MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.

Slides:



Advertisements
Similar presentations
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Advertisements

Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
SPHERES ISS Flight Preparation & Hardware Status 08 July 2002 Steve Sell Stephanie Chen
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Latifa AlAbdulkarim King Saud University October,2009.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama In-Space Crew-Collaborative Task Scheduling John.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
GEEN 2850 / REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: _01 FOR DESIGN CONCEPT OF THE CU Balloon Experimental Satellite (CUBESAT)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIF End-to-End Process.
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Introduction to Payload Planning Will Kirby (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Your Name Organization.
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
Mission Planning Process Changes Gary Rowe Mission Planning Team Lead Teledyne Brown Engineering Presented to: Increment 3 POIWG June 13, 2001 Mission.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Status Increment.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama LEGO BRICKS TIR OVERVIEW Tricia Pittman EO20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
INTERNATIONAL SPACE STATION Kathy Nordmann Payload Crew Training 18 January 2005 TRAINING and CREW OPERATIONS.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
I29/30 Robonaut Training Strategy Team (TST) Mike Joseph Robonaut Training Coordinator Notice: Material contained.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NASA MSFC Engineering Directorate Huntsville, Alabama 10/29/2012 HOSC DTN Activities October 2013.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Safety Operations at.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Flight Control Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
Payload Operations and Integration Center MSFC Daily Summary for PDs.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Date: FD35 Page: 1 Agricultural Camera (AgCam) TIM #1-1 TST Introduction and Payload Training Overview Wade Stevens Flight Projects Directorate TBE/FD35.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
Presentation transcript:

MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST Brenda Wagner EO

MOL The Mission Operations Laboratory Page 2 NASA MSFC Engineering Directorate Huntsville, Alabama OpNom / Ops Overview Smartphone P/N HET-NEXUS-S-01 Smartphone Data Cable P/N HET-NEXUS-S-03 Smartphone Battery Pack P/N HET-NEXUS-S-02 Ops Overview – Initial Ops only? For how long before additional ops added? Smartphone attached to Satellite via velcro? Smartphone video activated (stays the length of the session?) Smartphone removed – cable attached to phone & SSC then video transferred to SSC. (Any special software needed to copy video from phone to SSC?) Smartphone deactivated and stowed

MOL The Mission Operations Laboratory Page 3 NASA MSFC Engineering Directorate Huntsville, Alabama Crew Training Added to Steve’s training in March? or OBT? or Put info in Test Plan since it is so simple??? PTDR If OBT – Send to Chris to give to Bluesuiter for review. Uplinked via OCR. If ground – get additional chart from Steve for Chris to review 2 weeks prior to March 7 th week Mike Fossum (CDR Exp 29), Don Pettit (Exp 30), and Joe Acaba (Exp 31) are in March. Ron Garan was trained back in May of last year (will he need the info?). Burbank (CDR Exp 30) will be trained in either April or May.

MOL The Mission Operations Laboratory Page 4 NASA MSFC Engineering Directorate Huntsville, Alabama Crew Training Data Set (TDS) If OBT will Curriculum TDS be needed? (TDS shows: OBT, any prerequisites, duration, lesson description, etc) If added to current Training – update current generic TDS? (lesson description)

MOL The Mission Operations Laboratory Page 5 NASA MSFC Engineering Directorate Huntsville, Alabama Product Development Milestones Template Negotiated / (grnd trng)  TSTI-20 / CDRFeb 2011  OpNom Dev & SubmittalI-20 to I-16Feb 2011  Procedure DevelopmentI-20 to I-7Feb 2011  Lesson Plan/Courseware Delivery (if grnd trained) I-10May 2011 / Feb 2011  Training Verification (PTDR) (if grnd trained) I-9May 2011 / Feb 2011  Ready for Training (if grnd trained) I-6May 2011 / Mar 2011  TIR (Team Integrated Review) I-6Mar 2011  ECR to Baseline ProceduresI-6Mar 2011  Flight Rule InputsI-6Feb 2011  Payload Reg InputsI-4Feb 2011  JIT (Just-In-Time Review)I-1~4 wks minus activity