Examples for the Engagement of high level policymakers to sustain project outcomes GEF IW LEARN Workshop Jamaica 23-25 March 2014 Norbert Fenzl Maria Apostolova.

Slides:



Advertisements
Similar presentations
DISASTER REDUCTION AND CLIMATE CHANGE ADAPTATION
Advertisements

ClimDev-Africa Program & African Climate Policy Center (ACPC)
CASE STUDY FOR THE SHARED STOCKS OF THE SHRIMP AND GROUNDFISH FISHERY OF THE GUIANAS-BRAZIL SHELF CLME Steering Committee Cartagena, 4-6 March 2013.
Disaster Risk Reduction and the use of the Hyogo Framework
AMAZON RIVER CE387 TRANSBOUNDARY WATER RESOURCES Eusebio Ingol February 14, 2008.
Reducing Trans-boundary Degradation of the Kura-Aras River Basin UNDP/Sida United Nations Development Programme Swedish International Development Cooperation.
BUILDING AN ECOSYSTEM APPROACH TO MANAGING AFRICAN MARINE RESOURCES Agulhas and Somali Current Large Marine Ecosystems Project From ASCLME to SAPPHIRE.
10/10/2011 United Nations Environment Programme World Conservation Monitoring Centre PARCC West Africa Protected Areas Resilient to Climate Change in West.
Focal Area and Cross Cutting Strategies – International Waters GEF Expanded Constituency Workshop March 22 – 24, 2011 Kyiv, Ukraine.
Program for Comprehensive Action against Antipersonnel Mines Report to the Committee on Hemispheric Security March 26, 2015 Department of Public Security.
IWRM as a Tool for Adaptation to Climate Change
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
PRE CONFERENCE WORKSHOPS 24 th October, 2009 GCLME Marine Management and Governance Christian Susan Project Manager, UNIDO Water Management Unit.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Caribbean & North Brazil Shelf Large Marine Ecosystems 10-year CLME + SAP and 5-year UNDP/GEF CLME + Project Patrick DebelsLaverne Walker Regional CoordinatorSenior.
Newton Paciornik Ministry of Science and Technology General Coordination on Global Climate Change Capacity-building in Brazil.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Regional Capacity Building Activities in the Caribbean UNFCCC Expert Workshop on Monitoring and Evaluating Capacity- building in Developing Countries Carlos.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
The European Union Water Initiative in the EECCA countries: Recent Developments Nicola Di Pietrantonio Neighbourhood Directorate European Commission Bishkek,
A Framework for Sustainable Water Resources Management in the La Plata Basin, with Respect to the Hydrological Effects of Climatic Variability and Change.
Ministry of Regional Development and Public works Global Environment Facility United Nations Development Programme Integrating Global Environmental Issues.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
Regional Strategy on Human Resources for Health (WHO Western Pacific Region) Presentation by Dr Ezekiel Nukuro Regional Adviser, Human Resources.
SOPAC GEF Sustainable Integrated Water Resources and Wastewater Management Project (Pacific IWRM Project)
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Mounir BENHAMMOU Director of Administrative and Financial Department Secretariat General of the Arab Maghreb Union EN/CSC2/2014/Pres/05.
New Policy Measures Marko PREM Deputy Director. What policy? Governmental:  (1) Basic principles by which a government is guided.  (2) Declared objectives.
Sub-regional Workshop for GEF Focal Points in the Middle East, North Africa, & West Asia Cairo, Egypt, October 2009.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Key aspects Define sound legal and institutional mechanisms and frameworks Especially Basin Organizations should have well defined mandates Example of.
River Basin Management in Southern Africa Barbara Schreiner.
Towards a Synergistic Strategic Action Programme for the WIO Region A Roadmap for the Development and Implementation of Priority Strategies and Actions.
The Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem (MedPartnership) Zagreb, Croatia Regional Workshop on harmonizing the national.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
IWRM in GEF-Supported International Waters and their Transboundary Basins Dann M. Sklarew, Ph.D Director/Chief Technical.
Flood Task Force Report to the 4th Meeting of the Parties 20 to 22 November 2006 Bonn.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
XVII Meeting of the SSC LBA PROJECT ANDEAN LBA INITIATIVE BELEM, PA, BRAZIL. 2-4 JUNE 2005.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
The Guarani Aquifer Project: contributions for the groundwater resources management Luiz Amore GEF Third Biennial International Waters Conference. June,
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
INTER-AMERICAN DEVELOPMENT BANK Infrastructure and Environment Department (INE) Environment, Rural Development and Natural Disasters Division (RND) Agriculture,
Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem Paul Mifsud UNEP/MAP Coordinator GEF 3 rd IWC - UNEP Session 24 th June, 2005.
Sustainable Management of the Bay of Bengal Large Marine Ecosystem Rudolf Hermes Chief Technical Advisor, BOBLME 1 st Asia Pacific Regional Targeted Workshop.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia First year budget Dr. Sergey Kudelya.
Caspian Environment Programme (CEP) GEF 3rd Biannual International Waters Conference June Salvador.
Largest continuous area of tropical rainforest in the world Basin of approximately 7.5 million km 2 One third of world species habitat. Biological diversity.
II Regional Workshop for GEF IW Projects in Latin America and the Caribbean Buenos Aires, Argentina, June 14, 2013 Good practices with legal frameworks:
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
DELTAmerica Project Development and implementation
A Framework for Sustainable Water Resources Management in the La Plata Basin, with respect to the Hydrological effects of Climatic Variability and.
THE SIXAOLA RIVER BASIN BINATIONAL COMMISSION COSTA RICA – PANAMA:
Focal Area and Cross Cutting Strategies – International Waters
GEF International Waters
Environment and Fisheries Partnership for the implementation of the CCLME project By Birane SAMBE.
Dr. Sergey Kudelya Project manager
Partnership for the Gulf of Mexico SEMARNAT GCOOS MoA
Focal Area and Cross Cutting Strategies – International Waters
Focal Area and Cross Cutting Strategies – International Waters
Focal Area and Cross Cutting Strategies – International Waters
Focal Area and Cross Cutting Strategies – International Waters
LIFE and the implementation of the Water Framework Directive
Roadmap for Health in All Policies in Sudan
Setting the foundations for zero net loss of the mangroves that underpin human wellbeing in the North Brazil Shelf LME “ To improve human well-being by.
History of the Pacific Islands Oceanic Fisheries Management Project
Presentation transcript:

Examples for the Engagement of high level policymakers to sustain project outcomes GEF IW LEARN Workshop Jamaica March 2014 Norbert Fenzl Maria Apostolova Regional Project Coordination Integrated and Sustainable Management of Transboundary Water Resources in the Amazon River Basin, considering the variability and climate change.

Is a basin of approximately 7.5 million km 2 Is the largest continuous area of tropical rainforest in the world THE AMAZON REGION The Amazon is the habitat of one third of the world’s species

Approximately 385 indigenous peoples and 71 references of isolated peoples About 40 million of inhabitants

OBJECTIVES OF THE PROJECT Development of a Strategic Action Plan (SAP) for the Amazon Basin and creation of a propitious environment for future implementation. The SAP will provide the basis for the ACTO Member Countries to implement an integrated management of water resources in the Amazon Basin, and adapt measures to mitigate the impacts of climate change Integrated and Sustainable Management of Transboundary Water Resources in the Amazon River Basin, considering the variability and climate change.

PROJECT STRUCTURE Component IV PROJECT MANAGEMENT Component I UNDERSTANDING THE AMAZON SOCIETY Component II UNDERSTANDING THE NATURAL BASE Component III RESPONSE STRATEGIES Component V MONITORING AND EVALUATION

Component I Subproject.1.1: Vision of the Amazon Basin Subproject I.2 : Strengthening the legal and institutional framework Subproject.1.1: Vision of the Amazon Basin Subproject I.2 : Strengthening the legal and institutional framework Subproject II.1: Directed Research Subproject II.2: Hydroclimatic Vulnerability Atlas Subproject II.3: Formulation of the TDA Subproject II.1: Directed Research Subproject II.2: Hydroclimatic Vulnerability Atlas Subproject II.3: Formulation of the TDA Component II STRUCTURE OF THE PROJECT COMPONENTS Component III Subproject III.1: Pilot Projects Subproject III.2: Adaptation Measures Subproject III.3: Integrated Information System Subproject III.4: Communicatio, Extension and Finance Subproject III.5: SAP Subproject III.1: Pilot Projects Subproject III.2: Adaptation Measures Subproject III.3: Integrated Information System Subproject III.4: Communicatio, Extension and Finance Subproject III.5: SAP Activities for project supervision Component V Monitoring and Evaluation of the Project Component IV

MAIN PRODUCTS OF THE PROJECT  A shared Vision of the Amazon Basin  Understand common problems, priorities, needs and goals of the stakeholders of the Amazon basin concerning IWRM and define future development scenarios for the Region  A Transboundary Diagnostic Analysis (TDA). Based on prioritized research activities on transboundary water resources of the Amazon basin and climate vulnerability analysis, the TDA provides scientific and technical input to the Strategic Action Programme (SAP).  The Strategic Action Programme (SAP), developed on the basis of all the results and products of the project.

Examples of Project Activities for the Engagement of high level policymakers to sustain project outcomes High Level Ministerial Meetings Adaptation to Climate Change in theTransboundary MAP Region (Bolivia, Brazil, Peru) Climate Change, Ecosystem Services and Government in the Transboundary Purus Riverbasin Adaptation to Sea Level Rise in the Amazon Delta TDA process in the ACTO member countries

XI MEETING OF FOREIGN MINISTERS OF THE AMAZON COOPERATION TREATY MANAUS, 22 NOVEMBER 2011 STATED THAT THE START OF THE PROJECT Integrated and Sustainable Management of Transboundary Water Resources in the Amazon River Basin, considering the variability and climate change IS AN EXAMPLE OF THE ADVANCES OF AMAZONIAN COOPERATION

II MEETING OF THE MINISTERS OF ENVIRONMENT OF THE AMAZON COOPERATION TREATY LIMA, PERÚ, 21 MARCH 2012 THE MINISTERS AGREED TO SUPPORT THE CONTINUITY OF THE PROJECT EXECUTION AND ENDORSE THE PROJECT WORKPLAN APPROVED AT THE I STEERING COMMITTEE MEETING

XII MEETING OF FOREIGN MINISTERS OF THE AMAZON COOPERATION TREATY EL COCA, ECUADOR, 3RD MAY 2013 EXPRESSED THEIR SATISFACTION IN RELATION TO THE RESULTS ACHIEVED BY THE PROJECT Integrated and Sustainable Management of Transboundary Water Resources in the Amazon River Basin, considering the variability and climate change..

Adaptation to Climate Change in the Transboundary MAP Region

Floods in the MAP region March 2014

Engagement of high level policymakers to sustain project outcomes Agreements of Governments of Brazil, Peru and Bolivia to share information for a common meteorological forecasting system Agreements and active participation of the local governments of Acre (Brazil), Pando (Bolivia) and Madre de Dios (Peru) in training of technicians to operate the system and to install the necessary situation rooms

Climate Change, Ecosystem Services and Government in the Transboundary Purus River basin

Engagement of high level policymakers to sustain project outcomes Participation of the Brazilian Ministry of Integration to foster the adoption of the meteorological prevision model by the local governments. The local governments are committed to participate in the testing phase of the model and agreed to apply the model in the future

Adaptation to Sea Level Rise in the Amazon Delta

Affected areas of land loss

Land losses on the Marajo Atlantic Coast

Engagement of local policymakers to sustain project outcomes The periodic relocation of communities due to the advances of the coast line and the missing long term strategy to tackle this problem causes high economic and political price to the local politicians and municipality administration. Since the project offers a consistent log term strategy for relocation of the local affected population, the local policymakers are committed to adapt the strategy and already discussed the policies to be voted to implement the strategy developed by the project.

Until today the project carried out three national TDAs (Peru, Ecuador and Colombia). Three more are scheduled for Suriname, Guyana and Brazil during the month of May. The results of the national TDAs are being presented officially in each country counting with the presence of high level policymakers. In the case of Peru the presentation has been assisted by the vice presidency, ministers and senators. Engagement of high level policymakers in the TDA process in the ACTO member countries

Thank you, Thank you,