RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.

Slides:



Advertisements
Similar presentations
Waukesha Cherry-Burrell
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Installation. Indoor Unit Installation Typical Installation.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
Vacuum system.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden STFC Daresbury Laboratory ESS TAC, Lund, 15 th October 2015.
C-shaped steel beam pulley cable pulley lifting and installation work status.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Project Management Paul Aden. UK Time Line Initial discussions in September 2013, IVC in Paris UK IKC Funding announced in 2014 Vacuum Test Facilities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LWU Design Overview Paul Aden. BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 Linac Warm Units –52 Beam pipe modules.
Beam Transport Modules Preliminary Design Review (WP12) Dr Paul Aden Project Manager ESS PDR, Lund, 10 th November 2015.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden, STFC Daresbury Laboratory ESS Beam Diagnostics Forum, Lund, 11 th February.
Plan for the installation of the TAMU screen
Mathieu, Gabriel, Max, Spyros, Guillaume
EBTF Design Review Technical Meeting Group
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Undulator System Installation
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
IMP Cryomodule Assembly and Alignment
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Undulator Vacuum System
Cryomodule Assembly Plan
Undulator Vacuum System
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
Presentation transcript:

RAMI Paul Aden

RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have 10+ Years operation Possible failures: Gaskets, Bellows, Pumps, BPM’s and Burst Disks (Solution – Replace) Availability List of all of the component suppliers provided Suggested spares list (Gaskets, Bellows, Pumps and Burst Disks)

RAMI Analysis Maintainability and Inspectability Open support design allows all-round access for inspection Instruments are easily accessible Majority of components visible ‘Duck-under’ support

RAMI Analysis Aluminium slotted girder BPM on entrance or exit Semi–kinematic girder adjustment Pedestal s Quadrupole Magnets Fiducials, laser tracker alignment -50µm Accuracy Built in lifting points Low Particulate Chamber - ISO 5 or better

RAMI Analysis Girder (Aluminium) Kinematic adjusters (Phosphor Bronze) Pedestals (Steel 43A) Quadrupole Magnets Skid plates (Aluminium C25) General fasteners (Steel) Chamber (St. Steel 316L) Materials: Kinematic vee (St. Steel 304) Pusher blocks (Aluminium 6082) Base plates (Aluminium C250) Kinematic adjusters (Phosphor Bronze) Thrust screws (Steel + Delrin pad) Slot screws (Brass) Gaskets (OFHC Copper) Bellows (St. Steel 316) BPM (St. Steel 316L)

Beam Pipe Modules Pipe Adjustment Pumping Ports ISO 5 Low particulate Chamber

Beam Pipe Modules Aluminium C250 Chamber (St. Steel 316L) Gaskets (OFHC Copper) Girder (Aluminium)

Main Item List Main Chamber Bellows Assembly BPM Integration Particulate cleaning System Support Girder Pedestal frame Kinematic mounting for girder - type 1 Kinematic mounting for girder - type 2 Kinematic lock nut Washer Bolts Nuts Floor Plate Beam Adjustment Kinematic Adjuster - type 1 Kinematic Adjuster - type 2 M24 Fine Pitch Notch Nut Beam Support Plate Adjusting Plate Adjuster Block Clamp Washer Mount Cone Mount Vee Mount Flat Clamping Nuts Clamping Washers Vacuum measurement and Control Penning Gauge / IMG Thermo Couple / Pirani Gauge Penning Gauge controller / IMG Penning Gauge Cable TC / Pirani Gauge control TC / Pirani Gauge Cable Pumping Systems Ion Pump - 75l/s + Controller Pump Controller Pump Cables Valves VAT S54 Right Angled valves DN40 DN10 Venting valve - debate Soft Start Pumping/Vent Flanges, Connections & fittings Various Blanks Various Gaskets Misc Electrical Termination Mounts Electrical Tray Work Fasteners nuts & bolts

Additional Item List Misc Cleaning a consumables Vacuum testing consumables Shipping and Transport Costs Shipping Crates Shipping Packing/Mounts Shock Watch Transportation Crate Identification Test Equipment Vacuum Pumps Vacuum Gauges Test racks Pump Controllers Gauge Controllers

Thank You