Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve.

Slides:



Advertisements
Similar presentations
June 2, 2014 Using classroom based Audio Visual technology A guide to Classroom AV and its services.
Advertisements

Introduction for University Staff
Introduction for University Staff CiCS welcomes you to the University of Sheffield 12/06/2014Allan Wright © The University of Sheffield 1.
Future Lifestyle Integrated with Speech Recognition 沈育德.
Using Telemedicine Equipment. Overview The ‘Big’ Picture The ‘Bigger’ Picture Equipment Setting Up A Video Conference Conducting A Video Conference Common.
Consoles and Hardware Status Erik Gottschalk. Overview Consoles will be installed Dec. 19 & 20 Network installation will begin Dec. 11 Installation of.
CRC Technology Training November Help and How-To.
MCS Media Center Control System Sinew Technology Co., Ltd.
1223 North Glenville Dr. Richardson, TX P: F: The Value-Priced Leader Now Offers Web-Control Confer III.
HD Surveillance System v3.0 March Centralized Management System (CMS)
Multiple Conference Presentation System Nowadays the multimedia devices and projectors are must- have in the conference rooms. The Multiple Conference.
Introduction Lecture 1 CSCI 1405, CSCI 1301 Introduction to Computer Science Fall 2009.
8-Port Combo KVM Over IP Switch IKVM / 15  Product Benefits  Product Overview  Product Features  Applications  Comparison Presentation Outline.
Technology in Roundup Public Schools Approximately 50 to 60 total computers and 30 printers in the District 20 iMac Plus--High School.
Screen Snapshot Service Kurt Biery LAFS Meeting, 08-May-2007.
L. Taylor 2 March CMS Centres Worldwide See paper (attached to agenda) “How to create a CMS My Institute” which addresses the questions:
1 Report from Fermilab to the CSMM Working Group Meeting 2/12/2004 Sheila Cisko and Al Thomas.
Technology UAA. Who We Are & What We Do IT Services provides technology leadership, planning, and a wide range of services supporting UAA’s.
Videoconference Room Design & Support Requests for videoconference room upgrades or design come thru VCC (S. Cisko), who then submits work requests into.
Week #10 Objectives: Remote Access and Mobile Computing Configure Mobile Computer and Device Settings Configure Remote Desktop and Remote Assistance for.
Download & Play E-Learning System PROPOSAL draft1.0.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
Upgrading and Expanding Portable Computers. Expansion ports are common on notebooks, which allow the user to add external devices to the computer.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
EWU Telecommunications ( EWU Telephone Systems Upgrade What This Project Does For You…
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
Brochure: Lucas Taylor CHEP 2009, Prague1CMS Centres Worldwide : A New Collaborative.
DECS Community IT DIVISION OF ENGINEERING COMPUTING SERVICES Michigan State University College of Engineering.
Computer Services Overview. Computer Services Offices Main Office: D ‐ 127 Phone: 652 ‐ 4335 Hours: 8:30 am to 5:00 pm Monday ‐ Friday Academic Computer.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
SmartClassrooms A SmartClassroom is a general assignment classroom (GAC) containing technology to enhance and assist in instruction.
WebCCTV 1 Quadrox WebCCTV Network Video Recording Reseller Training Quadrox January 2006.
Chapter 7 Networks and the Internet Networks Sharing resources among multiple computers (workstations) Local Area Networks Wide Area Networks.
Colin LaiComputer Service Center1 Computer Hardware & Software Purchase & Services Speaker: Colin Lai.
Videoconference at CERN Joao Fernandes CERN-IT-UDS Video Services.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
XP Practical PC, 3e Chapter 7 1 Connecting to the Internet.
WINDOWS 8.1 WINDOWS 8.1 RT INTERNET EXPLORER 11 Is this the time for me?
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Videoconf Support Sheila Cisko 6/17/2008.
Informational Update Student Success Fee Funded Project Status Emerging Technologies & Instructional Technologies Committees IT Governance Executive Committee.
Doc.: IEEE c Submission Philips May, 2006 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
You have just scheduled an appointment with Margaret Smith, a client, for Thursday, February 19 th at noon. It is currently February 12 th.
Chapter 3.  Upon completion of this chapter, you should be able to:  Select and install network cards to meet network connection requirements  Connect.
Emerging Technologies and Applications Josh Baron Associate Director for Instructional Technology Center for Improved Engineering and Science Education.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Doc:IEEE /0150r0 Submission May 2000 Carlos Rios, 3Com Proposed Application: Wireless Home Networks.
CSE 1340 Introduction to Computing Concepts Class 1 ~ Intro.
Computer Networks – the basics Week 1 Lesson 1. In this project, you will be learning about the computer networks which we use every day – when we log.
Thobani Shaba COSC 101.  What is an Operating System  What is iOS?  History  Features  iOS Jailbreaking  Conclusion.
PCs ENVIRONMENT and PERIPHERALS Lecture 4. An expansion cards: - An expansion card (expansion board) is an electronic circuit board that adds more functionality.
University Technology Fee Advisory Board Funding Request April 13, 2010 Colorado State University Libraries.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
Proctor Caching Overview. 2 Proctor Caching Diagram.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
Visit to CERN/CMS Jan 2006 Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank.
Computing and Communications Services Office 1 CCSO Instructional Sites Randy Cetin Computing and Communications Services Office Assistant Director, Systems.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Tiina Wickstroem University of Wisconsin (US) ATLAS.
University Technology Fee Advisory Board
State of Technology at MSJC
State of Technology at MSJC
Erik Gottschalk for Jean Slaughter
Update Erik Gottschalk.
FY09 Tactical Plan Status Report for Site Networking
Connecting to the Internet
Computer Technology Notes #4
State Purchasing Purchasing Directors’ Meeting January 13, 2005
Principles of Information Technology
Presentation transcript:

Console Status Erik Gottschalk

Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve signal Network and VGA cables - installed PCs - purchase order for remaining 5 placed today (delivery in 1 week) Monitors - installed Video cards - 50% shipment arrives today and 50% tomorrow or Monday Projectors - one installed, purchase req. for 4 in process Server at FCC - installed and operational (hardware failure being investigated) Web server - operational Polycom V500 - used at CDF, Elliott is investigating purchase of 4 for consoles 1-East installation - ??? Telephones - cabling installed, need phones Video matrix switching - on hold until PCs are operational Mac Pro for Outreach - needs to be installed Apple TV - purchase order placed Tuesday, shipment in February Status displays - need a hardware plan for “outside” status displays VRVS PC - waiting for Windows Vista Webcam enclosure for exterior - need installation plan for Prevessin VGA2WEB devices - on hold until PCs are operational

12-1 4x4 Polycom 1 East ? ? VGA2WEB Each console has: 2 console PCs 1 fixed-display PC 1 Polycom V500 (??) 1 projector (1280x768) 1 VGA2WEB device

12-1 4x4 Polycom 1 East ? ? VGA2WEB CMS #1 CMS #2 LHC #2 LHC #1 #1 consoles - “assigned” to CMS and LHC #2 consoles - CMS and LHC have priority when requested Storefront to cafeteria

Proposal for Resources Resources: 4 consoles –#1 consoles, which are “assigned” to CMS and LHC, can be reserved by submitting a rudimentary 30-day (?) plan with types of activities and rough time estimates –#2 consoles, for which CMS and LHC have “priority,” can be reserved by submitting a more detailed plan that might involve making reservations (MeetingMaker) 1 conference room (1-East) –Directorate has the highest priority –Priority goes to the group (CMS or LHC) that is using the Remote Operations Center most actively, but this will still require making a reservation (MeetingMaker) –Third priority assigned to outreach activities –Room will also be available for users, but recurring meetings will not be scheduled.

Proposal for Resources CWG, LWG, and OWG should submit a 30-day plan (??) by next Thursday (Jan. 25), 5:00 pm –Approximate starting date: Feb. 1 –Rough idea of when the room will be used, and for what purpose (include dates and times, if known) To reserve 1-East (proposal!): – - –Cathryn Laue - x3201 –Cindy Kennedy - x6656 CWG, LWG, and OWG should submit a list of names for people who need access to the Ops. Center, by next Thursday (Jan. 25), 5:00 pm