PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Beam diagnostics in the beamlines
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Developments of the FETS Ion Source Scott Lawrie.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
MEBT status A. Shemyakin for the PXIE warm front end group PIP-II technical meeting January 20, 2015.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Beam Commissioning Adam Bartnik.
Experience with beam instrumentation at Linac4
BE-BI Software for LINAC4
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
ERL BPM System Mike Billing, Mark Palmer
Intra-Pulse Beam-Beam Scans at the NLC IP
LINAC4 commissioning plans etc.
commissioning and measurements
Linac Diagnostics Commissioning Experience
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016

Much of past year has been in the development and support of the PXIE LEBT. Now switching over to MEBT Beam Current Measurements Upstream of chopper – Long pulses - DCCT, EIDs Downstream of chopper – Short pulses - Toroid, collimator, LEBT scraper Digitizer/FPGA DAQ – waveform measurements Integrated with MPS PXIE LEBT Instrumentation Development 6/7/2016Vic Scarpine2

PXIE MEBT Instrumentation Development – Initial RFQ Commissioning 6/7/2016Vic Scarpine3

MEBT 1.1 6/7/2016Vic Scarpine4

MEBT Beam Diagnostics Status Beam current measurements –Toroids, isolated beam dump, ring pickup –Installed and Integrate into VME-based front-end – under test Beam position and phase –Warm BPMs - installed in quadrupole doublets –DAQ system running and under test Beam transverse profiles –Electrically isolated beam scrapers – two installed in MEBT –Integrate into VME-based front-end - under test –Prototype wire scanner under design Beam energy –Time-of-flight via movable BPM – installed –System under test – manual measurements made Longitudinal bunch shape –High-bandwidth Faraday Cup - > 6 GHz BW – installed –First measurement attempt yesterday 6/7/2016Vic Scarpine5

Frontend Electronics for Beam Current Measurements Toroids, Faraday cup dump, scrapers Utilize FPGA-based 8-channel, 125 MHz, 14 bit digitizer cards –Allows for pipeline or snapshot DAQ and signal processing –Only pulsed beam for initial operations – 20  sec –Upgrading to longer pulses –Initial FPGA and VME code - reuse FAST code –Integrated with MPS Need to understand noise and systematic effects –Large gain on toroids –Tight beam loss requirements for MPS –Needs further study LEBT Toroid Calib signal 1 mA, 20  s 50 mV signal 60 db gain 6/7/2016Vic Scarpine6

PXIE Electrically Isolated Pickups (EIP) MEBT EIP Update –EIPs biased (up to +100 volts) –Two scrapers (8 channels) plus SNS dump and halo fingers (5 channels) –Bias boards connected (excepted shorted scraper channel) –Signals readout thru beam current DAQ FPGA board and into ACNET –All channels calibrated – gain and offset Offset coarse correction in electronics Offset fine correction in DAQ processing – only for pulsed beam Gain correction in ACNET Investigating bias electronics damage caused by scraper short –Need to modify electronics to protect against shorts 6/7/2016Vic Scarpine7

Scraper Short Problem for Bias Electronics +40 Volts Feedback loop tries to keep op-amp negative port at same voltage as Vbias Short at scraper drives op-amp feedback current to max and burns out ½ watt resistors Change current limiting resistor to limit feedback current 6/7/2016Vic Scarpine8

PXIE Toroid Calibrations 1)Measure resistance of calibration port with ohm-meter or multi- meter 2)Instrumentation trigger is used to trigger pulse generator, oscilloscope and instrumentation crate. 3)Use pulse generator to generate calibration signal and gate sync signal (currently 20usec pulse used – could change for longer pulses) 4)Sweep calibration signal from 0mV in mV steps until toroid current reads 10-12mA (linear portion) 5)Measure voltage of input signal on oscilloscope 6)Measure toroid current on ACNET using the average current devices 7)Linear curve-fit of data is taken and used to generate new coefficients Averaging devices used to measure toroid output signal Calibration seems to be repeatable to ~ +/- 0.5% 6/7/2016Vic Scarpine9 Work to be done Investigate noise on LEBT toroid MEBT 1 toroid still reads around 1% less current than MEBT 2 toroid Investigating a more automated calibration sequence

Beam Current Devices in ACNET 6/7/2016Vic Scarpine10

Ring Pickup – Beam current for Machine Protection 11 Dedicated ring pickup to measure bunched-beam current –Wide bandwidth pickup but narrowband electronics –Simple analog circuit give rectified signal pulse Pickup installed in beamline Analog electronics completed and tested Signal measured through beam current frontend High/Low threshold for MPS Short beam pulse software installed and being tested –Software for MPS installed – under test –Eventual operation with CW beam 6/7/2016Vic Scarpine

DAQ with FPGA-based electronics for CW and pulsed beam 8 channel, 14 bit, 125 MSPS boards Analog filter & amp boards built and tested Ring bunches – No bunch-by-bunch measurements MEBT BPM Development 12 Requirements: Status: First two BPMs being installed in quads ToF BPM installed Stretched wire measurements performed Low-beta correction added Reuse frontend software Pulsed beam initially Average position, phase, intensity per pulse BPM System installed and under test Change to 250 MSPS system soon 6/7/2016Vic Scarpine

BPM Readings in ACNET 6/7/2016Vic Scarpine13 Position in microns Phase in degrees of MHz Intensity is relative intensity of MHz signal component

BPM Diagnostic Tools 6/7/2016Vic Scarpine14

Beam Energy - Time of Flight (ToF) Movable BPM Measure beam velocity (  energy) via ToF Utilize movable BPM to minimize systematics –e.g. BPM response, bunch shape effects Use HINS BPM on linear stage –~ 1” of travel; ~10  m resolution –Allows for “continuous” phase measurements –Expected MEBT energy resolution: 2.1 MeV Status: Motion stage installed and operational BPM electronics returning phase DAQ and automatic energy scan software under test Initial energy measurements made manually 156/7/2016Vic Scarpine

Buncher cavity off Manual measurement Phase from raw waveforms Energy = MeV Buncher cavity off Manual measurement Phase from BPM system Energy = MeV Preliminary RFQ Beam Energy Measurements 6/7/2016Vic Scarpine16

Bunch Length Measurements - New Fast Faraday Cup New design Embedded 50  stripline – initially designed by SNS High Bandwidth ( > 6 GHz) – need scope DAQ Beam damage at HINS (2.5 MeV protons) We redesigned with better thermal properties Limit beam to 20  s pulses and < 0.1 Hz Old model tested at HINS and Linac Prototype new design tested in PXIE LEBT Installed in PXIE MEBT – ready for testing DAQ via scope – manual operation Old design - Damage with HINS beam Linac MEBT Measurements 6/7/2016Vic Scarpine17

Initial FFC Measurements – Needs study 6/7/2016Vic Scarpine18 What’s going on here? Looks like capacitive coupling. Did we burn out stripline? Red: FFC Blue: ToF BPM Plate Linac FFC Data

Allison Scanner for MEBT Emittance Measurements Design a water cooled Allison-style MEBT emittance scanner based on LEBT scanner Gives faster phase-space measurement Reuse LEBT electronics 2.1 MeV  requires longer deflector plates  requires more beam line space Tight alignment requirements Higher beam power  no CW operation 19 Design numbers: HV plate length: 300 mm Flange-to-flange: < 450 mm HV plate separation: 6 mm Plate HV: ± 1 kV ~ ± 10 mrad angular range Status: Vacuum enclosure designed Out for bids Sensor design finished Hardware coming in Estimate August completion Matt Alvarez lead engineer 6/7/2016Vic Scarpine

MEBT Emittance Scanner 6/7/2016Vic Scarpine20

Prototype Wire Scanner Single wire scan – step transversely through beam Test in diagonal (45 o ) port of MEBT scraper Horizontal and vertical transverse profiles in one scan Can test different wire materials –Start with 50 micron tungsten-rhenium Mayling working on wire scanner design Motion stage ordered –Need to make motion test Completion date unclear - Funding limited 6/7/2016Vic Scarpine21

Prototype Wire Scanner 6/7/2016Vic Scarpine22

Prototype Wire Scanner 6/7/2016Vic Scarpine23

Prototype Wire Scanner 6/7/2016Vic Scarpine24

Prototype Wire Scanner 6/7/2016Vic Scarpine25

Summary All initial MEBT 1.1 instruments installed in beamline All instruments into ACNET readout – except FFC Integrating necessary devices into MPS Systems in commissioning phase –Need to verify operations and understand systematics 6/7/2016Vic Scarpine26

6/7/2016Vic Scarpine27