Plans =========================== * The document currently being written on FTK system will be called a Technical Proposal (TP) * A final draft of the TP will be available 15 February 2010 * A draft version of the document will be discussed with Italian referees from INFN in the course of February * Chris & David will identify people from TDAQ who would be prepared to review the document in detail. This review could begin informally before the document is finalized in order to gain time. o TDAQ review set up Nikos Konstantinidis, Nick Ellis, Aleandro Nisati, John Baines & Jos Vermeulen * Once this review is completed, the revised document would go to TDAQ for final comment * It is currently anticipated to submit the document to the Upgrade Steering Group (USG) by the middle of March * If the document is approved by the USG and we are encouraged to proceed to a TDR, it is estimated (subject to the scope of the TDR and the machine schedule) that a TDR would be produced 24 months after the approval by the USG of the TP. Schedule proposed by TDAQ to Upgrade Steering Group

Who signs the TP today University of Chicago USA M. Bogdan,A.Boveia, F. Canelli, M. Dunford, J.F. Genat, A. Kapliy, Y.K. Kim, C.Melachrinos, M.Shochet, F. Tang, J. Tuggle Laboratori Nazionali di Frascati A. Annovi, M. Beretta, G. Volpi Harward University M.Franklin, C. Mills, M. Morii University of Illinois USA M. Kasten, A. McCarn, M.S. Neubauer Dipartimento di Fisica e Istituto Nazionale Fisica Nucleare Pisa E. Bossini, F. Crescioli, M. Dell’Orso, P. Giannetti, M. Piendibene, C. Roda Argonne National Lab USA G. Drake, J. Proudfoot, J. Zhang Waseda University Japan Naoki Kimura, K. Yorita → → → → → → → Fermilab National Lab USA J. Hoff, T. Liu, B. Penning, M. Verzocchi, J.Y. Wu Dipartimento di Fisica e Istituto Nazionale Fisica Nucleare Pavia A. Negri, V. Vercesi. → Dipartimento di Fisica e Istituto Nazionale Fisica Nucleare Bologna F. Giorgi, M. Villa, A. Zoccoli.

FTK: Projects to Institutions 4 DF crates: cluster finding split by layer 8 “core” crates: AMboard Data Organizer GigaFitter S-links Raw data ROBs Track data ROB Track data ROB Pisa & Frascati & Fermilab the AMChip could be 3D Frascati-Waseda: Clustering in Pixels-SCT mezznines Pixels & SCT RODs Chicago GigaFitter + Data Organizer + HW Pisa: AMBoard Illinois: Final board in core crate USA-Italy “2-outHola” Fermilab: DF motherboards USA+Italy: crates + links + backplanes… 1 Readout Crate Argonne

LAMB Standard cell chip 40 MHz clock FPGA for Roads AMBoard P3 serial LVDS Control FPGA for SS Input AM0+TSP+DO+TF+HW CPU vme AM1+TSP+DO+TF +HW AM2+TSP+DO+TF +HW AM3+TSP+DO+TF +HW AM4+TSP+DO+TF +HW AM5+TSP+DO+TF +HW AM6+TSP+DO+TF +HW AM7+TSP+DO+TF +HW 11LayFit+HW AM10+….. AM11+….. AM12+….. AM13+…… AM14+….. AM8+….. AM9+…... 11LayFit+ HW final AM15+….. 11LayFit+ HW final 11LayFit+HW OPTION A AUX card Connectors for Hits LVDS Cables DO+TF+HW HWTF DO INPUT FIFOs HWTF DO HWTF DO HWTFDO Connectors for tracks output Interface SSMAP Processor Unit Pisa +Chicago ITALIAN DUTIES for 3x10**34 PISA DATA FORMATTER FRASCATI FERMILAB

THE CHALLENGING PART: THE NEW AMCHIP AND THE TSP TSP in the AUX card? Could be enough +TSP? LAMB Standard cell chip 40 MHz clock TSP In the AMBoard? Easy but expensive FPGA +TSP? In the LAMB? NOT Easy but LESS expensive AMchip TSP? Memories? In the 3D CHIP? Very challenging Very powerfull R&D NEEDED Waiting 14 Tev

Data Chamonix Shutdown Vertical Atlas + later FTK prototype on barrel Z→ bbar Z→   s   With proto-FTK Not before 2016 we will need New AMchip and TSP. At least 5 year R&D 3x10**34: Production COSTS (INCREASED) & SCHEDULE (LONGER) 1

3 x 10**34: INCREASED PROD COSTS BUT LONGER SCHEDULE 2  FRASCATI - mezzanine PRODUCTION : 250 K€ (Last July 250)  PISA - PRODUCTION AMBOARD + LAMB with TSP in AMBOARD K€ (last July 420 K€ but TSP was not included) However: 1.Phase 1 Peak luminosity recently decreased to 2,5 x10**34 2.TSP probably not necessary with optimization (14 Tev events needed) 3.IF needed it will be very far from now……at least 6 years from now ! 4.Not necessarily will be in the AMBoard……. (most expensive option) 5.Technology advancement and R&D → reduction of costs 6.We can look for extra collaborators for the TSP 7.LET’s concentrate on the cost without new AMChip and TSP  Pisa board production is back to 420 K€ ( chips+IVA) as calculated in July if no TSP.  AMchip: R&D 90 nm 3-D: first prototype 40 k€ For a planar chip: MPW 1 cm^2 : ~100 k € if 90 nm is old enough (2015) Masks whole wafer: ~200 k € (if enough old) (end 2015) Pilot run: ~30 k$ per 3k chips (we need 16k, ~50 k€, if 90 nm old!) TOT planar: 350 +IVA= 420 k€ → AND 3D??

SUMMARY GLOBAL COSTS: PRODUCTION ITALY: = 1090 k€ (like in july talk +IVA) + Prototype Development – proto-FTK – commissioning – software – services – R&D for TSP & AMchip 3D + extra TSP undefined costs STARTING 2015 BOARDSAMchip

: vertical AMboard + EDRO + 2-D clustering 2012: vertical – insertion in TDAQ using fake hits substitute some HOLAs with double output HOLAs proto-FTK: 4 Processing Unit/region (80 k€ +110 k€ + CDF LAMBs) install as much as possible new HOLAs 2013:use proto-FTK for b-tagging, tau-tagging and B Physics triggers make a decision for TSP (end R&D)→ start final developments MILESTONEs COST PROFILE IN THE NEXT YEARS for ITALY 2011: ½ production of HOLAs and fibers ~80 K€ (could September) ½ 3D R&D chip ~20 K€ prototypes & R&D TSP ~40 K€ 2012: first AMboard bunch ~ K€ services ~ 20 K€ ~50 K€ in 2010, ~140 K€ in 2011 and ~210 K€ 2012 HARD to predict more without knowing AMchip & TSP R&D results & future LHC schedule. However ~500 K€ in ~ could allow to build the 10**34 system – except TSP and AMchip

AMCHIP We are working (L.Sartori, Pisa+ M.Beretta, E. Bossini, Frascati) at the 2010 mini-asic prototype provided of full custom cell (M. Beretta Frascati) with 2 main goals: 1.Area reduction to obtain higher pattern densities 2.Power consumption reduction to be able to use large silicon areas Pattern Density/power with respect the CDF chip: 90 nm against 180 nm → factor ~4 for area and power consumption reduction (V 90 /V 180 )**2 Full custom cell: a factor 2 gain for both area and consumption. Future collaboration with Fermilab to stack 2 or 4 tiers with 3D technology

Conclusions Things run really fast TDAQ suggestions, than TP to USG in march We need Atlas Italia & INFN referee feedback before march (as soon as possible).

Backup 14