Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Safeguarding Investments In Gas Infrastructure Informal lecture Agency for the Cooperation of Energy Regulators, ACER - By Tim Boersma.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Nina Grall DG TREN – Directorat C GRI SSE-EFET WS, 21/01/2008, Prague Concepts for the EU Gas Market Requirements and framework EUROPEAN COMMISSION.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments Transmission Workgroup 6th October 2011.
Erik Sleutjes (Ofgem) GRI NW Government Meeting The Hague, 6 May 2010 Pilot framework guideline on gas balancing – ERGEG initial steps.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
TITRE 2 nd Ad Hoc Expert Group Meeting 16/02/2012 Framework Guidelines on Interoperability Rules: Problem Identification & Options.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
23 September 2004GTE Annual Conference1 Review of the Madrid Forum VIII July 2004 Geert E.H. Joosten GTE President GTE Annual Conference September.
19-20 October 2010 IT Directors’ Group meeting 1 Item 6 of the agenda ISA programme Pascal JACQUES Unit B2 - Methodology/Research Local Informatics Security.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
FG Transmission Tariff TITRE 4 February 2014 Interoperability and Data Exchange Rules for European Gas Transmission Networks Geert Van Hauwermeiren, CREG.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
10 year investment plan ERGEG approach and contribution
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
Transmission Planning Code – Draft Document
Background and Process
ERGEG GRI South South East – , Maribor
Achieving the Internal Gas Market The view of gas suppliers
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Update on European Network Codes
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Steven Gordon ACER Gas Department
Gas balancing – where next
Gas Quality & TSO – LSO Coordination
EUROPEAN TRANSPARENCY UPDATE
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
LNG Workshop Bilbao, March 13th 2009 GLE.
Update on WS3 Activities
Presentation transcript:

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011

2 FG on Interoperability Rules – update. A scoping document was prepared in the course of this summer;. A workshop with stakeholders was held on 13 September 2011 in Ljubljana;. Invitation by EC to start drafting the FG is expected this October.

3 Objective of FG on Interoperability Rules. Smooth cooperation among system operators and between system operators and system users, agreeing on technical parameters, writing down operational procedures and agreeing on the protocol on how to inform each other.. The procedures of the operational and technical domain can strongly influence the development of markets.. To ensure and maintain system integrity and the continuity of supply, system operators do not only have to invest in infrastructure, but also have to focus on operational and interconnection agreements.

4 Definition of the term “Interoperability”. Technical definition : “Interoperability refers to the ability of diverse transmission systems to work together (inter- operate) in a technical system operational sense in order to facilitate the exchange of gas across networks, taking into account organisational factors that impact system to system performance and realising simple and reliable exchange of information between system operators as well as between system operators and system users.. Definition from users’ perspective: One overall aim of interoperability is to ensure that users of transmission systems in Europe do not face any additional technical, commercial or operational barriers compared with if the relevant networks were efficiently operated by a single entity.”

5 Application of the Framework Guidelines The application shall cover :. interconnection points between adjacent entry/exit systems (so not only on cross- border points);. all other entry and exit points of those entry/exit systems (e.g. linked to storage, LNG, production facilities and end-consumers including these exit points which are connected to distribution systems) where gas can enter or exit the system.”

6 Issues to be addressed in the Framework Guidelines. Nomination Process. Gas-day. Re-nomination regime. Operational constraints. Interconnection Agreements (matching, rules for flow control, measurement principles of gas quantities and quality, rules for allocating measured gas quantities,..). Units harmonisation. Gas quality. Data exchange. Capacity calculation

7 Interaction with other FGs Other areas, from Article 8(6) of Regulation (EC) No 715/2009, may also be considered for inclusion in the scope of the Framework Guidelines on Interoperability Rules for the European Gas Transmission Networks in order to use resources more efficiently:. network security and reliability rules;. network connection rules;. third-party access rules;. data exchange and settlement rules; and. operational procedures in an emergency.

8 Thank you for your attention