English Bayou Basin Storm Water Master Plan Presentation to Calcasieu Parish Police Jury Lake Charles April 29, 2010.

Slides:



Advertisements
Similar presentations
Rehabilitate Newsome Creek Watershed BPA Project #
Advertisements

October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Volusia County Public Works
CHARACTERISTICS OF RUNOFF
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Hydrologic Studies Unit Land and Water Management.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
SEDSPEC Sediment and Erosion Design and SPECification Tool Dr. M. Sharif USACERL (800)
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Hydrologic Models for Urban Floodplain Mapping and Damage Reduction in Brownsville, TX Philip Bedient Rice University CEE Department Houston, Texas March.
3-in-1 Stream Restoration Using AutoCAD® Civil 3D®, Map 3D, and Autodesk® Storm and Sanitary Analysis Heather Nagel Application Engineer.
Ross Valley Flood Control and Watershed Program Marin County Flood Control and Water Conservation District ~ Flood Control Zone 9 ~ Marin County Department.
Rush Creek: A Story of Redemption. Arlington Stormwater Division  Stormwater Division of Public Works is:  Engineers  Education  Environmental Compliance.
Drainage Task Team Volusia County Public Works Judy Grim, P.E. Road and Bridge Director.
Hydraulic and Hydrologic Considerations in Planning FLOOD RISK MANAGEMENT CLASS EXERCISE Chuck Shadie Mississippi Valley Division.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
BASIN and RIVER SYSTEMS Divide Dam at Lake TravisDEM of Trinity River.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
An exercise in stream restoration and redesign
Guidelines for Stormwater Drainage Analysis and Design
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
WARE RET 2014 – Understanding the Engineering Design Process within the Local Watershed Mirko I. Soko 1, Mentors 2 : Ryan C. Locicero, Dr. Maya A. Trotz.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
Introduction to Urban Hydrology
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
Review The point of case studies. Case Study 4 The case of the flooded basements.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
Courthouse and Jail Maintenance Tax Background Originally passed in 1987 at 3.50 mills in conjunction with major capital improvements which included a.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Storm Water Management Plan Lawrence County, PA Katelyn Zollos CE 549.
Bayou Verdine Superfund Site
Environmental Services
Swamp Creek: Culvert Replacements
West Houston Association
Capital Metro Downtown Station Improvements
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
GBANS - Steps 4, 5 & 6 NOTE TO INSTRUCTOR: Offer to the team to display this slide for the team’s presentation.
Flooding adapted from a presentation by Prof. David R. Maidment
The Woodlands - a Totally Planned Community
Town of Melbourne Beach
Babcock Basin-Design Phase
Measure A Financial Oversight Committee August 7, 2013
Proposed CSES research in hydrology and water resources
Introduction to Urban Hydrology
The Woodlands - a Totally Planned Community
Hydrology.
Risk Mapping, Assessment, and Planning
Regulation Amendment AM April 3, 2018.
Chamber of Commerce April 2, 2014
Regional flooding frequency analysis
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Water Quality Protection Zones
Study of Miles City Slough
Fab-Five Projects New Orleans FY19-FY23
Love Field Modernization Program
Department of Environmental Quality
Monterey County Project Report for Measure X Expenditures
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Girty's Run Flood Control Alternatives Analysis
Presentation transcript:

English Bayou Basin Storm Water Master Plan Presentation to Calcasieu Parish Police Jury Lake Charles April 29, 2010

Project Objectives Develop hydrologic and hydraulic models for storm waterDevelop hydrologic and hydraulic models for storm water Identify flood prone areasIdentify flood prone areas Identify undersized major culverts, drainage channel limitations and other watershed deficienciesIdentify undersized major culverts, drainage channel limitations and other watershed deficiencies Develop alternatives for Capital Improvement PlanDevelop alternatives for Capital Improvement Plan

Project Tasks Collect and organize existing relevant data (Geospatial data, hydrologic and climatic data, environmental data)Collect and organize existing relevant data (Geospatial data, hydrologic and climatic data, environmental data) Perform topographic surveys on all modeled channels and structuresPerform topographic surveys on all modeled channels and structures Develop hydrologic and hydraulic modelsDevelop hydrologic and hydraulic models Analyze existing conditions and drainage issuesAnalyze existing conditions and drainage issues Develop improvement alternatives and recommendationsDevelop improvement alternatives and recommendations

Project Area The English Bayou Basin consists of approximately 90 square miles; approximately 41 miles of drainage channel (shown in blue) were analyzed.

Existing Conditions

Antoine GullyAntoine Gully

Proposed Improvements Flood-prone areas and channel deficiencies were identified.Flood-prone areas and channel deficiencies were identified. Recommended improvements include:Recommended improvements include: –Replacement of undersized culverts –Modifications/upgrading of road crossings –Channel improvements (widening & deepening) –Channel paving –Detention Basins Construction cost estimatesConstruction cost estimates

Proposed Improvements Examples English Bayou Channel ImprovementEnglish Bayou Channel Improvement

Proposed Improvements Examples English Bayou Channel ImprovementEnglish Bayou Channel Improvement

Proposed Improvements Examples English Bayou Channel ImprovementEnglish Bayou Channel Improvement

Proposed Improvements Examples Bayou Arsene Channel Cleaning and GrubbingBayou Arsene Channel Cleaning and Grubbing

Summary of Proposed Improvements IDDescriptionCost Estimate English Bayou EB-1AConcrete Lined Channel along EB L-14$5,055,375 EB-1BDetention Pond along EB L-14$38,000,000 EB-2Cleaning and Grubbing EB L-12$47,000 Antoine Gully AG-1Cleaning and Grubbing of AG-1$22,750 Bayou Arsene BA-1Cleaning and Grubbing of BA-1$288,800 to $577,200

Summary of Proposed Improvements IDDescriptionCost Estimate Kenner Gully KG-1Channel Improvement along KG-1$2,100,000 KG-2Cleaning and Grubbing along L-2$139,100 Coon Gully CG-1AChannel Improvement of CG-2$213,900 CG-1B Alternative CG-1 with pond improvements$408,900 CG-2Storm Sewer along Nanna Rd$1,000,000 CG-3Cleaning and Grubbing along CG-1$161,200 to $322,400

Questions?

Proposed Improvements Examples Coon Gully ImprovementCoon Gully Improvement

Proposed Improvements Examples English Bayou Channel ImprovementEnglish Bayou Channel Improvement

Study Channels