Console Status Erik Gottschalk
Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve signal Network and VGA cables - installed PCs - purchase order for remaining 5 placed today (delivery in 1 week) Monitors - installed Video cards - 50% shipment arrives today and 50% tomorrow or Monday Projectors - one installed, purchase req. for 4 in process Server at FCC - installed and operational (hardware failure being investigated) Web server - operational Polycom V500 - used at CDF, Elliott is investigating purchase of 4 for consoles 1-East installation - ??? Telephones - cabling installed, need phones Video matrix switching - on hold until PCs are operational Mac Pro for Outreach - needs to be installed Apple TV - purchase order placed Tuesday, shipment in February Status displays - need a hardware plan for “outside” status displays VRVS PC - waiting for Windows Vista Webcam enclosure for exterior - need installation plan for Prevessin VGA2WEB devices - on hold until PCs are operational
12-1 4x4 Polycom 1 East ? ? VGA2WEB Each console has: 2 console PCs 1 fixed-display PC 1 Polycom V500 (??) 1 projector (1280x768) 1 VGA2WEB device
12-1 4x4 Polycom 1 East ? ? VGA2WEB CMS #1 CMS #2 LHC #2 LHC #1 #1 consoles - “assigned” to CMS and LHC #2 consoles - CMS and LHC have priority when requested Storefront to cafeteria
Proposal for Resources Resources: 4 consoles –#1 consoles, which are “assigned” to CMS and LHC, can be reserved by submitting a rudimentary 30-day (?) plan with types of activities and rough time estimates –#2 consoles, for which CMS and LHC have “priority,” can be reserved by submitting a more detailed plan that might involve making reservations (MeetingMaker) 1 conference room (1-East) –Directorate has the highest priority –Priority goes to the group (CMS or LHC) that is using the Remote Operations Center most actively, but this will still require making a reservation (MeetingMaker) –Third priority assigned to outreach activities –Room will also be available for users, but recurring meetings will not be scheduled.
Proposal for Resources CWG, LWG, and OWG should submit a 30-day plan (??) by next Thursday (Jan. 25), 5:00 pm –Approximate starting date: Feb. 1 –Rough idea of when the room will be used, and for what purpose (include dates and times, if known) To reserve 1-East (proposal!): – - –Cathryn Laue - x3201 –Cindy Kennedy - x6656 CWG, LWG, and OWG should submit a list of names for people who need access to the Ops. Center, by next Thursday (Jan. 25), 5:00 pm