SHE Requirements for the Eskom Procurement and Supply Chain Management Process (32- 726) Nomusa Leburu.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Health and Safety - an update Ian Gillett Safety Director.
OHSAS
Environmental Management System Bruce Barnard Terry Parish Teresa Woodley.
Contractor Safety Management
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Health and Safety.
WHS Management Plans.
Health & Safety Risk Assessments.
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
Steve Jones, SHEQ Manager (Emergency & Critical Services)
The Management of Health & Safety at Work Regulations 1999
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
Occupational Health & Safety Management at IREL Units A.K.DAS G.M. (Safety & Env.) Corporate Office, Mumbai.
Equality and Diversity through Procurement Policy Nick Sullivan Head of Policy and Capability Value Wales.
SARMA SHREQ PROGRAM Development for Safer Concrete Manufacturing & Delivery RPF MAY 2007 Presented by: Nico Pienaar [Director - SARMA] Presented by: Nico.
Basics of OHSAS Occupational Health & Safety Management System
Municipal Waste Europe Jobs, Skills and Skills Needs Ian MacKenzie Policy Officer.
K RIEL C OLLIERY Anglo Coal Contractor Management.
Portfolio Committee on the Department of Police Auditor’s General perspective 2 March 2010.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
Insert Framework / Contract Name
Health and Safety Policy
Emergency Procedures Within a workplace, there should be well-defined emergency procedures. Your employer is obliged to establish these procedures, and.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
ETHICAL SOURCING IN NHSS Supplier Engagement Day Peter McConnell 21/5/13.
QUALITY MANAGEMENT STATEMENT
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Guidelines for the Organization of Practical Placements for Students (PPS) Code of Practice for Actors Gregory Makrides – European Association of Erasmus.
ISO Registration Common Areas of Nonconformances.
Contractor Health & Safety Requirements Project :GSU Transformer System Date: 16 May 2014 A Stuart SHEQ Manager – Gx Coal 2.
PS(PDP)2015/NN/07 Tender Clarification for the Construction of the New Upington Substation 19 October 2015.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
CLARIFICATION MEETING FOR PPE ACCESSORIES CORP 2902R THE SUPPLY & DELIVERY OF PPE ACCESSORIES ON AN “AS AND WHEN REQUIRED” BASIS TO ESKOM SOC LTD NATIONWIDE.
26 March 2015 Clarification meeting: Scaffolding and Insulation material.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
SHEQ presentation Date 9 July SCOPE This applies to all contractors acquiring to conduct meter reading, disconnecting and reconnection work throughout.
16 July 2014 Development of Eskom Real Estate Master Plan detailing Asset Management Solution, Property Management Solution, Procurement and Financial.
CDM Construction Design and Management
Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele.
THE PROVISION OF CATERING SERVICES FOR THE MKONDENI OFFICE COMPLEX IN THE KZN OPERATING UNIT Date: 23 OCTOBER 2015 Venue: MKONDENI Time: 11H00.
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Clarification Meeting: Drifling and Testing of boreholes and Water Reticulation design and Construction for the relocated communities at Kusile Power Station.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF LAND VALUATION SERVICES CORP March 2015.
23 Sept 2014 The supply of spare parts and special tools for five (5) peaking generation Open Cycle Gas Turbines (OCGT) units at Gourikwa Power Station.
Environmental Requirements for BENBURG SUBSTATION 3RD 250MVA 275/132KV TRANSFORMER - CIVIL WORKS.
POWER DELIVERY PROJECTS Central Grids Simmerpan - Civil works. 10 July 2015 Vusi Mthimunye.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Kusile Power Station Project Enquiry clarification meeting Kusile Power Station Project Provision of two (02) independent environmental control officers.
GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00.
04 March 2014 Request for Proposal (RFP) the provision of professional services for the Eskom Academy of Learning (EAL) Refurbishment project for a period.
Clarification Meeting : CORP 3309 FOR THE PROVISION OF CONFIGURATION MANAGEMENT SERVICES FOR A PERIOD OF FIVE (5) YEARS Auditorium 1, Eskom Enterprise.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Quality Management: Mutually beneficial supplier relationships.
CHAPTER 3 Management Systems. Learning Objectives Describe the basic business activities and tools necessary to implement successful industrial hygiene.
ISO 14001: 2004 Environmental Management Review Presentation
Quality Management Systems (QMS)
Safety Accountabilities
How to conduct Effective Stage-1 Audit
Contractor stand-down Western Region 2018
Ir. Gnana Sakaran. R MSQH Surveyor
Presentation transcript:

SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu

2 Background Information on Eskom has embarked on a drive to create and sustain a world-class culture and standardisation within Eskom Commercial Process regarding Safety, Health and the Environment. This process assists Eskom to determine whether suppliers take reasonably practicable steps to apply Safety, Health, Environment and Quality systems of work; comply with the legislative and Eskom-specific requirements32 – 418 and that is capable of addressing SHEQ adequately. As part of Eskom’s Supplier Management System, it is now a requirement for all suppliers who wish to undertake work for Eskom to undergo an occupational safety, health and environment (SHE) evaluation process.

SHE REQUIREMENTS DURING TENDER PROCESS Annexure B Annexure C 3 The acknowledgement form for Eskom rules and requirements. Level 1 documents/procedures that a Contractor/Supplier must adhere to, (e.g. incident management, smoking policy, cardinal rule/life saving rules procedure) To assess whether the supplier has the capability and capacity to manage SHE adequately for the scope of the work being tendered for. Aim to see if the supplier has any management system in place and capable of providing SHE plan and file to stations as required.

SHE REQUIREMENTS DURING TENDER PROCESS (CONT.) Costing for SHE: Provide the detailed/breakdown list of all cost items for Health and Safety. ( This is based on the overall scope of work to be performed). SHE Management System: Provide the SHE Policy Document Organogram illustrating SHE structure ( This must be converted from generic to scope of work on contract award). Incident Management process: Procedure Management of CA’s and PA’s. 4

SHE REQUIREMENTS DURING TENDER PROCESS (CONT.) SHE Communication: Provide your company communication procedure (SHE Plan). Occupational Health and Wellness: Valid letter of good standing. COID Provide the medical surveillance programme and the man-job specifications as annexures (do not submit medical reports/certificates). A process for ensuring that Safety, Health, Environmental risks are identified, documented and managed? 5

SHE REQUIREMENTS DURING TENDER PROCESS (CONT.) Appointments and Competences: Statutory appointments as reflected in the safety plan/Organogram or the intention to appoint the individuals. Details of the SHE Training Matrix. Environmental Management: Does the Company address environmental management? Company provide a method statement or EMP for scope of work? 6

SHE REQUIREMENTS DURING TENDER PROCESS (CONT.) SHE Performance: SHE Performance records for the past 3 years (fatalities, lost-time injuries, Environmental contraventions). Any SHE achievements. 7

Questions