26 January 2005Team Safety Lock Mailbox1 Team Safety Lock Mailbox ME 4182 - Week 3 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.

Slides:



Advertisements
Similar presentations
Tarun Kumar Singhal. EPU responsible for: – Egg Protection Unit – Main objective of Cansat Design is to provide egg safety from launch to landing – We.
Advertisements

Criteria for Formatting of the Project Report
Spaghetti Earthquake Structure  Working as a team, your goal is to design and construct a structure made of spaghetti, marshmallows, and tape.  This.
Preventing Mail Theft Presented by American Crime Prevention Institute.
CONSUMER BANKING SYSTEM. PURPOSE STATEMENT  The purpose of our project is to provide fast and safe analysis of sales data of banks by the state bank.
SIMS 213: User Interface Design & Development Marti Hearst Thurs, Jan 22, 2004.
MANUFACTURING PROTOTYPE How do all the aspects of manufacturing come together to make a final product?
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Team Gun Show Final Presentation December 1, 2004 Group Members: Nate Griggs Clay Hamlin Marc Manning Jon Megahy Van Vo Joel Williamson.
Design for Manufacturing Team: Constraints:  Main construction material should be wood  Other materials such as metal, fabric, or plastic may be used.
Instant Design Challenge
Instant Design Challenge Using the Design Process and Engineering Notebook.
MULTIMEDIA DEVELOPMENT
Cequent Group “The Development Of A Tie Down Ratchet Group 2 Stephen Smith Otto Gerdeman Adam Schmitz.
Introduction to Interactive Media The Interactive Media Development Process.
9 February 2005ME 4182; Safety Lock Mailbox1 A-Team Safety Lock Mailbox Week 5 – Products and Patents Carlos Alzate Brian Dorton Song Park Varun Sharma.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
This semester you will use an engineer’s notebook to document the process that you will use to design a product. Your notebook will be organized and formatted.
ADVANCED DESIGN APPLICATIONS UNIT 4 - MANUFACTURING © 2015 International Technology and Engineering Educators Association, Learning Cycle Three – Looping.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
27 April 2005Safety Lock Mailbox1 Safety Lock Mailbox ME Final Presentation Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Inventions M&M Candy Dispenser/Package Case Study Northern Highlands Regional High School Student’s Name Design/ Build Team Member’s Names Name of Design/Build.
What security is about in general? Security is about protection of assets –D. Gollmann, Computer Security, Wiley Prevention –take measures that prevent.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
Problem Statement Wasted time and effort in retrieving pucks after shooting them into the hockey net. Other sports like basketball have retrieval systems.
SMJ 3513 © Dr. MKAJ 1 Lecture 3 Design Process & Design Methods.
Fall 2015CISC/CMPE320 - Prof. McLeod1 CISC/CMPE320 Assignment 1 due today, 7pm. RAD due next Friday in your Wiki. Presentations week 6. Today: –Continue.
Fall 2015CISC/CMPE320 - Prof. McLeod1 CISC/CMPE320 Lecture Videos will no longer be posted. Assignment 3 is due Sunday, the 8 th, 7pm. Today: –System Design,
Personal Product Production Drawing. DESIGN ANALYSIS A "Design Analysis" is the document prepared by an engineering team that includes all of the information.
Overview Participants manufacture a marketable desktop organizer. The team submits a documentation portfolio of the activities and the product made during.
Oct 211 The next two weeks Oct 21 & 23: Lectures on user interface evaluation Oct 28: Lecture by Dr. Maurice Masliah No office hours (out of town) Oct.
Lecture 2. An Overview of Engineering Design JANUARY 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
ENGR-TS-2: The students will develop an understanding of how the design process is used to develop a technological system. a. Identify the steps of the.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
6 Modeling, Testing, and Final Outputs Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
SAFE JACK. What is the problem? The standard jack consists of a hydraulic system that does not employ any type of safety support in case of accidental.
ME 4182 Problem Statement, Design Partition, Project Plan, Task Assignments Team: GT Rack 2:00 pm September 7, 2005 Ryan Glenn Andrew Mrasek Japheth Nelson.
FUNCTIONUSERMANUFACTURINGMARKETINGENVIRONMENTALMATERIALS MUST Aid the stability of the kayak both when moving and when stationary. Prevent roll from movement.
Research Assessment Task
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
16 February 2005ME Safe Lock Mailbox1 A-Team Safety Lock Mailbox ME Week 6 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam.
30 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team Week 11: Prototype Production Carlos Alzate Brian Dorton Song Park Varun Sharma Jack.
The Engineering Design Process
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
Year 8 Clock Project Design & Technology Design Brief You are to design & make a 3D clock that is aesthetically pleasing and could be sold to a specific.
2 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team: Week 8 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
An Overview of Engineering Design
Design and modeling 10 step design process
Application Software Chapter 6.
Ten-Stage Design Process
GCSE Graphic Products Revision 2008 Examination.
Project Overview Introduction to Factory Automation Numerical Control
Ten-Stage Design Process
Engineering Design Process
Kimberly Gonzalez United Engineering & Technology Magnet
University of Idaho – Interdisciplinary Engineering Capstone Design
An Overview of Engineering Design
Bonneville Power Administration Aerial Line Cart Progress Report
Instant Design Challenge
Instant Design Challenge
P11017 Tactile Navigation Interface
An Overview of Engineering Design
Engineering Design Process
University of Idaho – Interdisciplinary Engineering Capstone Design
Evan Harshbarger, Tommy Ma, Dylan Wentzel, Chuzhen Wang
Presentation transcript:

26 January 2005Team Safety Lock Mailbox1 Team Safety Lock Mailbox ME Week 3 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski

26 January 2005Team Safety Lock Mailbox2 Problem Statement Scope of the Problem –Threat of personal information stolen –Identity theft via bills, documents, and packages Customer Needs –Secure box to prevent theft and vandalism –Storage space large enough for small deliverable packages –Aesthetic appearance matching neighborhood codes

26 January 2005Team Safety Lock Mailbox3 Problem Statement (cont.) Constraints and Specifications –The safety mailbox will have to be strong enough to withstand vandalism –Mail not accessible when door is closed –The dimensions will have to meet standard mailbox and post sizes –The opening contraption must be secure from tampering –The retrieval box will have to be pleasing to the eye and meet any local laws/codes

26 January 2005Team Safety Lock Mailbox4 Problem Statement (cont.) Market –Rural homes –Subdivisions –Businesses Evaluation Criteria –How easy is the mailbox to break in to? –How aesthetic is the design? –How reliable are the opening and locking devices?

26 January 2005Team Safety Lock Mailbox5 Problem Statement (cont.) Goals for this Project –To produce a useful and reliable product –To learn about the design and manufacturing process –Learn team cooperation and planning skills –Have Fun

Design Partition Subsystems allow for: Improved time management of the design process A more robust design of the final prototype

26 January 2005Team Safety Lock Mailbox7 Subsystems Delivery Receptacle Safety Receptacle Transfer Mechanism Mechanical Linkage

26 January 2005Team Safety Lock Mailbox8 Delivery Receptacle Retains design of traditional style mailbox –Capacity –Shape –Accessibility –Identifiers (i.e. street numbers, red flag, etc.) Improved protection against vandalism and weather Requires ability to handle outgoing mail

26 January 2005Team Safety Lock Mailbox9 Safety Receptacle Provides a high level of protection against breaking and entering Unobtrusive to the overall traditional appearance Allow easy access by means of a locking mechanism Requires same capacity as Delivery Receptacle

26 January 2005Team Safety Lock Mailbox10 Transfer Mechanism Effectively transfers all types of mail from delivery receptacle to safety receptacle Must be robust by design for smooth and repeated operation Eliminate all possible mishaps of jamming Able to withstand any possible attempt of break-in

26 January 2005Team Safety Lock Mailbox11 Mechanical Linkage Allows the delivery receptacle door to effectively operate the transfer mechanism Designed for repeated and effective use Aides in preventing possible break-in through delivery receptacle

26 January 2005Team Safety Lock Mailbox12 Project Plan

26 January 2005Team Safety Lock Mailbox13 Team Member Tasks Carlos Alzate –Design Sketches –CAD Drawings Brian Dorton –Prototype Organization and Building –Materials Selection and Purchasing –Final Poster Song Park –Engineering Analysis –Design Selection

26 January 2005Team Safety Lock Mailbox14 Team Member Tasks (cont.) Varun Sharma –Collecting Deliverables –Final Paper –Treasurer Jack Vasko –Website –Pictures and Videos Adam Zurawski –Organize Meetings –Weekly Presentations –Final Presentation

26 January 2005Team Safety Lock Mailbox15 Team Member Tasks (cont.) All –Final Deliverable Checklist –Final Group Evaluations

26 January 2005Team Safety Lock Mailbox16 Questions?