Operations meeting on FY07 Shutdown Date: June 27, 2007. W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
STAR W.B. Christie, BNL STAR Collaboration meeting Michigan State University August 13, Summary of the FY03 Run, the Shutdown work, and plans for.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
Bill Christie For the STAR Collaboration June 15,
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
LS1 planning meeting
BSS Prep work at CERN and Acceptance of Parts
LHC Experimental Vacuum Systems Status October ‘07
25th Avenue Grade Separation
25th Avenue Grade Separation
Polarized 3He target installation
Presentation transcript:

Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments on Working at the STAR site

June 27-July2: Remove Shield Wall (3.5 days, Riggers) June 27 – July 2: Remove Vacuum pipe spool pieces. July 3: Pull East Poletip July 5: Pull West Poletip. Install scaffolding E&W. (Charlie & Steve) June 27 – July 13: Remove SVT RDOs, extender cables, and cabling back to the Racks. Remove EEMC Trigger Cables. June 27 – July 18: Install Rollers and disconnect utilities, and roll STAR to AB and connect utilities. July 20 – Aug. 24: EEMC electronics maintenance. July 19 – 27: Install SVT platform, FTPC West platform, and disconnect end of cone cables, remove FTPCs, and extract cone to platform. July 30 – Aug. 14 : Remove SSD, SVT, all utilities on cone, and reassemble cone. Aug. 1 – 15: Install new BEMC PMT comm./controls system. Aug : Reinstall cone, reinstall FTPCs, & remove rails. Remove installation platform. Aug. 22 – 27: Disconnect utilities. Aug : Roll STAR back into IR. Aug. 30 – Sept. 10: Install Utilities. Draft STAR Shutdown Schedule/Plan Summer Sunday July 2007 August 2007

Sept. 6 – 18: Beam Pipe Bakeout Sept. 11 th : STAR in IR with utilities connected. Sept. 11 – Oct. 12: TPC Electronics maintenance. October 1 st : TOF Trays arrive at BNL for installation. Oct. 15 – 18: SGIS Certification. Oct. 17 th : West Poletip installed. Oct. 24: East Poletip installed. Oct. 25 – 30: Magnet testing. Nov. 1 st : Collider Cooldown Begins. Nov. 1 – 2: Install BBCs. Nov. 7 th : Lose access to IR for Collider Commissioning. Still Open: * When/where best to install TOF trays? Best locations 2, 4, 7, & 10:00. * Details/plan for the TOF water system? Collider Cooldown Begins September 2007 October 2007

June July Dates/Tasks: 27 th – Install Hydraulic sys. Pressure gauges 28 th – Remove BBC’s, remove VPDs, start on EEMC Trigger cable removal. 29 th – Start Vacuum pipe spool pieces removal (East first), continue EEMC effort. Dates/Tasks: 2 nd – Start removal of Shield wall. Continues till ~ Thursday noon. - Start removal of TPC pipes/utilities - removal of Magnet water lines, and blow out coils 3 rd – Continue TPC utilities removal (finish?) - Start West SVT RDO removal (?) 5/6 th – Remove East Poletip 9 th – 17 th – Pull West Poletip, Remove SVT RDOs, drop all water/gas/power connections, install Hillman Rollers, Remove stairs and Bridge for move. 18 th – Planned date for Rolling STAR to AB.

General Comments on Work in the STAR Facility Work Planning: - N.B. All work undergoes Work Planning. Most of this is what’s known as Worker Planned work. Before you start on a task think about what you’re going to do, how you’re going to do it, what the hazards are, and how you’ll minimize these possible Hazards. - As a General rule, Bob or Bill should always know who will be working in the Facility, and on what, every week. Please make every effort to keep us informed. Safety: - All work should be performed in compliance with Safety rules. If there is a conflict between schedule and Safety, Safety must take precedence in all cases. - If anyone is ever in doubt about how to perform a task, please contact Bob, Bill, or both. - In the course of accomplishing your tasks throughout the Shutdown, if anything becomes apparent on how we could work safer, please bring them to Bill or Bob’s attention. - If you see anyone doing something that appears unsafe, or somehow incorrect, please bring it to Bob or Bill’s attention. Housekeeping: - In performing work in the STAR Facility please clean up after yourself at the end of each day. Examples are picking up cable tie remnants, paper from Label makers, misc. “litter” that results from your work.