QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Manufacturing Processes Lab I, MET 1321 Inspection and Testing Welds
Canon 6000 series When taking cartridge out of the printer, make sure to seal the ink outlet with Scotch tape before refilling the ink. Step 1 Step 2 Make.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
HVAC523 Soldering.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
JET PROPULSION Part 5 Jet Engine Operation Oil Systems.
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Re-caulking a bowfront aquarium By Jackie O’Neil.
What we do and why we do it. Know how to inspect an SCBA bottle for damage prior to fill Know how to use the compressor Know how to document problems.
Packaging and Shipping Frozen Specimens using Dry Ice
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
Stencil and Photographic Silkscreen Printing For use with Lesson 6 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
1Dp230 at 5:1 dilution in TAE with 12.5mM MgCl2 - on either mica or SiOn as shown below -apply 5ul 1dp230 10nM 1:5 dilution in TAE-Mg (final 2nM) to SiOn.
Griner Drilling Service
Basic Screen Printing Procedures for T-Shirts GOP_5-2 Screen Printing.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
A buret is used to deliver solution in precisely-measured, variable volumes. Burets are used primarily for titration, to deliver one reactant until the.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Large THGEMs, uniformity and gain largely based on the paper for MPGD13 and some recently obtained results S. Levorato THGEM meeting CERN 13 Nov
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Recent progress in large THGEM production On behalf of Trieste group and Rui de Oliveira (CERN) S. Levorato RD51 mini week1.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
As discussed in the previous meeting, we upload 13 gaps in the database. 30 gaps with RE4/2 types with Batch 12 HPLs. Destroyed ~ 20 gaps to investigate.
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
Mirror Manufacturing Production from glass to mirror.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Failure Mode: CPA. Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
GRPC development in Lyon
Summary of TS2 activities on CO2 vacuum insulated lines on YB0
European DHCAL Meeting 13/06/08
CHAPTER 2 Pipeline Coatings.
HOW TO SAFELY BOX AND SHIP PINNED INSECTS
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
Sapphire Fused Silica and EP30-2
RPC Production at GT A Mass scale RPC Production
BORDER SEAL After finish the festooning of all polished surfaces and carving of the cast in the post dam area. Now the next step is to do border seal.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
STAR TOF MRPC Mass Production & Q.C. (USTC)
TRENTON Casing Filler Presentation
Correct Procedures for Changing, Storing, and Maintaining Saw Blades
Presentation transcript:

QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.

1. HPL 1) Discharge & restoration on flat tables 2) Barcode check 3) Visual inspection to reject bad HPLs - Scratches on surfaces - Check the condition for polished surfaces - Edge: requiring no damage 4) Registration of the barcode # for qualified HPLs QC Procedures

σ = Graphite procedure 1) Cleaning surfaces with IPA 2) Silk masking for graphite offsets with 22-mm wide tape. 3) Graphite by silkscreen ink - Dry the silk surface for 7 days at 18 ~ 22 o C - # of prints in a single production batch ~ 90 sheets - Check the local variation each sheet by measuring resistivity at 2 points inside & 1 ~ 2 near corners - For the qualification. The mean should lie in 80 kΩ < ρ mean < 130 kΩ Record the mean resistivity for each sheet in the data base

3. Selection of parts 1) Coin spacers: accepted if d = 1.96, 1.97, 1.98, 1.99 mm 2) Edge spacers: accepted if d = 1.95, 1.96, 1.97, 1.98, 1.99, 2.00 mm 3) Gas in/outlet profiles: accepted if d = 1.95, 1.96, 1.97, 1.98, 1.99, 2.00 mm - have to check carefully any defect in gas-pipe holes -> impedance 4) PET film (SH71S, SKC, d = mm) - Should always use fresh PET 4. Insulation of electrodes with PET 1) Attach the PET-film layer to graphite HPL surfaces with a hot-melt extrusion method - EVA model TANEL-100: extrusion of gel at 170 ~ 180 o C 2) Should be careful for keeping no scratch especially on the cathode sides 3) Check the condition for EVA glue layers: minor bubbles accepted.

5. Gluing 1) Clean inner HPL surfaces with IPA 2) Temperature for gluing & hardening: 21 o C 3) Glue working time: maximum 25 mins 4) Glue hardening time: 24 hours 5) Shielding for leak current: filling along the all peripheries with EVA glue

6. Oil process 1) Quick leak test bfr oiling: rejection when the pressure drop > 2 mm (by using a water column) 2) Oil mixture: 40% Linseed oil + 60% Heptane 3) Filling the oil+HEP mixture of 120-liter in a 200-liter tank 4) The old oil replaced every 3 months (1 oil batch to produce ~ 150 gaps) 5) Temperature for oiling & drying: 30 o C 6) Velocity of lifting & draining for oil coating = 4 cm/min 7) Sucking the remained oil in the gaps for 10 mins with a compressor 8) Dry of oil surfaces for 96 hours with filtered air (relative humidity = 40%) - Flow rate = 60 liter/hour for RE4/2(3) TW(TN) gaps = 90 liter/hour for RE4/2(3) BT gaps 9) We open 1 gap/200 gaps to check the condition for oil surfaces

7. HV tests 1) Range of the HV test: 1 ~ 10.0 kV 2) Gas mixture: 95% C 2 H 2 F 4 + 5% i-C 4 H 10 3) Selection criteria - At 6.0 kV (checking Ohmic currents) - At 10.0 kV (200 V higher than the avalanche-mode limit: should be finalized after the first batch test) - At the final stage of the 84-h test at 9.6 kV Current Limits at 6.0 kV RE4/2 TWRE4/2 TNRE4/2 BT 1.5 μA RE4/3 TWRE4/3 TNRE4/3 BT 1.5 μA Current Limits at 9.6 kV RE4/2 TWRE4/2 TNRE4/2 BT 2.0 μA 3.5 μA RE4/3 TWRE4/3 TNRE4/3 BT 2.0 μA3.5 μA5.0 μA Current Limits at 10.0 kV RE4/2 TWRE4/2 TNRE4/2 BT 5.0 μA 10.0 μA RE4/3 TWRE4/3 TNRE4/3 BT 5.0 μA 10.0 μA - At 9.6 kV, i(120h)/i(60h) < 1.5 for the previous production The current increasing slope is utmost important. Have to be decided after the first batch test.

8. Gas leak & pop spacer test 1) Gas leak - Load + 20 hPa pressure to each gap - Limits of gas leaks (still under R&D) 2) Pop spacer test - Load + 20 hPa pressure to each gap - No pop spacer allowed - Shift (by pressing the spacer positions) to be regarded as a failure: 3 hPa RE4/2 TWRE4/2 TNRE4/2 BT 0.2 hPa 0.3 hPa RE4/3 TWRE4/3 TNRE4/3 BT 0.2 hPa0.3 hPa0.4 hPa

9. Packing & shipping 1) Visual inspection - PET shielding - Gas pipes & edges (EVA shielded) 2) Place protection films on both surfaces of each gaps 3) Vertical mounting in the dedicated boxes - 50 RE4/2(3)TW + 50 RE4/2(3)TN -> 1 box - 50 RE4/2(3)BT -> 1 box 4) Be sure that the all gas pipes -> open 5) Transportation to the airport by a 5-ton truck