Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF)

Slides:



Advertisements
Similar presentations
BAT Work Group. BAT Work Group Goals Develop a procedure for identifying technologies eligible for funding Propose policies and regulation necessary to.
Advertisements

CAERNARVON TOWNSHIP LANCASTER COUNTY June 17, 2013.
This is a manual presentation. Click NEXT for the next slide, BACK for the previous slide.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
On-site Sewage Facility (OSSF) Trends in Texas
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Introduction to Onsite Wastewater Treatment for Single Family Residences Texas AgriLife Extension Service.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
TECHNICAL SECTION 2000 TRAINING LIQUID WASTE LAND USE SOLID WASTE BIOSOLIDS HOUSING VECTOR WATER INDIVIDUAL PUBLIC.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Connecticut Department of Energy and Environmental Protection.
OCTOBER 22,  Process of Updating Zoning Ordinances.  Variances (prompted by State law changes).  Downtown District update.  Accessory Buildings.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Amendments to Chapter 30 & 38 (Zoning Regulations) 1 st BCC PUBLIC HEARING April 22, 2008 Amendments to Chapter 30 & 38 (Zoning Regulations) 1 st BCC PUBLIC.
Rules Overview: Why Do We Do What We Do Alisa Max, P.E. Harris County Alisa Max, P.E. Harris County.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Consistency Determination: City of Seaside Local Coastal Program FORA Board Meeting March 15, 2013 Agenda No: 8a.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
New Brighton Planning Commission Meeting April 18, 2006 Public Hearing: Zoning Ordinance Amendment: Section Regarding Commercial/Industrial Park.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
ENVIRONMENTAL PUBLIC HEALTH Onsite Wastewater Treatment Jim Gaughan, P.E., Environmental Engineer Bureau of Environmental Health Services.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Dockets R-11-06;07;09 Zoning Regulation Amendments Proposed Amendments to the Cochise County Zoning Regulations regarding Lot Development Administrative.
An Inspector’s Primer Larry Johnson Harris County Larry Johnson Harris County.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
TOPICS IN LAND SURVEYING: SUBDIVISIONS TREC #7220 TIM HOWELL, RLS TREC INSTRUCTOR #1556.
UTA - REAE /31/07: Architecture & Governmental Context for Development.
2010 California Building Standards Code Adoption Jeffrey Lambert, Community Development Director Brian Clark, City Fire Marshal Andrew Stuffler, Chief.
Presenter: Tushar Solanki GIS Workshop Subdivision Design in the City of Wilmer.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Matthew Johnson Harris County Matthew Johnson Harris County.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 2: Land-Use Controls and Property Development.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
Ordinance No. 544-B Proposed Amendments to the City of Southlake Landscape Ordinance Item 6A.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Applicant:Ann Blide / Calda Donna LLC Agent and potential purchaser:Ben Hanke Site Address:Part of Government Lots 1 and 2 Property #s: A Computer.
Park Land Dedication Guidelines. Purpose of the Presentation Outline the proposed process to provide guidance to the Park Board & City Council on the.
Ordinance No. 480-WWW Solar Energy Systems. What is a Solar PV System?
Regulatory Improvement Workplan: Policy Package 3 Planning Commission Recommendation to City Council July 28, 2004.
Item 4B – 480-IIII Text Amendment to Zoning Ordinance 480, as amended, as it pertains to temporary construction and/or sales facilities.
Ordinance No. 480-GGGG Assisted Living Facilities Item 4B.
Ordinance No. 480-GGGG Assisted Living Facilities Item 4B.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
Water Efficiency Ordinance ZCA No. 750
Central Valley Flood Protection Plan Senate Bill 5 Amendments
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Planning Commission Public Hearing September 9, 2016
2016 Development Regulations Update
Land Use and Zoning Committee Special Workshop
Tam O’Shanter Rezoning
AMBASSADOR WEST – CHANGES TO APPROVED PROJECT TO RESET ENTITLEMENT TIME LIMITS (City Ventures) City Council 3/28/11.
Competency: Create site plan drawings
BAT Work Group.
WPVAR (Greenview HOA) Washoe County Board of Adjustment March 7, 2019.
Accessory Dwelling Units: Maximum Unit Size and Residential Impact Fee

Presentation transcript:

Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF)

On-Site Sewage Facilities Existing Regulation Ordinance No. 514 (1990) Lots within 100’ of available sewer service must connectLots within 100’ of available sewer service must connect Minimum lot size for septic system is 1 acreMinimum lot size for septic system is 1 acre Section 41.3, Zoning Ordinance No. 480 Septic and spray fields must be shown on Concept PlansSeptic and spray fields must be shown on Concept Plans Section 33.14, Zoning Ordinance No acre minimum exclusive of area within floodplain, drainage & flowage easements, and “topographical limitations”1 acre minimum exclusive of area within floodplain, drainage & flowage easements, and “topographical limitations” Section 8.01, Subdivision Ordinance No. 483 Refers to minimum lot area required by zoning ordinanceRefers to minimum lot area required by zoning ordinance TCEQ / Tarrant County Health Permitting & Inspections of on-site sewage facilitiesPermitting & Inspections of on-site sewage facilities

Proposed Revisions Sections 33.14, 40.3, & 41.3 For properties proposing an on-site sewage facility, a plan is required that shows the type and location of the on-site sewage facility, topography of the site, location of spray fields, all easements, impact on any existing trees, and any additional information required by the Authorized Agent responsible for on-site sewage facility permitting and inspections. No building permit shall be issued until such plan has been reviewed and approved by the Authorized Agent nor shall any certificate of occupancy be issued until the system has been properly installed and inspected by the Authorized Agent.(As amended by Ordinance No YYY) No building permit shall be issued until such plan has been reviewed and approved by the Authorized Agent nor shall any certificate of occupancy be issued until the system has been properly installed and inspected by the Authorized Agent. (As amended by Ordinance No YYY)

Proposed Revisions Section 4 AUTHORIZED AGENT RESPONSIBLE FOR ON-SITE SEWAGE FACILITY PERMITTING AND INSPECTIONS – The individual, organization, or government entity contracted with the City that is responsible for the proper implementation of Texas Health and Safety Code Chapter 366 and Texas Administrative Code Chapter 285. (As amended by Ordinance No. 480-YYY)

Citizen Input / Board Review P&Z Discussion: February 5, 2009 P&Z Discussion: March 5, 2009 SPIN Meeting – March 23, 2009 P&Z Commission – April 9, 2009 –Approved as presented (7-0) City Council 1 st Reading – May 19, 2009 –Approved as presented (7-0)

Questions?

How do On-site Sewage Facilities Work? Anaerobic (Septic) Systems Not appropriate for much of North Texas’ soilNot appropriate for much of North Texas’ soil 15% of today’s installations are traditional “septic” systems15% of today’s installations are traditional “septic” systems Greater potential for odor, blockage, environmental impact, etc.Greater potential for odor, blockage, environmental impact, etc.

How do On-site Sewage Facilities Work? Aerobic Systems 48 different designs on the market48 different designs on the market Typically used with spray headsTypically used with spray heads Cleaner effluentCleaner effluent More equipment and electricity useMore equipment and electricity use Costlier and more potential for failureCostlier and more potential for failure

On-Site Sewage Facilities Policy Considerations Leach / Aeration Field SetbacksLeach / Aeration Field Setbacks –Between 25’ and 50’ Drainage, Flowage, & Floodplain EasementsDrainage, Flowage, & Floodplain Easements Detailed OSSF plans for developments of __ lots or more or for R-PUDs, etc.Detailed OSSF plans for developments of __ lots or more or for R-PUDs, etc. Requiring maintenance contract for C.O.Requiring maintenance contract for C.O. Building Code:Building Code: –Maximum distance under ground 8-12 inches –Air pressure gauge requirements