Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.

Slides:



Advertisements
Similar presentations
Offshore Technical Integrity Safety Critical Elements and Performance Standards Tony Vaclavicek.
Advertisements

SHIP CONSTRUCTION Group C Basujit Chakravarty Harsh Thakkar
PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 1 Load Out of Jacket 19C Offshore Facilities Load Out of T.D.A.D.
Edit this text for your title
SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY.
Teacher Enrichment Program: Bite of Science March 18, 2013 McDermott Engineering, LLC © 2013 McDermott International, Inc. All rights reserved. Jillian.
The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Impact of Increased Modularization New Orleans, 27 October 2011 Guus Stigter.
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
Vedam VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD , Acropolis, Military Road, Marol, Andheri (E), Mumbai-59, INDIA ,
Waking the sleeping giant 1 Johan A Johansen, VP Operations, Statoil Aberdeen.
Maritime Business & Technology Summit Very Large Floating Platforms November 2011.
CHS PROBLEM SOLVING
Using Simple Machines to do Work More Easy Devices that allow us to perform the same amount of work more easily.
OCEN 201 Introduction to Ocean & Coastal Engineering Offshore Structures Jun Zhang
STABILITY PROBLEMS NO. 1.
Why Things Float D. Crowley, 2007.
Boats have always been important to Alabama. From canoes to river barges, boats are big business in Alabama!
Glue this to page 41 in your SCIENCE NOTEBOOK!
Water Transportation  Introduction to Boat challenge project: –Name 4 classes of water vessels –Describe the difference between a displacement style.
Bridge Engineering (4) Foundations – Caisson Foundations 1. *Caisson foundations 1.1 IntroductionIntroduction A caisson is basically a structure.
NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE.
BUOYANT FORCE LESSON 2. Buoyant Forces and Liquid Buoyant Force is an upward force which acts on an object that is being completely or partially immersed.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
1. A simple beam bridge is a rigid horizontal structure supported by two ends called abutments. Beam bridges can span up to 500 meters in length. Most.
INSTALLATION OF TOPSIDE USING FLOATOVER METHOD
Overview of SURF Systems & Analysis
External Tank Arrives by Barge from MS. Vertical Assembly Building External Tank.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
Floating Offshore Wind Turbines Floating Offshore Wind Turbines An Aeromechanic Study on the Performance, Loading, and the Near Wake Characteristics of.
Levers Simple Machines. Levers are used to help lift heavy objects.
PHASE 7 FACILITIES ENGINEERING
1 Heavy Lift handling in Shanghai On Mar. 19 th, 2014 GSL refreshed our Heaviest Cargo Record! Cargo dimension and weight: 2 pieces each: x 5.7 x.
Bell-Ringers 11 June Bell-Ringer 1 st pd, 11 June 2009 LT: Create an equation for density. It is common knowledge that a balloon placed in a hot.
PROJECT BACKGROUND Location coordinate :
 the simplest device that performs work.  classified as: lever, pulley, wheel and axle, inclined plane, wedge, and screw.
Science Balancing a can By Tito. Aim To balance a can on its rim. Apiarist 3 cans 3 cans 100 ml of water 100 ml of water.
Storage Activities Nov Preparation for transportation of Turbines 2.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
Tommy Nguyen 5/30/09.  The wheel is located in Falkirk, Scotland.  It is a rotating boat lift that moves boats from the Forth and Clyde Canal to the.
What’s the future of decommissioning globally?
Get Great Deals when Purchasing an Electric Boat Lifts
Module Three Lifting with 60 inch Pry Bars and Cribbing.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Order of Pond Succession
Lesson IV: How a Sailboat Works: Hull Type
OFFSHORE CONSTRUCTION
Making Your ROV Buoyant
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
INSTRUCTOR © 2017, John R. Fanchi
Maritime Transport.
SHUTTLE PROCESSING DISCOVER --- DISCOVERY
التدريب الرياضى إعداد الدكتور طارق صلاح.
Ms. Sulik.
Lesson IV: How a Sailboat Works: Hull Type
By: Mey Rina Surya A.
Arrivals09:41 Please do not leave your baggage unattended.
MEXICO THLG member since 2015
Introducing the Torquer HALO
Project activities for 2015
WCR ROAD COMMITTEE REPORT – Skip Porter

Online Pogo Game Customer Service
Pogo Game Customer Care Helpline Number

What are balanced & unbalanced Forces??
Call Pogo Contact Phone Number and Enjoy Pogo Game

Presentation transcript:

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER

JACKET LOADS OUT ONTO THE BARGE

BARGE DEBALLASTS

BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE ARRIVES

BALLASTING

BALLASTING

BALLASTING

PRELAUNCH POSITION 2.5 0

JACKET MOVES INTO THE WATER

JACKET MOVES INTO THE WATER

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

TILT BEAM ROTATES UP

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method

JACKET LAUNCHED AND LOCATED

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TOPSIDE LOAD-OUT

DEBALLASTING

DEBALLASTING

DEBALLASTING

DEBALLASTING

DEBALLASTING

DEPARTURE

DEPARTURE

DEPARTURE

DEPARTURE

BARGE LOCATES IN THE JACKET STRUCTURE

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BALLASTING

BARGE MOVES OUT

BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method PLATFORM IS LOCATED