1 Balancing Science and Engineering D Lumb. 2 Science Instrument Funding Generally the spacecraft and common systems are provided by ESA, the instrumentation.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

The Role of Environmental Monitoring in the Green Economy Strategy K Nathan Hill March 2010.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
Martin Schuurmans Chair EIT The EIT Sustainable Growth and Competitiveness through Innovation.
Course: e-Governance Project Lifecycle Day 1
MAVERICK LEADERSHIP UNLIMITED eCD Afrika PROJECT MANAGEMENT VANI MOODLEY 3 RD MARCH 2012.
IW:LEARN TDA/SAP Training Course Module 4: Planning the TDA/SAP Process.
Solar Orbiter Payload Working Group Mid-term meeting November 2002, ESTEC 1. PDD Activities - Status of PDD inputs - Discussion of each instrument.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
MTF Rail Development Forum
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
CS350/550 Software Engineering Lecture 1. Class Work The main part of the class is a practical software engineering project, in teams of 3-5 people There.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Electrical Engineering Capstone Courses EE-4BI6 Electrical and Biomedical Engineering  Dr. Hubert deBruin EE-4OI6 Electrical and Computer Engineering.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
S/W Project Management
Computers & Employment By Andrew Attard and Stephen Calleja.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
University Strategic Resource Planning Council Budget.
Training of Process Facilitators Training of Process Facilitators.
Copyright © 2009 International Water Association STEP 2 ESTABLISH PRELIMINARY WSP VISION.
Industrial Engineering Roles In Industry
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
National Centers for Coastal Ocean Science Environmental Management System Implementation August 2005.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Getting There from Here: Creating an Evidence- Based Culture Within Special Education Ronnie Detrich Randy Keyworth Jack States.
Genova 3-4/11/2011 DoCuP Presentation 1 Dissemination In order to assure the best information on the activities and the best dissemination of the results.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
2010 Planetary Science Technology Review Interim Report; Assessment Phase National Aeronautics and Space Administration Prepared by the PSTR panel, advisors,
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
Horizon 2020 – 2016 Transport Call
Improving the world through engineeringwww.imeche.orgImproving the world through engineeringwww.imeche.org A proposal to develop a new knowledge transfer.
National Center for Coastal Ocean Science Environmental Management System Implementation August 2005.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
A Different Focus on NASA Science Mission Success (a first cut) Mark V. Sykes Planetary Science Institute.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Ondřej Přibyl L3: System Development Life Cycle page 1 Lecture 3: System Development Life Cycle Doc.Ing. Ondřej Přibyl, Ph.D. Department of applied mathematics.
Standards Certification Education & Training Publishing Conferences & Exhibits ISA Standards for Automation An Overview.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Future Earth research for global sustainability: The governance structure mechanisms Rik Leemans & Peter Liss Transition Team Members photos:
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
Managing Enterprise Architecture
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Project Management and Monitoring & Evaluation
Project Management Lifecycle Phases
Systems Engineering Management
Composition of eXTP mission
ASTRONET Coordinating strategic planning for European Astronomy
PSS verification and validation
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

1 Balancing Science and Engineering D Lumb

2 Science Instrument Funding Generally the spacecraft and common systems are provided by ESA, the instrumentation by Member States In principle a competitive AO process, but often a single consortium comprising many nationalities provides the instrument(s) In the past a problem that the key instrumentation would not be developed on time, resulting in expensive delays Science Programme Review Team (2007) recommended no mission should go to “adoption” for production phase until adequate Technology Readiness Level was demonstrated Means there is a competitive study phase of ~4 missions in parallel until end phase A We have now a “Catch-22” because member states unwilling to commit to instrument development until a mission is selected, in case the investments do not provide a return

3 The new process Cosmic Visions has several described several “themes” ~Biannual calls for Medium (1 year budget) or Large (2 year budget) missions covering Astronomy, Planetary and heliospheric physics in these thematic areas Pre-phase A to define payloads in some detail, then studied with industry and proto-instrument consortia to confirm schedule, cost and feasibility and a competitive selection After selection the implementation phase typically can take 7+ years with various drawn out milestones reviews Missions are breaking budgets! Per planet or astronomy wavelength band there is only possibility for <1 mission per decade

4 Science Teams Typically the Agency appoints an advisory Science Team from the pre- Phase A Study through until operations The make-up changes according to their commitments, conflicts and skill sets. Can be from PIs and/or community scientists, depending on the flavour of the mission Chaired by Project Scientist, reports to the Science Programme Committee but not powerful when the implementation contract starts A key responsibility is to provide a “YELLOW BOOK” that should sell the science case (contrast the internal ESA technical assessment report) Define, elaborate and defend science requirements Need to respect the geographic interests of payload and industry If the engineering constraints define a reduction in science goals then the Science Team should provide the advice to the Director

5 Project Teams Management Team at ESA is an engineering team that follows and manages the industry contracts, whereas the science support department in ESA only has oversight of operations and little input to the hardware implementation Mainly cost and schedule focussed Bus driver to get a spacecraft to orbit! Not necessarily interested in final in-orbit science products Excepting how to define hand-over point and finalise the industry payment The best PMs are motivated by the science product and will engage with payload teams to leverage any critical development solutions

6 Payload Consortium Select proto-consortium(a) before phase A to elaborate the instrument designs and work in parallel with industry Ensures that schedule and costing understood by member states before mission adoption Supposed to ensure that the technology development plans are already under way to ensure an acceptable TRL before adoption However this requires a substantial commitment from funding agencies, as well as the academic team, before the mission is even selected. Lots of bitterly disappointed scientists (eg MarcoPolo R)

7 Science Requirements Level 0 e.g. “Determine Equation State of Neutron Stars”, “Return a pristine sample of solar system primordial material” Level 1 e.g. “Measure the M-R relation of 10 NS to accuracy 4%”, “Measure the turbulent pressure support in intracluster gas via. velocity broadening to <100km/s” Level 2 – very specific science measurement programmes and observations, leading to instrument science performance requirements e.g. “Effective area at 1keV of 1m 2 “, “Total noise in 200s exposure of 5 electrons r.m.s.”

8 From Science to Engineering Then leave engineers to interpret and translate Level 2 science requirements into engineering requirements The engineering requirements can be implemented in hardware - engineers supposed to create new implementations cf. the proposed ones from science PIs We are learning this decomposition process is very difficult, but if a good decomposition occurs it can carry across the whole project phase However there are many difficulties when the scientist has a particular implementation idea Preliminary Requirements Review as part of selection process Experiment Interface Documents Science Management Plan

9 Conflicts during Design and implementation Mission lifetime – a lifecycle cost driver, from operations as well as demonstrating hardware durability. Impacts observing programmes Observability – pointing constraints (solar aspect angle, communications) can reduce the accessibility of targets that compromises the assumed mission duration Payload safeing – radiation events, spacecraft contingencies can force design changes that modify the instrument and its operations Communication – ground station availability, link budgets can affect the data rates assumed, payload health monitoring and also the cadence of commanding new observations Mechanisms – swopping between instruments, scanning optics, doors, filters are life-limiting or single point failures and are avoided Data proprietary rights, calibration and PR issues can impact the protocols for operations

10 Other science institute involvement Earth Observations – all instruments industry built to specifications They tend to have science organisations under contract for roles such as performance simulations etc. Under science directorate, putting the load of operations onto member states as a cost-saving measure. Also facilitates seamless (?) transition for instrument knowledge to operations But cradle to grave problem – e.g. XMM-Newton in orbit for 14 years and universities cannot sustain the effort and skill base over that time