Accommodation Jack up - HAVEN SPECIFICATIONS General 4-leged self-elevating multi-purpose unit built for the North Sea hash environment with highest safety.

Slides:



Advertisements
Similar presentations
Offshore Technical Integrity Safety Critical Elements and Performance Standards Tony Vaclavicek.
Advertisements

Electrical & Instrument Construction Department
Pulleys in Everyday Life
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
© ABB Group May 1, 2015 | Slide 1 Large scale integration of Offshore Wind Power Design Considerations Peter Sandeberg /ABB, EOW 2009,
Boat Diving and the Divemaster. Objectives State at least five considerations for the selection of a boat for diving activities. State four recommended.
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
General Arrangement Plan
Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY.
Crane Operations Objective
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
GENERAL SPECIFICATION INTRODUCTION 1.INTRODUCTION 1.1General Service *The “300ft S.E.U.” is a jack-up self-elevation unit designed as a drilling and repairing.
Walking-Working Surfaces and Fall Protection MODULE 9.
Ship-Type Operations UNITAS ISM Code Training Material.
Ship-Type Operations UNITAS ISM Code Training Material.
HMT 1C 24-1 u Chapter 24 –Fixed Facility Incident Consideration Haz Mat Incident Considerations.
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Copyright Coast Guard Auxiliary Association, Inc.
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
QUALITY ENERGY SERVICES Liftboat & Marine Services Your Well Productivity is Our Priority Global Lift 2.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
MSHA MINE EMERGENCY OPERATIONS MSHA has three mine rescue stations. Each station has different response vehicles. The stations are: 1) Pittsburgh National.
Petroleum Production Fire Suppression
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
New German Deep-Sea Research Vessel (replacement SONNE) scientific-technical requirements Klaus von Bröckel, ERVO, May 2009 one of many artists views !
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
CANADIAN COAST GUARD AUXILIARY - PACIFIC APPROACHING A VESSEL ON FIRE CANADIAN COAST GUARD AUXILIARY - PACIFIC January 2012.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
© North Slope Training Cooperative—revised All rights reserved Course Number NSTC-30 Revised Offshore Safety Awareness.
Ancillary Services UNIT 10.
HERNIS Control Systems
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
PRODUCTION OPERATIONS AND MAINTENANCE
非常感谢中国海事界同事对我们支持 A Guide to The Vetting Process We thank All our Colleagues in the Maritime Industry in China for their Support Capt Howard Snaith – Marine.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Flood Response Boat System Available from. A System … Not Just a Boat Patented QuickFIT Railing System Unlimited Boats to Connect Together Bow to Stern.
INTERTANKO Technical Seminar Mumbai 19 th September 2005 Ship Inspections & The Screening Process Capt Howard N. Snaith. Master Mariner. M.N.I. Director,
PHASE 7 FACILITIES ENGINEERING
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.4 Gangways and Signs Susan Harwood Grant Number SH F-23.
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Data Center Facility & Services Overview. Data Center Facility.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
IES ZENITH PHOTOGRAPHS 31st Jan 2016.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
These ships are striking and quite intriguing; inspired by and designed to resemble the turn of the century coastal vessels that used to ply the east.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Group Structure Ferguson Group Worldwide Our Vision To be the global leader in the provision of container and accommodation solutions.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Planned Maintenance 1. locations of maintenance EngineDeckCateringNavigation Life safety appliances.
West Cambridge Data Centre Ian Tasker Information Services.
Brokered by Scruton Marine Services 1 PV2250 $299,000 USD.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Learning Engagement tool (LET)
KS ORIENT STAR-2 Distinct Advantages Hull No: N408 Shipyard: COSCO
M2 OFFSHORE WIRELINE UNIT
Highveld Industrial Park Workshop No. 5 Information Memorandum
USCG Roles & Responsibilities During a Ship Fire
KING ARTHUR 4500 m3 Ethylene Carrier 02/12/2018.
Firefighting equipment
MT ASSA – Register number 2305
Emergency Response on FPSO
Presentation transcript:

Accommodation Jack up - HAVEN SPECIFICATIONS General 4-leged self-elevating multi-purpose unit built for the North Sea hash environment with highest safety specs, currently outfitted as a top of the line Offshore Hotel. Strong deck structure and oversized jacking system allows for possible re-configuration with large and heavy client modules replacing some hotel-capacity. Raised bow and offshore barge hull allows wide weather windows for mobilisation/rig move. Owner and management Owner: Master Marine AS Technical Management:OSM Offshore AS Classification and Rules Type: Self-elevating accommodation unit Built: 2011 Dry Docks World Graha/Nymo Eydehavn Class: DNV Notation:+1A1 Self-Elevating Accommodation Unit E0 NON-SELFPROPELLED Flag: Cyprus Safety Case “Acknowledgment of Compliance”, by Norwegian Petroleum and Safety Authorit y Accommodation Data Max POB477 Cabin beds:447 Single cabins:443 Double cabins: 2 Facilities Data: Office places 64 for charterer Conference rooms3 for charterer Main Dimensions & Data Hull Length p.p: 108.6m Length overall: 117.6m Width overall: 50m Hull depth: 9m Main deck area: 2500 m2 (Gross, 450 m2 available net with ALQ and Office module attached) Deck load capacity: 8100 T (Gross, 4500 T available net with ALQ and Office module attached) Distance between legs: Longitudinal: 64.8m Transverse: 34.5m Legs Number/ Type: CJ50 Width: 12m (triangular x -brace) Length: 130m leg + 7m spudcan (legs can be extended to allow deeper operational depths) Footing area: 346m2 Footing type: Circular with 1,9m skirts Jacking system: Make/type:NOV/BLM D110-L Gears:48 double units (96 pinions) Jacking speed:0,45m/min Helideck Diameter D-value: 21m Helideck size (1.25xD)26.1 m Helideck shapeOctagonal Helicopter: Sikorsky S92 (12.8T) or equivalent Refueling facilities: Fueling system with capacity of liter Jet fuel for providing the Helicopter in shuttle Cranes 1x Liebherr BOS EX Litronic Offshore crane. -1 whip hoist with man riding. Max. lifting capacity: 15 T, Max. lifting radius: 51 m -One main hook 25/75 T (1 fall/3 fall). Max. lifting capacity: 75 T, Max. lifting radius: 46 m -Offshore lifts, Hs up to 6,0 m HS Marine Knuckle Boom Marine Crane AKB 190/18/3 -Lifting capacity Max. 4,9 MT at 18 m for onboard lifts Safety Systems  Redundant Public Address and General Alarm (PAGA) and Global Maritime Distress and Safety (GMDSS) systems. The PAGA system can be connected and integrated in host platform via fiber optical cable.  Fire & Gas detection system (F&G) monitoring presence of flammable gases, fires and smoke by detectors located over the entire installation. F&G is designed to initiate shutdown actions, release fixed fire fighting systems, alert personnel and isolate ignition sources based on a “2 out of N” voting.  Emergency Shutdown system (ESD) is based on three levels: Abandon Platform Shut Down (APS), ESD High, ESD Low.  EX –proof deck equipment  Active fire protection systems are installed based on the Fire and Explosion Strategy.  The helideck have a DIFF system (Deck Integrated Fire Fighting) for efficient fire fighting.  One off Nadiro boat in box system for a Fassmer FFR 6.5 fast Resque Boat for up to 8 pers. Evacuation systems Evacuation system is established based on the following priority: Bridge to host platform, helicopter, lifeboats, life rafts and ladders to sea in said order. -Haven has 5 davit-launched TEMPSC lifeboats adopted to Norwegian requirements. All lifeboats placed in bow and facing out from platform. Each lifeboat has a capacity of 120 persons, thus four lifeboats will cover 100% POB. -Haven is equipped with 17 davit-launched life rafts distributed over 6 life raft stations on the periphery of the vessel. Each life raft has a capacity of 29 persons of 90 kg, giving a total capacity of 492 persons (100% POB). Weather and depths Capabilities (North Sea) Can operate to 85 m depths (92 m Q2&Q3) in North Sea conditions (sustaining 10,000 year wave) with present leg lengths. Legs can be extended to cater for operational depth of abt m pending soil conditions). Accommodation 375 (of the total 445 cabins) are all with en-suite shower/toilet, telephone, TV/DVD and network connections. The remaining 70 single cabins are equally equipped but laid out so that 2 cabins chare a common shower/toilet cabinet accessible from a chaired lobby. The deck situated accommodation is modular built up by 3 modules. Thus allowing possible trading of cabins against larger deck space/increased deck available deck load. Client Facilities: The vessel contains all facilities to allow smooth operation with full accommodation of 447 persons. This includes galley and mess room facilities allowing queue-less catering. The facilities also includes ample of change rooms, recreation rooms, hospital, gym, cinema, laundry and a well-positioned dirty coffee lounge close to the bridge. The Hotel facilities also include a hotel reception area with heli-launch with double briefing rooms allowing shuttle capacity. Office facilities for client use includes 64 office spaces and 3 conference rooms. Mechanical workshop, paint storage as so forth for client use. Ample of deck space allowing large lay down area for goods & provision and deck storage for client equipment/special facilities. Vessel Facilities Gangway: Approximately 30m reach by self-deployed lifting bridge with heat shield. Equipped for transfer of el, power, water, and diesel. Water-maker: 2* 60 m3/h and 1* 80 m3/h, reverse osmosis freshwater makers. Total capacity of 200 m3/h. Power supply:690 V by 6x1590 kW + 1x1140 kW Emergency power. Also equipped for external El.supply from host via bridge in form of cabling and 13.8 kV/690V transformer rated at 4.8 kVA Diesel &Water:Hose reel station for reception of Diesel and Portable water from Supply vessel Tank Capacities Potable water: 2* 130 m3 and on at 320 m3, totally 580 m3 Water Ballast:17 different tanks with a total capacity of abt m3 Fuel Tank: 2* 840 m3. + day-tanks. Total capacity of 1790 m3