 Fabrication of two trial vessels similar in shape & size as being considered for 650 MHz cavity is in progress at a Chennai based company.  A small.

Slides:



Advertisements
Similar presentations
WELDING FAMILIARIZATION
Advertisements

Why Is There Weld Testing? ASM – AWS (NTX) Joint Meeting Michael S. Beaton, PE 17 February, 2011.
Codes & Standards.
Manufacture and Testing of a Large Zirconium Clad Vessel David Clift, P.Eng. Production Manager Ellett Industries September 14, 2005.
American Welding Society Nashville Section
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
Vacuum Vessel Production Readiness Review
LHC CRAB CAVITY He Tank DQW Prototype P.Freijedo-Menendez C.Zanoni L.Giordanino R.Leuxe.
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
Cooling connections in the service gap Richard French The University of Sheffield.
Power Plant Construction and QA/QC Chapter 6 – Welding, Procedure and Operator Qualification Engineering Technology Division.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Welding joints.
AVC COLLEGE OF ENGINEERING MANNAMPANDAL MAYILADUTHURAI REVIEW 2 3 September
PRESENTED BY ILAMVAZHUTHI.C 1 Under the guidance of Mr.S.CHOKALINGAM M.E (Assistant professor) DEPARTMENT OF MECHANICAL ENGINEERING E.G.S.PILLAY ENGINEERING.
A – TIG ACTIVATOR.
DEFECTS OBSERVED IN RADIOGRAPHIC TESTING
Rolling Manufacturing By Daniel Troutman. What is Rolling Manufacturing? Rolling Manufacturing is metal forming process in which metal is passed through.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
FNAL Visit to Century Metal Spinning Current P.O. for: 2 - Titanium Helium Vessel Tubes (20” I.D. x 3/16” Wall x 14.5” Long) MHz β=0.9 Nb Beam Tubes.
1.3GHz Input Coupler for ILC
ORBITAL WELDING AN EXPERIENCE AT KKNPP.
Shielded metal arc welding process Fig : Schematic illustration of the shielded metal-arc welding process. About 50% of all large-scale industrial welding.
Submerged arc-welding (SAW)
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
56 MHz SRF Cavity and Helium vessel Design
"Welder Certification" What it is-What it isn’t The purpose of this presentation is to introduce you to the various aspects of welder certification. This.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Manoj Kumar, B. N. Duttagupta, Rajvir Singh Doohan, S. K. Joshi, A. K. Sagar, L. Chowdhary, Rekhya Naika, Prabhat Kumar Gupta, Vivek Nema, Hemant Kumar.
HELIUM LEAK TEST OF INNER BORE WELDS OF TUBE#TUBESHEET JOINT
"Welder Certification" Weldertraining.org The purpose of this presentation is to introduce you to the various aspects of welder certification. This is.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
WELDING PROCEDURES and WELDERS QUALIFICATION
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.
Unit 215 – Welding by TIG Process
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
WELDING QUALIFICATION
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Fabrication of Boilers and Pressure Vessels
Stainless steel piping's presentation
TIG welding By Mr. A Nirala Galgotias University.
HYBRID ARC LASER WELDING
Ed Daly for W. Robby Hicks
HFM Test Station Main Cryostat
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
Date of download: 10/31/2017 Copyright © ASME. All rights reserved.
CTF3 – TL 2 VACUUM CHAMBER FABRICATION STATUS REPORT Jan 22, 2008
Date of download: 11/14/2017 Copyright © ASME. All rights reserved.
Solutions for Nuclear Power Industry
Cavity + He Vessel interface
Gas Tungsten Arc Welding (GTAW) (TIG)
Design of Distribution Feedbox at LHC P7
Enlargements and area Scale factor Area of object Area of image.
API STANDARD 1104 Welding of Pipelines and Related Facilities
IHEP Cryomodule Status

SNS PPU Helium Vessel Design and Assembly
SNS PPU Helium Vessel Design and Assembly
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

 Fabrication of two trial vessels similar in shape & size as being considered for 650 MHz cavity is in progress at a Chennai based company.  A small diameter vessel has been fabricated in-house. Work on 650 MHz Helium Vessel Raja Ramanna Centre for Advanced Technology 21 Mar 2012

Plates: Titanium, Gr-2 as per ASTM B 265. Filler Metal: AWS A 5.16 ER Ti Gr-2 PQR, WPS and WPQ have been prepared as per ASME B&PV Code, Section IX. TIG welding being done without glove box with purging and trailing shield.

Shell welding at TITAN Preparation for Welding (purging and trail shielding arrangement) Welding in progress

Shell welding at TITAN (contd.) Welding of nozzleShell welding (Enlarged view)

Visual inspection Root PassFinal Pass

A 325 mm dia., 400 mm long cylindrical vessel has been fabricated with 6 mm thick Titanium Gr-2 plates. TIG welding is done in atmosphere (without glove box) using trailing shield and purging fixtures. Weld joints have been leak tested using Helium MSLD at sensitivity of 1 x mbar-liter per second and no leak was observed.

Thanks