PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
Parking & Transportation Agenda Mission General PTS Information PTC Overview Major Sections of PTS Department Sun Link Streetcar Construction Update Questions.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
Chamber – December 2010 Presented by Carla Ippolito Manager, Special Projects Rapid Transit December 6, 2010 Hamilton’s Rapid Transit Initiative.
Environmental Assessment Public Meeting
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Presentation to Maxwell Place Homeowners Association 1.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Tucson Modern Streetcar Project Overview July 15, 2011.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Metropolitan Counci February 13, 2008.
Confederation Line West LRT Extension Maintenance and Storage Facility Planning and EA Study Community Information Session September 21, 2015.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole February 20, 2008.
The Hamilton Chamber Commerce’s Commitment to the LRT Project Keanin Loomis, President & CEO Hamilton City Council General Issues Committee August 11 th.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
San Diego Trolley. Current Current/future expansion Propose extension.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
McKellar Park Information Session
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Excerpts from North Loop Neighborhood Plan. The intersection of Airport Boulevard and 51st Street is seen as one of the most important in the neighborhood.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Downtown Valdosta Truck Traffic Mitigation Study
Center City Connector 101.
District 3 Complete Streets Projects
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Capital Programming Committee South Coast Rail Phase 1 Service
Streetcars, a better way to go!
Downtown Valdosta Truck Traffic Mitigation Study
Status Report on Rochester’s DMC Transportation Plan
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
I-85 Corridor Light Rail Transit Feasibility Study
M14A/D Select Bus Service
OC Streetcar Project Update
I Street Bridge Replacement Project
Presentation transcript:

PROJECT UPDATE LRT ALIGNMENT

LRT ROUTE MAP

ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops are metres apart A-line spur Shared running LRT (cars can drive over tracks) Five stops (budget permitting)

MCMASTER UNIVERSITY TO HWY 403 Centre-running LRT Two lanes of traffic in each direction Bicycle lanes(Macklin St to Cootes Dr) End-of-line terminal at McMaster University stop for GO, LRT and HSR connections LRT only bridge over Hwy 403

MCMASTER UNIVERSITY TO HWY 403

HWY 403 TO DOWNTOWN Primarily centre-running LRT Generally, one lane of traffic in each direction Loading, stopping, parking impacts Exploring side street and rear alley access Connection to A-line spur at King and James Streets International Village (John to Wellington Streets) One eastbound lane of traffic to provide access to parking and driveways on south side Westbound traffic diverts at Victoria Ave or Wellington St Side-running LRT on the north side of the street

HWY 403 TO DOWNTOWN

A-LINE SPUR – JAMES STREET NORTH LRT will not be segregated from traffic Shares the traffic lanes with vehicles, similar to a streetcar Same vehicle as the B-line Minimal parking impacts LRT runs to the West Harbour GO Station and potentially the waterfront (budget permitting)

A-LINE SPUR – JAMES STREET NORTH

WELLINGTON STREET TO QUEENSTON CIRCLE Centre-running LRT One lane of traffic in each direction Connection to stadium district Tim Hortons Field Future high school and Bernie Morelli Centre Connection to Ottawa Street business area End-of-line terminal at Queenston Circle for LRT and HSR connections New transfer hub for east Hamilton and Stoney Creek

WELLINGTON STREET TO QUEENSTON CIRCLE

ONGOING WORK Refining design Traffic impacts and modelling Ridership modelling Finalize Maintenance and Storage Facility location Environmental Assessment (EA) studies. i.e. heritage, noise and vibration Technical Advisor (TA) engineering and procurement work Finalize property impact details

FACTORS THAT COULD AFFECT ALIGNMENT Costs Stakeholder and community feedback Design work Engineering and utility impacts

NEXT STEPS Engagement and outreach BIAs Chambers of Commerce Advisory Committees Ward meetings LRT corridor outreach Environmental Assessment (EA) Addendum August 3 LRT Subcommittee update Public meetings in September