News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16, 20151.

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Status of the ATLAS MM project
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Tracker Summary Alan Bross MICE CM October 10, 2007.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
MM detector construction One or several modules per sector considerations.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
WELDING TESTS & OTHERS ISSUES SUMMARY
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
About PMTs first series cold and warm tests G. Raselli (INFN and Universita di Pavia) F. Tortorici (INFN and Universita di Catania) M. Rossella (INFN and.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
University of Wisconsin
HF Test station at P5 A.Mestvirishvili.
Complementary ISTC Projects #3888, 3889p
News about the WA104 Programme
Mini-drawers, FE-ASIC , Integrator
Far Detector Activities Late 2017 – Early 2018
MicroMegas Mechanical Meeting --- Cern April 2014
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Teleconference ACS – FREIA 19th June 2017
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
Presentation transcript:

News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16, 20151

Recent news l Meeting with INFN Commissione II referees: l Discussion on 2016 funding (Tuesday, Sep 15) : Missions, R&D on light collection and timing for the run at FNAL, readout electronics for the wire chambers. l INFN, through Commissione II, will fund all the readout electronics. l The other activities will be funded according to the needs. l Final discussion at INFN Commissione II the next 22 nd of September. l FNAL Director review: l A first meeting will take place at CERN the next 15 th and 16 th of October: agenda still to be defined and agreed. l Review dedicated to the evaluation of the available resources and their conformity with the project plans. l Cathode flattening: l Five panels already processed at CERN Main Workshop: all panels of the first module completed by end of September. Will be sent to electro-polishing during October. Re-installation in November. l PMTs procurement: l 20 units pre-series will be delivered during the week of the 20 th of September. l Offers for the PMTs mechanics arrived, the procedure for the procurement closes on September 16. Deliveries by end of November. Slide: 2 technical working group meeting, September 16, 2015

Recent news l PMTs tests and installation: l Location in Ideasquare (Dark room) almost complete: should be ready for operation by the arrival of the pre-series units. l Area in B182 for cold tests is ready: shared operation with WA105, should be available for PMTs tests at the beginning of October. l Evaporator being re-installed in B169. Cleaning of the components will be done at Prevessin site. l Detector re-cabling: l Pre-series units of the decoupling PCBs will be delivered at the beginning of next week (September 21 st or 22 nd ). l Components and connectors for pre-series have been ordered. l Assembly of the pre-series and cold tests by the third week of October. l Full production by end of l A first sample of the new cables is being delivered for tests in LAr. l Full production of cables by end of Slide: 3 technical working group meeting, September 16, 2015

Recent news l Cold vessels procurement and assembly: l Extruded components are being produced; 10 panels (stiffening frames) already delivered to CERN together with 2 angular pieces of the stiffening frames. Tests on chamfering and welding started at the main workshop. l Final offers for the end caps will arrive by end of this week. l Assembly scheme and tooling finally defined, which includes cold vessels rotation to allow for all horizontal welding (see Marzio talk). Slide: 4 technical working group meeting, September 16, 2015