WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.

Slides:



Advertisements
Similar presentations
Wir schaffen Wissen – heute für morgen 8. Januar 2014PSI,8. Januar 2014PSI, Paul Scherrer Institut Status of CAVITY BPM RFFE & ADC June 24, 2010 Markus.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Lorentz force detuning measurements on the CEA cavity
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
January 28th, 2010Clermont Ferrand, Paul Scherrer Institut DRS Chip Developments Stefan Ritt.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
EET 2351 Lecture 2 Professor: Dr. Miguel Alonso Jr.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Wir schaffen Wissen – heute für morgen June 11, 2015PSI,June 11, 2015PSI, Paul Scherrer Institut Modular High Bandwidth Data Acquisition System With Gigabit.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
RF SYSTEM DESIGN FOR THE TOP-IMPLART ACCELERATOR V. Surrenti, G. Bazzano, P. Nenzi, L. Picardi,C. Ronsivalle, ENEA,Frascati, Italy ; F. Ambrosini, La Sapienza.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Wir schaffen Wissen – heute für morgen 9. September 2015PSI,9. September 2015PSI, Paul Scherrer Institut Basic powersupply control – Digital implementation.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
The World Leader in High-Performance Signal Processing Solutions Design a Clock Distribution for a WCDMA Transceiver System CSNDSP 2006 Session: B.11 Systems.
LLRF Cavity Simulation for SPL
1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.
Design studies of a low power serial data link for a possible upgrade of the CMS pixel detector Beat Meier, Paul Scherrer Institut PSI TWEPP 2008.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
RF Cavity Simulation for SPL
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
1 A High-Speed and Wide Detectable Frequency Range Phase Detector for DLLs Babazadeh, H.; Esmaili, A.; Hadidi, K.; NORCHIP, 2009 Digital Object Identifier:
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
THE DIGITAL REVOLUTION. Wir schaffen Wissen – heute für morgen 15. Apr. 2013PSI, Paul Scherrer Institut The fully digital PSI accelerator control room.
Other Utilities of ALBA LLRF
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Timo Korhonen Improvements to Indexing Tool (Channel Archiver) ‏ EPICS Meeting, BNL 2010.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
Wir schaffen Wissen – heute für morgen Automation in LLRF System Zheqiao Geng Paul Scherrer Institut (PSI), Switzerland For LLRF15 Workshop, Shanghai,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps Towards Beam Commissioning: Timing & Synchronization Group Stephan Hunziker for the Timing & Synchronization.
Design Approaches for the X band LLRF Systems Uros Mavric, XB-10, 2 nd of December 2010, Cockcroft Institute, UK
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Design of a direct conversion 200 MHz non-IQ scheme using the Dimtel LLRF4 card Bob Anderson.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Hugo Furtado CERN - Microelectronics Group 11th Workshop on Electronics for LHC and future Experiments Delay25, an ASIC for timing adjustment in LHC Delay25.
Areal RF Station A. Vardanyan
RF Synchronization Activity
Steps Towards Beam Commissioning: BPM System
Improved radio data analysis with LOPES Katrin Link, for the LOPES Collaboration #0404, ICRC 2011, Beijing.
M. Calvi & Th. Schmidt :: Insertion Device :: Paul Scherrer Institut
RF Synchronisation Issues
Steps towards beam commissioning: Magnet power supplies
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
RF Pulse Shaping.
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
umbrellaID: OpenIRIS & Umbrella
Breakout Session SC3 – Undulator
Presentation transcript:

WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015

SwissFEL Project Concept of IPPC Characterization of the amplifier chain Controller design Results of IPPC at the RF test stand Conclusion and Outlook Agenda Page 2

SwissFEL Project Page 3 6 x 3GHz and 1 x 12GHz accelerator stations (phase tolerance ° and ° ) 26 x 6GHz accelerator stations (phase tolerance ° ) 720m 420m Tunnel Gallery

Page 4 Concept for first prototype The IPPC loop is separated from the LLRF control loop The klystron is operating in saturation therefore the focus is on an intra pulse phase control Studies of several digital and analog concepts have been done →Analog baseband solution has been chosen due to the higher control bandwidth Adjusting of controller parameters by potentiometers Calibration of RF mixer has been done manually for the first prototype The timing system is used to control S&H and resetting the Integrator

Group delay measurement  Rising edge of the different RF pulses has been taken into account => Delay of control path ≈ 100ns Characterization of amplifier chain  Pseudo Random Binary Signal (PRBS) method  Identification of transfer functions for amplitude and phase  Calibration done for excluding the different receiver inputs characteristics The actual LLRF system has been used as measurement system Characterization of Amplifier chain Page 5

Characterization with PRBS method Page 6 phase amp RF pulse after LLRF

Analog PI controller Page 7 PI parameters transferred from Simulink simulations The operational amplifier THS4031 and the analog switch ADG433 have been selected due to several criteria for an intra pulse system S&H was bypassed, the integrator reset command was operational In the lab test a control bandwidth of 1MHz has been measured

Setup at the test stand Page 8

Results of test stand Page 9 measurement Intra pulse pwr in MW(avg) Intra pulse phase stv. dev. in degree P2p phase jitter in degree Without IPPC IPPC in open loop IPPC in closed loop Fast IPPC in closed loop

Conclusion: An Analog baseband concept has been chosen due to higher control bandwidth With the characterization and simulation of the control path the control parameter for the prototype has been calculated. A prototype of the IPPC has been designed and tested (in the Lab and at the RF test stand) successfully Reached three times better pulse to pulse phase jitter when IPPC is used Outlook: 1.Integration of IPPC into the LLRF System 2.Re-engineering with respect to the frequency bands 3.Testing S-band IPPC system at the SwissFEL injector Conclusion & Outlook Page 10

Page 11 Wir schaffen Wissen – heute für morgen Thanks for your attention Questions? Special thanks goes to the entire PSI LLRF team