Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:

Slides:



Advertisements
Similar presentations
The MAD chip: 4 channel preamplifier + discriminator.
Advertisements

SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Readout ASIC for SiPM detector of the CTA new generation camera (ALPS) N.Fouque, R. Hermel, F. Mehrez, Sylvie Rosier-Lees LAPP (Laboratoire d’Annecy le.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
The EC-UNIT P. Barrillon on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Large area photodetection for Water Cerenkov detectors PMm 2 proposal: Front End Electronics MAROC ASIC Pierre BARRILLON, Sylvie BLIN, Jean-Eric CAMPAGNE,
TEST BOARD Power supply Multimeter Pulse generator Computer GPIB USB GPIB Ctest Vin ch1ch2 input OUT_FPGA_1 Power.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Vendredi 18 décembre 2015 Status report on SPIROC chips Michel Bouchel, Stéphane Callier, Frédéric Dulucq, Julien Fleury, Gisèle Martin- Chassard, Christophe.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
ASIC Activities for the PANDA GSI Peter Wieczorek.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
J1 J3 J2 FF0FF1FF2FF3FF4FF5 DM DD System ACE DC  DC The Cartoon Guide to the ZPD.
ILD/ECAL MEETING 2014, 東京大学, JAPAN
CALICE meeting LYON 2009, Hervé MATHEZ Yannick ZOCCARATO 1 PCB DEVELOPMENTS AT IPNL (PCB and ASIC) PCB for 1m2 of RPC with HR2 William TROMEUR, Hervé MATHEZ,
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
PArISROC Photomultiplier Array Integrated in Sige Read Out Chip Selma Conforti Frédéric Dulucq Christophe de La Taille Gisèle Martin-Chassard Wei
June 13rd, 2008 HARDROC2. June 13rd, 2008 European DHCAL meeting, NSM 2 HaRDROC1 architecture Variable gain (6bits) current preamps (50ohm input) One.
CSNSM SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
SKIROC status Calice meeting – Kobe – 10/05/2007.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
PADME Front-End Electronics
Setup for automated measurements (parametrization) of ASD2 chip
PMF STATUS ALFA - Electronics meeting 11th February 2008
Calorimeter Mu2e Development electronics Front-end Review
CTA-LST meeting February 2015
Status of the DHCAL DIF Detector InterFace Board
EC board for JEM-EUSO Design investigations
SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu –
Electronics for the E-CAL physics prototype
Front-end electronic system for large area photomultipliers readout
Status of n-XYTER read-out chain at GSI
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
STATUS OF SKIROC and ECAL FE PCB
University of California Los Angeles
HARDROC STATUS 6-Dec-18.
SKIROC status Calice meeting – Kobe – 10/05/2007.
Tests Front-end card Status
HARDROC STATUS 17 mar 2008.
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling: KIT with ASICs CQFP160 from MATRA – Delivery: 3rd of October SPACIROC asic tests: July 2012

3 Package: CQFP 160pins by MATRA Received in May: 105 chips Dedicated test board: – 5 test boards: ok – Firmware and software ok Bonding 3 programs: Automatic tests Read out and plot results for one asic Scan and plot the mean results for all asics

List of the tests: Asic consumption: Avdd, Dvdd DC measurements: – Bandgap voltage: 2.5V – Pedestals : PA (2.5V), FSU (1V), VFS (1V),KI (1.5V) per channels – DAC linearity: DAC PA, DAC FS, DAC KI Slow control readout: check srout output Photon counting tests: Qinj=1/3pe – Scurve versus threshold: trig_pa, trig_fsu Gain test: scurve versus threshold at different gains KI tests: – Qinj=2pC/channels, data_ki versus threshold – Threshold defined, data_ki versus input charge for 3 different slow control configurations 105 asics Test duration: 6 min ASICs have to be handled with precaution

Results: – 105 asics were tested – Yield: 80% (88% with some a bit noisy) Enough ASICs for prototypes (2 EC_ASICs), Flight Model (6) and spares (at least 2)

TOP VIEW AC E FD B BOTTOM VIEW 1 connector: HIROSE FX2-120P-1.27DS 120 pins Header Right angle type Through hole 6 connectors: HIROSE FX2CA-68S-1.27DSA 68 pins (64 analog signals + 4 gnd) Receptacle Straight type Through hole 6 asics SPACIROC1 Packaging: CQFP 160 pins 3 on each side 115 mm 159 mm

7 No power consumption: – Probably all bonding wires were broken in the 6 asics Diodes on the pad weren’t seen No connection between two pins connected inside the asic (example vdd! pin 120 and pin79) Soldering temperature cycle at LAL  Steaming (80°C, more than 10 hours)  Oven: 4 temperature steps  With lead: 180,200,221,250°C ASIC n°174: steaming + two soldering cycles  Asic OK ASIC n°138: no steaming + one soldering cycle  Asic HS: no bonding  It looks like steaming is mandatory (MATRA agrees) and we probably should go to soldering paste with lead

Week 27: Schematic Week 28 – Week 31: Routing Gerber files have been available since September 5th 5 test boards have been produced – Company: SOS electronic (France) – Order: 10 th September – Delivery: 20 th September – Cabling: LAL, week 39 Firmware is modified by Eric Plaige (LAL) Software is modified

9 TEST_EC-ASIC EC-ASIC Power supply connector regulators FPGA programmer connectors 40Mhz oscillator Lemo connectors 120 pin connector USB

EC_ASIC: – The next week, we will test the EC_ASIC equipped with plastic asics packaged by Riken and cabled at KIT. – MATRA will help us (for free) They will perform X ray-scan to check the asic bonding on the dead ones They will remove the 6 asics of 1 EC_ASIC and replace them manually They will test few (rejected) asics with their standard soldering temperature cycles (lead and lead-free) TEST_EC_ASIC: – 2 boards have been cabled – Firmware and software have been already modified – debug to be done as soon as we have a working EC_ASIC

12 Specifications:  Readout MAPMT signals  Consumption: 1mW/channel  Photon counting: 100% trigger (1/3pe, 10 6 Gain)  Charge/time converter input range : 2pc – 200pc (10pe pe)  Radiation hardness Spatial Photomultiplier Array Counting and Integrating ReadOut Chip 1st version received in October 2010 Technology: AMS 0.35µm SiGe Dimensions : 4.6mm x 4.1mm (19 mm²) Power supply: 0-3V Packaging : P(C)QFP240(160)

13 64 channels Preamplifier with individual 8-bit gain adjustment Photo-electron counting (10-bit DACs) – 3 discriminator outputs : Trig_PA, Trig_FSU & Trig_VFS – Multiplexed discriminator outputs to Digital part – Many parameters available Charge to time converters (called KIs) – Designed in collaboration with JAXA/RIKEN – 9 outputs : 8 channels (8-pixel-Sum) + Last Dynode – Many parameters available Continuous Data acquisition & Readout every 2.5  s (GTU) – 8 identical digital module for PC – 1 digital module for KI First version of SPACIROC showed good behavior (intensive lab tests with and without MAPMT)

14 Package: CQFP 160pins by MATRA Quantity: 100 Cost: 105€/asic Delay: – Package material : 2 weeks – 3 prototypes: 2 weeks – 100 asics: 2 weeks One test board has been produced to sort chips – Cabling ok – Firmware is the same as the previous spaciroc test board – Software should be modified to perform automatic tests

15 Asic inputs: – Group by 8 consecutive anodes according to the pattern 4 by 2 – No crossing between wires for consecutive layers Outputs: – Only two routing wires between two connector pins in order to keep a good isolation More than one layer for the outputs routing – No crossing between inputs and data outputs LVDS signals – Pay attention to the 40MHz clock Be careful to power supply planes to minimize the noise spread – Choice to have two layers for gnd and avdd Maximum isolation on critical signals

Each ASIC is configured via 898 bits of slow control and 265 bits for the probe set-up. The 6 ASICs of the EC_ASIC are configured in a daisy chain mode, meaning that respectively 5388 and 1590 bits are sent for the slow control and the probes. This daisy chain is done through the signals sr_in and sr_out, the sr_out of one ASIC being the sr_in of the following ones like described in the figure bellow.