E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 1 E18 MOTORWAY MUURLA – LOHJA ENVIRONMENTAL PLAN FOR BUILDING E18 MUURLA – LOHJA PPP-PLAN Jari Mannila Leading.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

Leave No Trace. Leave No Trace Principles 1. Plan ahead and prepare. 2. Travel and camp on durable surfaces. 3. Dispose of waste properly. 4. Leave what.
Erosion. What is it?  Movement of soil materials by the action of water, wind or gravity.
Lesson 24: Where Shall We Build?
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
WATER CONSERVATION PRINCIPLES AND PRACTICES. Water conservation “ The conservation treatment meant to reduce or prevent sheet erosion while achieving.
Organ Pipes National Park Allanah Garnett. Contents Page Location Map 1 Location Map 2 Creation 2B Organ Pipes Rosette Rock Ecology Habitats Tessellated.
Lakeshore Development Guidelines A Primer Charlie Lake Conservation Society September 2007.
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
3 May 2013 Presented By: Joanna Oborne Councils Powers and Obligations with respect to Driveways.
TOPOGRAPHIC MAP.
Project Scope Hire Consulting Firm to perform following:
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
John Miller.  Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦
Flooding in Boscastle 16th August Map of Boscastle. Aerial Photo. MUST: Annotate images and diagrams to show the causes and effects of the Boscastle.
 Soil is one of Earth´s most valuable natural resources because everything that lives on land, including humans, depends directly or indirectly on soil.
Information from
Agricultural Best Management Practices For Protecting Water Quality Recommended by Georgia Soil and Water Conservation Commission and approved by the EPD.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Department of Civil Engineering,
Leave No Trace Sarah Burger Kaibab Band of Paiute Indians October 23, 2009.
Leave No Trace Peter and Matt. Plan ahead and prepare – Know the regulations and special concerns for the area you'll visit. – Prepare for extreme weather,
Section 3: Mining Regulations and Mine Reclamation
Ecological Planning of State Owned forest in Finland Forestry seminar August 28, 2003 Petri Heinonen.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
1 Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment Content 1.Summary.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
Chapter C Cross Section (ANSWERS )
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Waves and wind batter the coast. In some places the waves erode the land along the coast. This high cliff has rocks that have tumbled down.
8/30/05The Ministry of Environment of the Republic of Lithuania1 Agri-Environmental measures Agri-Environmental measures Jolita Ruzgienė Nature Protection.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
CE2255 HIGHWAY ENGINEERING HANDLE BY L.MANON MANI
Nonfarm Erosion Control
Erosion project How does erosion effect Dinosaur Park Exposed tree roots Crevices Small cliffs Trash.
Pp.kk.2003 / tekijän puumerkkiKalvosarjan nimi 1 Functionality analysis of Isokylä highway tunnel automatic incident detection system (AID) Sauli Pahlman.
Update of the progress under the CAP- delegated acts, implementing rules, RDPs Claudia OLAZABAL Head of Unit Unit Agriculture, Forest and Soil DG ENV –
Camp Management and SPHERE Standards Module 4 Session 4.2 National Disaster Management Practitioners, Islamabad, Pakistan.
Compensation Integrated into Infrastructure Planning and EIA in Finland Case: Europe E18 Motorway Turku-Vaalimaa Tiina Kähö Finnish Consulting Engineers.
Soil Conservation.
EROSION CONTROL BY LAND MANAGMENT WHAT IS EROSION The detachment and transportation of soil particles from one place to other by running water, wind.
IRRIGATION SYSTEM AND CHANNEL MAINTENANCE IN EGYPT Central Directorate for Channel Maintenance Ministry of Water Resources and Irrigation Arab Republic.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
April 12, Purpose and Intent Encourage development that enhances the environmental and aesthetic conditions that contribute to the quality of life.
What is the Neighborhood and Community Sustainability Grant? Encourage residents to work collaboratively and creatively. Maximum $2500 per year. A competitive.
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
Climate Change Transport Engineering Challenges: new rules towards new paradigm.
General Road Construction Information
Jefferson County SA Red Rocks Site Approval
Approach Road Inspection and Rating
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
Continuing Authorities Program
Unit 4: Environmental Science
THE CHISHOLM TRAIL A PRESENTATION T0 PROVIDE AN UPDATE ON THE LANDSCAPE STRATEGY FOR THE PROJECT PAGE 1.
Construction Management & Inspection
Soil Conservation.
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF HIGHWAY PROJECTS
Soil Conservation to save soil..
Groundwater area protection plans in water management
THE NATURAL ENVIRONMENT
Landforms Social Studies: Unit 1.
Latin America and Caribbean Region
Soil Conservation Conservation - to save.
Planning Commission January 20, 2016
Unified Development Code
Presentation transcript:

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 1 E18 MOTORWAY MUURLA – LOHJA ENVIRONMENTAL PLAN FOR BUILDING E18 MUURLA – LOHJA PPP-PLAN Jari Mannila Leading consultant EIA and environmental planning Ramboll Finland Ltd.

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 2 Building of E18 Turku - Helsinki Section Muurla – Lohja crosses a lake district with great natural values

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 3 PPP – in environmental planning Private financing meant that Minimum standard objectives had to be defined Road architecture and mitigation of negative impacts Different possibilities to reach the objectives were defined

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 4 Image of the road – architectural pricipals The landscape is rocky and varied Image of wilderness: partly rock and stone environment New covering principles for embankments and slopes Erosion proof (gravel) Natural reforestation Side ditch slopes on grass Embankment effects Mainly gravel Group of trees as softening effect Group of massive stones as focus

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 5 Gravel embankments

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 6 Structures Structures noise reduction (land walls 36 km, fences 4,5 km, balustrades 12 km) noise reduction (land walls 36 km, fences 4,5 km, balustrades 12 km) bridges bridges large waterway bridges (3) large waterway bridges (3) important land bridges (4) important land bridges (4) tunnel mouths (14) tunnel mouths (14) Interchanges (8) Interchanges (8) Greenery in road environment Greenery in road environment Landfills Landfills Hauklampi highway rest stop Hauklampi highway rest stop Flying squirrels´ crossings and other special objects Flying squirrels´ crossings and other special objects Construction plan for road environment included:

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 7 Tunnels Planning the tunnel mouths Excavation plans (tunnel techniques) Finishing touch adjusted to excavation results (tunnel techniques and environmental planning) A lot of teletechniques was installed Drainage of tunnels Gathering the washing water Grass refineries to purify water

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 8 Eastern end of Lakiamäki tunnel

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 9 Tunnel mouths

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 10 Noise reduction Noise reduction structures Natural, steep embankments towards the road Noise balustrades on road edges Noise fences Transparent balustrades on long bridges

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 11 fence h 3-4 m Partly transparent fence in Karnainen transparent fence on bridges Noise reduction structures

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 12

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 13

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 14 Flying squirrel strategy 1. Species is in EU´s natural directive appendix 4A 2. Finland has a special obligation to preserve the species nesting areas found 4. 6 nesting areas needed an exceptional permit to be destroyed 5. Permits provided crossing places for flying squirrel

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 15 Flying squirrel strategy Biologists defined the crossing places, a minimum distance between trees should not exceed 50 m Crossing places provided that preserved trees needed to be marked before construction All builders working in the areas had specific instructions to preserve the marked trees The risks of building procedures were evaluated in advance Significant inconveniences in building Risks on damaging the trees Regular reports for environmental authorities and negotiations in solving conceivable problems

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 16 Possible animal (and flying squirrel) crossings Tunnels and their mouths Large land bridges (5), trees helping the underpass Special animal crossing bridge Preserving trees on road embankments High plantation in median strip Preserving nesting places outside road area

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 17 Helping flying squirrels to cross the road: existing trees left in noise walls and complementary plantations

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 18 High plantation on median strip

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 19 Long valley bridge

E18 MUURLA-LOHJA PROJECT ROAD ENVIRONMENT 20 Special animal crossing bridge in Lohja