CENF SB WG report CENF PTM meeting 25 th July 2013 M. Calviani for the CENF SB team.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Lali Tchelidze Safety work package leader
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
ST Workshop 1 April 2003P. Vojtyla - TIS/IE1/10 Interaction of TIS and ST in Environmental Matters P. Vojtyla TIS – Integrated Safety and Environment.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Secondary beam production facility layout discussions SBLNF meeting 5 th Dec M. Calviani, A. Ferrari, R. Losito (EN/STI) H. Vincke (DGS/RP)
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Cooling System Solutions
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
Extraction and beamline progress B.Goddard TE/ABT.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
The integration of 420 m detectors into the LHC
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Possible Layout of Positron Target Region Peter Sievers and Kaoru Yokoya MiniWS, KEK 2016/4/19 Target Region Layout, Yokoya 1.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Engineering studies for the Conceptual design of the LBNO Facility 1 F. Sanchez Galan (CERN) on behalf of the CERN Secondary Beam Working Group, With contributions.
SHiP target and target complex Plans and perspectives M. Calviani, A. Perillo-Marcone (EN/STI) 7 th SHiP Collaboration Meeting 10 th February 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
CENF target station and secondary beam design M. Calviani (CERN) on behalf of the CENF Secondary Beam Working Group ICFA Neutrino European Meeting – 8-10.
CENF target station and secondary beam design M. Calviani (CERN) on behalf of the CENF Secondary Beam Working Group CENF/LBNE meeting – 5 th February.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
RaDIATe/BLIP Status of irradiation campaign of Ir, TZM, Si and Graphite-SiC coated samples Claudio Torregrosa, Elvis Fornasiere, David Horvath, Antonio.
Update on PANDA solenoid design
Heating and radiological
STRAW TRACKER SYSTEM CAD STATUS :
Status of GASPARD mechanics
EDMS v.1 02/07/2013 General trends in ventilation of radiation zones from the viewpoint of public exposure P. Vojtyla / DGS-SEE-XP.
CLIC module working group
Studies on Energy Deposition and Radiation for the 4horn system
Coordination meeting 12/05/15
Status of BDF/SHiP target & target complex (TTC) studies
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Presentation transcript:

CENF SB WG report CENF PTM meeting 25 th July 2013 M. Calviani for the CENF SB team

Trench design 225th July 2013M. Calviani - CENF PTM meeting report of the SB WG 18 m S. Girod

Trench design 325th July 2013M. Calviani - CENF PTM meeting report of the SB WG TBI Internal shielding completed S. Girod

Integration status 4  In the pipeline:  Integration of the trench inside the CE CATIA model – input to EL/CV services integration  Modeling of the shielding to fit the available space (5 mm gap)  Complete the ducts and cables/signals that have to exit from the He-vessel  Update the support module for the TBID-like (manual operation)  Add emergency water extraction from the vessel into the recuperation pond upstream the target building 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG

CE layout 5  Trench length sync’d with integration (18 m)  Potentially radioactive water recuperation pond  Evaporator part of the “industrial process”  240 cm Fe shielding  350 cm concrete shielding 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG CENF E N. Baddams/L. Faisandel

6  Building size increased by 2.5 m laterally, 4 m longitudinally  Several placeholders (horn/reflector powering, ventilation units, evaporator, etc.)  Crane allowed space to be modified 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG N. Baddams/L. Faisandel

725th July 2013M. Calviani - CENF PTM meeting report of the SB WG N. Baddams/L. Faisandel

Target studies 825th July 2013M. Calviani - CENF PTM meeting report of the SB WG Pipe Material Pipe Internal Diameter (mm) Pipe Thickness (mm) Target Deflection (mm) Stainless Steel (316 L) Ti-6Al-4V Beryllium A. Perillo-Marcone

Target studies + He- vessel 9  Structural stiffener needed to keep the target straight  Stainless steel or Ti pipes produces too high bending  Be pipes produces acceptable bending even for small diameter and thickness  Thin Be pipe seems to be feasible (several companies already contacted) 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG A. Perillo-Marcone, M. Hora  Structural studies for the He-vessel are ongoing  Looks feasible with stabilizing bars and He-vessel thickness of 5 cm (in the assumption of vacuum needed for He-filling)

RP updates 10  FLUKA geometry is being brought inline with the CE modifications  320 cm of concrete shielding sufficient RP-wise  Design of the primary/secondary beam interface to be iterated, as it is weak point in the shielding 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG C. Strabel, K. Zabrzycki, H. Vincke

Ventilation design of radiation zones 11  Interesting presentation by P. Vojtyla (link)link 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG P. Vojtyla  Dynamic confinement requires extraction  Prevailing part of exposure due to short-lived radioactive gases ( 11 C, 13 N, 15 O, 14 O, 41 Ar)  Recommendations:  Only way of reducing activity is to delay before release  Aerosol filters in a continuous way (semi-closed system)  Use of evaporator & avoid condensation of water Hypothetical house – NW (250 m) Wind rose 2011 BA4

Conclusions and next steps 12  Next CENF SB meeting, 1 st August at 14h (CENF PTM slot)  Foreseen discussions  Status of integration  Update on He-vessel calculations  Discussion on the new access system (requirements, safety aspects and sectorization)  Transport and manipulation configuration (crane design, redundancy, etc.)  Update on the electrical infrastructure (load distribution, preliminary association of services with infrastructure)  Start discussions on the CV requirements (TBC)  More news on the horn/reflector powering part 25th July 2013M. Calviani - CENF PTM meeting report of the SB WG