State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.

Slides:



Advertisements
Similar presentations
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Advertisements

Decommissioning Plan for Kozloduy Nuclear Power Plant Units 1 & 2 E
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
ASME Nuclear Conformity Assessment
25 years of Chernobyl disaster: challenges and progress.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
History of Nuclear Safety Legislation in Pakistan
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Safety Analysis Report for Decommissioning of KNPP Units 1 and 2 A
1 MAIN ASSUMPTIONS  Federal Law “ON USE OF THE ATOMIC ENERGY”  Federal Law “ON RADIATION SAFETY OF THE POPULATION”  Law of Russian Federation “ON CONSERVATION.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Bulgaria.
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 BULATOM - SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA International Nuclear Forum Bulgarian Nuclear.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
35-th Consultative Meeting of INIS Liaison Officers, October, 2010, Vienna Austria BULGARIAN INIS CENTRE INIS INPUT AND PRODUCTION Ms. Albena Georgieva.
National Radioactive Waste Management Agency Bill 25 MARCH 2008.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Massimo Garribba Director, Nuclear Energy, Safety and ITER
2013 ISOE International ALARA Symposium
Preliminary Decommissioning Plan for the Canadian Light Source
Radioactive waste repositories
Vermont Yankee Decommissioning Update
Project General Data Beneficiary: Rosenergoatom
Janet R. Schlueter Senior Director, Radiation and Materials Safety
IAEA Safety Guidance on Licensing and Oversight Activities
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Regulatory Control Training Workshop
Possible Transition from Operating to Decommissioning
RCF Plenary Session 21 September 2018
USNRC IRRS TRAINING Lecture18
National Radioactive Waste Management Agency Bill
Radioactive Waste and Spent Fuel Management in Hungary
Legal and Regulatory Framework for Nuclear Installations in IRAN
Regulatory system in Hungary
Presentation transcript:

State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands DECOMMISSIONING OF KOZLODUY NPP UNITS 1÷4 PROGRESS AND CHALLENGES With care for the future …

State Enterprise Radioactive Waste SE RAW- Activity, Management, Structure Activity: Management of RAW and decommissioning of nuclear facilities Management: : 1.Minister of Energy; 2. Management Board of SERAW; 3.Executive Director – representative SE RAW. Structure: 1. Head Office; 2. Four Specialized Divisions.  SD “Radioactive Waste – Kozloduy” – management of RAW from NPP;  SD “Permanent Repository for Radioactive Waste – Novi Han” – management of RAW from nuclear applictions;  SD “National Repository for Radioactive Waste“ – construction, commissioning and operation of a repository for long-term storage of low- and intermediate-level RAW;  SD “Decommissioning 1-4 Units” – decommissioning of nuclear facilities and management of RAW from decommissioning.

State Enterprise Radioactive Waste Decomissioning Kozloduy NPP Units 1÷4 Units 1 and 2, VVER – Operation shut down; The Bulgarian government declared Units 1 and 2 as installations for RAW management and entrusted them to the SERAW; SE RAW was granted licenses for operation of Units 1 and 2 as installations for management of radioactive waste; SE RAW was granted licenses for. decommissioning of units 1,2; Units 3 and 4, VVER Operation shut down; The Council of Ministers declared Units 3 and 4 as installations for management of radioactive waste and entrusted their management to SEEAW; SE RAW was granted licenses for operation of Units 3 and 4 as installations for management of radioactive waste.

State Enterprise Radioactive Waste Funding Financial support from:  Radioactive Waste Fund (RWF) to the Minister of Energy;  Fund for Decommissioning of Nuclear Facilities (FDNF) to the Minister of Energy;  Kozloduy International Decommissioning Support Fund (KIDSF) – it was established by EC and is administered by the European Bank for Reconstruction and Development (EBRD).

State Enterprise Radioactive Waste  The strategy for decommissioning of Units 1-4 is “brown field“;  Continuous dismantling of equipment;  Completing the process of Decommissioning of Units 1-4 by  Key Phases (Principal Activities): 01. Pre-decommissioning activities; 02. Facility shutdown activities; 03. Procurement of equipment; 04. Dismantling activities; 05. Treatment of RAM and RAW and delivery for disposal; 06. Site management and support; 07. Project management and engineering; 08. Management of SNF and activated materials. Strategy for decommissioning of Units 1÷4 of Kozloduy NPP

State Enterprise Radioactive Waste  Remaining for dismantling – pipelines, serving platforms, valves etc. The turbine foundations of Units 1 and 2 are also dismantled. Dismantling activities  Almost all large equipment in the Turbine Hall is dismantled.

State Enterprise Radioactive Waste Dismantling activities  Control area – All dummy assemblies and boron absorbers are removed from the reactors and put into the Spent Fuel Pond-3. Boron units 1 and 2 are dismantled. The intermediate circuit of Unit 1 are currently in the process of dismantling.

State Enterprise Radioactive Waste  Radiological survey of Units 1 and 2 of Kozloduy NPP;  Developеd and approved free release procedures for units 1-4;  Determining the specific activity of the radionuclides by the bodies accredited for testing or control;  The released materials compliance with the levels and the criteria for free release is certified by accredited;  Order of the BNRA chairman for Free release. Free release of dismantling materials

State Enterprise Radioactive Waste  Sites for management of materials from the decommissioning activities;  Size Reduction and Decontamination Workshop (SRDW);  Free Release Measurement Facility (FRM);  Facility for Retrieval and Processing of The Solidified Phase from Evaporator Concentrate Tanks;  Facility for Retrieval and Stabilization of Spent Ion Exchange Resins;  Plasma Melting Facility. New facilities

State Enterprise Radioactive Waste Delivered under implemented projects diamond rope cutting machines, machines for concrete structures demolishing, lifting equipment, multifunctional telescopic handler, mini-excavator and mini-loaders with various attaching devices, vertical and horizontal electric band-saws for cutting metal, crane LIEBHERR 130 t, richstaker, different types of containers ect. Deliveries of equipment

State Enterprise Radioactive Waste  Receipt of decommissioning licence for Units 1 & 2;  Preparation of documentation for decommissioning licence for Units 3 & 4;  Further development of an integrated waste management strategy;  Develop and approve new free release procedures;  Development of Risk management procedure for decommissioning;  Dismantling about tons of equipment (metal) in turbine halls of Units 1-4;  Demolition of civil structures in Units 1 and 2 Turbine Hall or about 5000 tons. Important steps till 2015

State Enterprise Radioactive Waste  Receipt of decommissioning licence for Units 3 & 4;  Commissioning of Size reduction and decontamination workshop;  Commissioning of RAW treatment facilities;  Commissioning of Plasma Melting Facility;  Receipt of accreditation for SE RAW Control Body for testing or control;  Decontamination of Spent Fuel Ponds and Emergency feed water Tanks;  Dismantling of DGS-1 and reconstruction of the building for producing of reinforced concrete containers. Upcoming activities

State Enterprise Radioactive Waste Analyze of performance The process of decommissioning of Units 1 to 4 is under implementation according to the approved schedule and dismantling work in the TH is expected to be completed in due time, i.e. the end of Management of dismantled materials is difficult due to the lack of licenced sites for management of materials from the decommissioning activities, as well as due to the long free release procedures. In order to solve the above mentioned issues, the following measures have been taken:  Performance of a Project for Design and Construction of Sites for Management of Materials from the Decommissioning Activities at Kozloduy NPP Units 1-4, which is to be completed in the first quarter of Currently the construction activities are ongoing.  In accordance with the current Ordinance on the Release of Materials from Regulatory Control, which contain more than one radionuclide, a software and hardware upgrade was implemented on the FRM-02 and SERAW expects to receive an Inspection Body accreditation.

State Enterprise Radioactive Waste Challenges & solutions  The preparation of the CA and auxiliary buildings for dismantling has started on schedule, as well as the dismantling of potentially contaminated equipment;  Management and treatment of decommissioning RAM and RAW will be assisted by putting into operation of the Size Reduction and Decontamination Workshop (SRDW) and Plasma Melting Facility (PMF) which is scheduled for 2017;  Management of RAW from the Mortuaries in the CA is another challenge for SERAW and in that regard a Feasibility Study for the Management of “Mogilnik” storages of KNPP Units 1-4 is first planned to be carried out and thereafter a management approach is to be selected;  Regarding dismantling in the CA, SERAW is in the process of Elaboration of a Design for Dismantling of Equipment in the Controlled Areas of KNPP Units 1-4 ;  Based on the selected option for dismantling, particularly the Reactor Pressure Vessel (RPV), reactor internals and the rest activated components, the Consultant shall justify by relevant analyses the requirement for temporary storage areas for activated equipment by complying with the best international practices.

State Enterprise Radioactive Waste Results

State Enterprise Radioactive Waste THANK YOU FOR YOUR ATTENTION !