MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

Thailand water management policy: Case of the Mekong River Basin
Dr Jim Briggs Masterliness Not got an MSc myself; BA DPhil; been teaching masters students for 18 years.
Hydrogen Production Decisions: Decision Making in View of Differing Stakeholder Preferences Elvin Yuzugullu Doctoral Candidate The George Washington University.
Conclusions, planning and prospects Follow-up committee meeting 6 October, Leuven.
1 Enviromatics Decision support systems Decision support systems Вонр. проф. д-р Александар Маркоски Технички факултет – Битола 2008 год.
Strategic Project Alignment With Team Expert Choice
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
1 Evaluation. 2 Evaluating The Organization Effective evaluation begins at the organizational level. It starts with a strategic plan that has been carefully.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING
Evaluation: A Necessity for the Profession, an Essential Support for Practitioners Linking Intervention with Outcome Bryan Hiebert University of Victoria.
Advanced Business Communication Spring Advanced Business Communication Spring 2012 Introduction Our last project for the class is a recommendation.
There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Using the DSF to assess scenarios Some things it will do for you - and some things it won’t.
Ranking NZ river values – application of the River Values Assessment System (RiVAS) Ken Hughey and Mary-Anne Baker
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
LEVEL 3 I can identify differences and similarities or changes in different scientific ideas. I can suggest solutions to problems and build models to.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
An overview of multi-criteria analysis techniques The main role of the techniques is to deal with the difficulties that human decision-makers have been.
Close Reading Intermediate 2. Time The Close Reading exam paper lasts for one hour. (Date and time for 2011: Friday 13 May, 1.00pm to 2.00pm.) NAB: Friday.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
WUP-FIN2 socio - economic and policy analysis WUP-FIN2 Introductory Training – Bangkok MARKO KESKINEN & OLLI VARIS.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
Resource allocation and optimisation model RAOM October 2003.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Guide to Options Comparison Revision of the SAFEGROUNDS Guidance James Penfold, Quintessa SAFESPUR, 4 October 2007.
This was developed as part of the Scottish Government’s Better Community Engagement Programme.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
Biodiversity Health Index Main Streams for Life John MacKinnon UNDP consultant June 2012.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
URBAN STREAM REHABILITATION. The URBEM Framework.
/0604 © Business & Legal Reports, Inc. BLR’s Training Presentations Effective Decision-Making Strategies.
Model Calibration and Weighting Avoid areas of… High Housing Density Far from Roads In or Near Sensitive Areas High Visual Exposure …what is “high” housing.
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 The Art of Scenario Evaluation.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
December 2003, Napakuang, Lao PDR Module 3 Scenario-Based Planning for the Mekong Basin Toward a Basin Development Strategy, Lao PDR.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
44222: Information Systems Development
Module 6 Using Indicators to Measure Progress and Performance.
Water Use Planning Siobhan Jackson BC Hydro Generation November 3, 2004 CEATI Water Management Workshop, Vancouver BC Translating Sustainability Theory.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
The following principles must be kept in mind while formulating models.  PRINCIPLE OF SIMPLICITY Mathematicians are of the habit of making complex models.
Development of Gender Sensitive M&E: Tools and Strategies.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
URBAN STREAM REHABILITATION. The URBEM Framework.
Analysis Manager Training Module
Management & Planning Tools
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 7. Managers’ and stakeholders’ information needs.
URBAN STREAM REHABILITATION
Evaluation in the GEF and Training Module on Terminal Evaluations
Quality Risk Management ICH Q9 Frequently Asked Questions (FAQ)
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Multicriteria Decision Making
13. Steps 3.1 & 3.2 Develop objectives, indicators and benchmarks
Water Directors meeting Warsaw, 8-9 December 2011
Chapter 12 Analyzing Semistructured Decision Support Systems
Concept paper on the assessment of WFD River Basin Management Plans
Presentation transcript:

MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December 2003 Formulating Indicators for Assessing Scenarios

A process for this part of basin planning DEVELOPING INDICATORS A process for this part of basin planning

Summary of steps needed to prepare for assessment of scenarios DEVELOPING INDICATORS Summary of steps needed to prepare for assessment of scenarios Derive BDP Development Objectives (derived from 95 Agreement) Select Assessment Criteria (Tests of how well scenarios will meet objectives) Select Indicators (Measurements to be used in assessment tests)

Step 1 - Defining development objectives DEVELOPING INDICATORS Step 1 - Defining development objectives First and foremost: Objectives must be derived from the Basin Agreement. This is the mandate of the Mekong River Commission. But the objectives in the Agreement are broad and not easy to quantify. An agreed set of more precise and/or detailed BDP development objectives needs to be developed through consultative processes. These derived development objectives should cover all aspects of each of the objectives (whether explicit or implicit) of the Agreement.

Example of BDP Development Objective DEVELOPING INDICATORS Example of BDP Development Objective Start point: Chap III of Agreement - Objectives and Principles of Cooperation. For example: Article 3. Protection of the Environment and Ecological Balance Suggested BDP Development Objectives derived from Article 3 could include: “To achieve and maintain acceptable water quality in the Mekong River” “To maintain fisheries production.” and so on...

Step 2 - Select Assessment Criteria DEVELOPING INDICATORS Step 2 - Select Assessment Criteria Assessment criteria are the tests (for achievement of objectives) to be applied to the anticipated outcome of development scenarios. At least one such criterion (or test) is needed per BDP Development Objective. The tests (criteria) should preferably be capable of being measured in a quantifiable manner and linked to water flow regime. Selection of the criteria should be done in a consultative way - especially with relevant experts (MRC programs + expert line agencies)

Example of Assessment Criteria DEVELOPING INDICATORS Example of Assessment Criteria For the objective “To maintain fisheries production” some criteria could be: Changes in dry season flow regime Changes in wet season flood flows Changes in selected flooded areas Changes in connectivity for fish migration These are examples of factors that support or affect fisheries production. Note that they have all been related back to flow. Expert advice is needed for this.

Step 3 - Selection of Indicators DEVELOPING INDICATORS Step 3 - Selection of Indicators Indicators are the specific measurements to be used as part of the assessment tests. At least one indicator is needed per criterion. To the maximum extent possible the indicators should be capable of being generated by the DSF - either as direct numerical output or as spatial data for interpretation. Again, the indicators should be selected in a consultative way - especially with relevant experts (MRC programs + expert line agencies) - and with modellers.

Examples of Indicators DEVELOPING INDICATORS Examples of Indicators For the fisheries maintenance assessment criterion “Changes in wet season flood flows”, possible indicators are: Annual flood frequency (of selected flood sizes) Rate of rise of wet season flood Rate of fall of wet season flood Note these are all numerical indicators and can be computed through DSF simulations.

Assessment - It is done by TEAMWORK DEVELOPING INDICATORS Assessment - It is done by TEAMWORK Derive BDP Development Objectives (derived from 95 Agreement) Select Assessment Criteria (Tests of how well scenarios will meet objectives) Select Indicators (Measurements to be used in assessment tests) BDP Team (MRCS + NMCs) BDP Team + Experts BDP Team + Experts + Modellers

Some ideas for shortcuts DEVELOPING INDICATORS Some ideas for shortcuts MRC has done a lot of work already. Capitalise on it! For example: Transboundary issues are thoroughly identified and listed. Good start point to derive indicators. WUP has already prepared a comprehensive list of suggested indicators. See DFR 640 Technical Reference Report: Impact Analysis Tools. Start with these. Vital to take a structured approach, with all steps documented.

Building on work already done DEVELOPING INDICATORS Building on work already done 1995 Agreement Transb’d’y Issues WUP suggested indicators Anything else you can find Agreed Indicators

A Structured Format DEVELOPING INDICATORS A Structured Format Any format will do. Important thing is to have one.

Finding out if the indicators work DEVELOPING INDICATORS Finding out if the indicators work The only method is to actually apply the indicators to some scenario outcomes generated by the DSF, or otherwise. Revise them and repeat. An adaptive, iterative process. Ask the questions: Do we have the minimum set of indicators? Are any redundant? Are any not sensitive enough to show variations? - even when we ‘know’ there must be change. Have we missed any vital indicators? (Go back to experts with results and check that they are satisfied their issues are being assessed.)

MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December 2003 Multi-criteria Analysis for Ranking Development Scenarios

Scenario-Based Planning - How do we do this bit? MULTI-CRITERIA ANALYSIS Scenario-Based Planning - How do we do this bit?

The need for MCA MULTI-CRITERIA ANALYSIS The need for MCA The ideal situation is to be able to measure the outcomes of alternative developments in the same units such as dollars. Comparison is then a simple numerical exercise. And in such a situation it doe not matter that for any particular scenario it may meet some criteria extremely well, and others extremely poorly. The alternative developments can simply be optimised to maximise net dollar outcomes. However, work already done on outcome indicators shows that this ideal will rarely occur in practice.

Example of simulation results MULTI-CRITERIA ANALYSIS Example of simulation results Which scenario is best?

Some questions MULTI-CRITERIA ANALYSIS Some questions Are all criteria of equal importance? Who says so? Who are the decision makers? Should the evaluation be passed over to the community or kept for ‘professionals’ to do? Some indicators do not show much change between scenarios - should they be dropped from the analysis? Is there some other indicator(s) that might be of more help in the scenario evaluation? etc

Some answers MULTI-CRITERIA ANALYSIS Some answers Experience shows that stakeholders need to be involved if the evaluation is to have credibility. (At basin level this can be high level and broad) A structured process is the only successful approach to dealing with complexity. At the same time, every effort should be made to have the absolute minimum complexity. There are a number of recognised methodologies and proprietary MCA software available. However, it is important to remember that the decisions will be socio-political, not technical.

Some Structured Approaches MULTI-CRITERIA ANALYSIS Some Structured Approaches Criteria weighting. This requires joint discussions by stakeholders and ‘experts’ to agree on weighting. Numerical techniques can then be used to score the scenarios. DELPHI - a way of combining expert/informed opinions (not especially useful in scenario evaluation, but can help develop weightings) AHP (Analytical Hierarchy Process) - one of many pair-wise preference processes - plenty of software available. etc

Which is the best approach? MULTI-CRITERIA ANALYSIS Which is the best approach? In basin planning, MDBC experience is that the outcomes of any unclear or partially invisible process will frequently be rejected by the stakeholders (and community). MDBC and its member States tend not to use MCA software - both for the above reason, and because none seems to work very well for the complex systems of basin natural resources. (Research into MCA continues however.) Instead, the common approach is to use stakeholder reference panels and an independent facilitator to work towards consensus.

Evaluating Development Choices Scenarios, Indicators, MCA and all that. Thank you GOOD LUCK! Questions?