SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS

Slides:



Advertisements
Similar presentations
Technologies 1 CHP (VA Dallas Case Study). Proprietary Information Of Energy 2013 Dallas VA Medical Center A CHP Case Study Design Build Delivery of a.
Advertisements

Energy Efficient Steam Systems
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
ISAT Module V: Industrial Systems
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Installation of New CHP system at the Old Aberdeen Campus.
PRESENTATION OF INDUSTRIAL TRAINING ON
Combined Cycle Theory Dalton Plant Ouachita Plant.
Content of the Presentation
Bachelor Degree in Maritime Operations (BMO)
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
Engineer Fahad Hasan Associate Yousuf Hasan Associates, Consulting engineers District cooling.
“Energy Efficiency Guide for Industry in Asia”
+ Careers in Electricity. + Outcome for today: Outcome EL6.1: Assess personal, societal, economic, and environmental impacts of electricity use in Saskatchewan.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
POWER PLANT.
POWER GENERATION TECHNOLOGIES
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
Cogeneration.
Cogeneration by Michael Bokor. Definition Sustainability Capable of being continued with minimal long-term effect on the environment. In the terms of.
Physical Plant Department Physical Plant Department Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Gas Turbine Power Plant
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
УПРАВЛЯЮЩАЯ КОМПАНИЯ Moscow УПРАВЛЯЮЩАЯ КОМПАНИЯ All gas turbine engines for pipelines made and installed from 1991 until 2008 CompanyType Specifications.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
1 Kern River Oil Field Miriam Jasso, Matthew Kurtz, and Anood Meerza California State University, Bakersfield MKTG 606 Term Presentation May 14, 2008.
Gas Turbine Theory and Construction
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Endend /01 PPT10/03/99 Diesel business. endend What can the Diesel Business offer? Individual diesel engine packages up to 15 MW or Total diesel.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Unit 2 -Gas And Diesel Power Plants
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Heat pumps Effectiveness measured by the Coefficient of Performance C.O.P. = T h /(T h -T c ) This comes from the Carnot Efficiency As the outside air.
Welcome PRESENTATION BY ASHISH MISHRA.
Facilities Management and Design Chapter 7 HVAC Systems.
TO WHOM IT MAY CONCERN We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year.
Heat Pumps In a heat engine, heat is converted to mechanical energy by taking advantage of the fact that heat flows from hot to cold. The heat is taken.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Heat Pumps In a heat engine, heat is converted to mechanical energy by taking advantage of the fact that heat flows from hot to cold. The heat is taken.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
THERMAL POWER PLANT.
SURATGARH SUPER THARMAL POWER STATION
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
BIOMASS SUPPORTED SOLAR THERMAL HYBRID POWER PLANT
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Cogeneration Power plants generate lots of waste heat Modern coal fired plants convert 38% of the energy in the coal to electricity, the other 62% is waste!
Gas Turbine Power Plant
Caspian Company مجری پروژه های نیروگاهی ، احداث مولد های مقیاس کوچک و سیستم های CCHP & CHP ohen staufen ring-20- koln – germany.
Overhaul of Combustion Turbines Under NSR Regulations
Power Plant Technology Combined Cycle and Renewable Energy Power Systems (Assignment 1) by Mohamad Firdaus Basrawi, Dr. (Eng) Mechanical Engineering Faculty.
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Power Plant Technology Combined Cycle and Renewable Energy Power Systems (Lecture 1) by Mohamad Firdaus Basrawi, Dr. (Eng) Mechanical Engineering Faculty.
Cogeneration Dr. Haider Ali.
BASIC MECHANICAL ENGINEERING
Presentation on Cogeneration and District Cooling Plant
Energy Conservation CERD /12/2017
Combined Cycle Power Plants
Presentation transcript:

SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS 1

SATURN – GAS TURBINES PRODUCT LINE  , % 25 MW 16 MW GCS 10 MW 6.3 / 8 MW 4 MW GCS 35-39% 38-44% 32-36% 25 MW 16 MW 12 MW GS GTPP 2.5 MW GS GTPP 10 MW 8 MW 6 MW GTPP CCPP Fuel: associated gas, natural gas, synthesis gas;  diesel fuel, kerosene. 28% >75% 35% >85% >85% 42-46% Ne, MW GTPP – gas turbine power plant CCPP - combined-cycle power plant GCS – gas compressor set GS - generator set 42% - electric efficiency >85% - fuel utilization factor 2

GAS COMPRESSOR SETS 4 – 25 MW Gas compressor sets are designed to be used in underground gas storage stations (UGSS) and to transfer gas via pipelines. The units are developed to meet the gas industry latest requirements. Gas compressor sets provide high technical and economical performance values and allow to maintain state-of-the art level of gas transfer capabilities. Gas compressor sets are equipped with remote control system with high protection level and meet all gas industry technical and operational requirements. The units can be designed in two options: outdoor or indoor. 3 3

GTD-4RM (NPO Saturn) - a drive for GPA-4RM GPA-4RM GAS COMPRESSOR SET GTD-4RM (NPO Saturn) - a drive for GPA-4RM Rated power, MW 4.1 Efficiency, % 32.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 935 4 4

GPA-6,3/8RM GAS COMPRESSOR SET GTD-6,3/8RM (NPO Saturn) – a drive for GPA-6,3/8RM Rated power, MW 6.3 6.3 / 8 Efficiency, % 32 34.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 1 435 1 672 5 5

GTD-10RM (NPO Saturn) - a drive for GPA-10RM GPA-10RM GAS COMPRESSOR SET GTD-10RM (NPO Saturn) - a drive for GPA-10RM Rated power, MW 10.2 Efficiency, % 35.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 2 045 6 6

GPA-16 “ARLAN” GAS COMPRESSOR SET PS-90GP2 AL-31ST AL-31 ST or PS-90GP2 gas turbine engines may be used as a drive for GPA-16 “Arlan” PS-90GP2 AL-31ST Rated power, MW 16 Efficiency, % 36.3 35.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 75 000 Service life, years 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 3 175 3 305 7 7

GTN-16R GAS COMPRESSOR SET This type of gas compressor sets is used for replacement (reconstruction) of obsolete gas pumping equipment as well as for a construction of the new ones. The following drives are used: - PS-90GP2 (Aviadvigatel) - AL-31ST (UMPO) Reconstruction New construction 8 8

GPA-25 GAS COMPRESSOR SET PS-90GP25 NK-36ST PS-90GP25 or NK-36ST gas turbine engines may be used as a drive for GPA-25 PS-90GP25 NK-36ST Rated power, MW 25 Efficiency, % 37.9 34.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 4 475 5 231 9 9

GAS TURBINE POWER PLANTS 2.5 – 25 MW GENERATOR SETS AND GAS TURBINE POWER PLANTS 2.5 – 25 MW Reliable supply of electric power and heat to the factories and residential areas. High fuel utilization factor reducing power consumption by enterprises by 2 – 2.5 times in comparison with prices from traditional power suppliers. Small overall dimensions of the plant allow to save industrial space. Effective environmental indexes (noise level <80 dB, emission <23ppm) allow to install the plant near the residential areas. Possibility to run on various types of fuel, including: natural gas, associated oil gas, synthetic gas, diesel fuel. 10 10

D049R (NPO Saturn) is a drive for GTES-2,5 GTES-2,5 GAS TURBINE POWER PLANT D049R (NPO Saturn) is a drive for GTES-2,5 Rated power, MW 2.5 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 28,5 Fuel utilization factor (cogeneration), % 74.5 Overhaul life expectancy, hours 20 000 Assigned life expectancy, hours 120 000 Service life, years 20 Delivery period (since contract conclusion), months 11 Assembly period, months 1 Fuel gas flow rate at nominal, kg/h 680 GT upstream fuel gas pressure, MPa 21 – 25 Heat power, Gcal/h 3.87 Plant outline dimensions, m 12.84 х 3.2 х 2.85 11 11

D30KU/KP (NPO Saturn) is a drive for GTA -6/8 GTA-6 AND GTA-8 GENERATOR SETS D30KU/KP (NPO Saturn) is a drive for GTA -6/8 GTA-6 GTA-8 Rated power, MW 6.0 8.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 25.0 25.8 Fuel utilization factor (cogeneration), % 85.65 92.64 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 Fuel gas flow rate at nominal, kg/h 1 830 2 382 Heat power, Gcal/h 13,3 17,1 Plant outline dimensions, m 14.6 х 3.6 х 3.8 Indoor option Outdoor option 12 12

GTD-6,3/8RM (NPO Saturn) is a drive for GTA - 6,3RM GTA-6,3RM AND GTA-8RM GENERATOR SETS GTD-6,3/8RM (NPO Saturn) is a drive for GTA - 6,3RM GTD-6,3RM GTD-6,3/8RM Rated power, MW 6.3 8.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 32.0 33.0 Fuel utilization factor (cogeneration), % 75.6 72.0 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 1 419 1 730 Heat power, Gcal/h 7.5 12.68 Plant outline dimensions, m 14.6 х 3.6 х 3.8 Indoor option Outdoor option 13 13

PS-90GP and GTE-12S are the drives for GTA-12 GTA 12 GENERATOR SET PS-90GP GTE-12S PS-90GP and GTE-12S are the drives for GTA-12 PS-90GP GTE-12S Rated power, MW 12 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 33 30,5 Fuel utilization factor (cogeneration), % 83 80 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 20 18 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 2 903 2 980 Heat power, Gcal/h 16.6 21.51 Plant outline dimensions, m 14.84 х 3.6 х 3.8 14 14

PS-90EU16 and AL-31ST are the drives for GTA-16 GTA 16 GENERATOR SET PS-90EU16 AL-31ST PS-90EU16 and AL-31ST are the drives for GTA-16 PS-90EU16 AL-31ST Rated power, MW 16.3 16.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 35.5 37 Fuel utilization factor (cogeneration), % 85 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 4 746 3 305 Heat power, Gcal/h 20.4 23.5 Plant outline dimensions, m 20.3 х 15.2 х 21 15 15

PS-90GP25 and NK-37ST are the drives for GTA-25 GTA-25 GENERATOR SET PS-90GP25 NK-37ST PS-90GP25 and NK-37ST are the drives for GTA-25 PS-90GP25 NK-37ST Rated power, MW 22.5 25.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 36.2 34.4 Fuel utilization factor (cogeneration), % 86 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 21 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 4 475 4 994 Heat power, Gcal/h 26.5 31.7 Plant outline dimensions, m 28 х 22.9 х 27.7 16 16

GAS TURBINE EQUIPMENT IN POWER ENGINEERING Power supply for oil and gas fields, power consuming enterprises and facilities detached from centralized power supply. Reconstruction of obsolete equipment of boiler houses, heat power plants and state district power plants. Installation of new gas turbine equipment enable to increase the fuel utilization factor for more than 80%, thus saving fuel and increasing the quality of power supply. Combined cycle power plants provide heat and electric power to enterprises, utility companies and companies of oil and gas industry. The fuel utilization factor in combined cycle increases by 1.5 times. 17 17

GTES-6 GAS TURBINE HEAT POWER PLANT WHRU MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-6RM 2 Generator 3 Air intake and filter unit 4 Gas duct 5 WHRU Е-50/3,9-440 6 Fire extinguishing system 7 Auxiliary switch and control gear 8 Switch and control gear 9 Control panels 18 18

GTES-12 GAS TURBINE HEAT POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-6RM 2 Generator 3 Air intake and filter unit 4 Gas duct 5 WHRU Е-50/3,9-440 6 Fire extinguishing system 7 Auxiliary switch and control gear 8 Switch and control gear 9 Control panels 19 19

GTES-16 GAS TURBINE HEAT POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 2 Generator 3 Air intake and filter unit 4 Gas duct 5 WHRU E-50/3,9-440 6 Fire extinguishing system 7 Auxiliary switch and control gear 8 Switch and control gear 9 Control panels 20 20

PGU-22 COMBINED CYCLE POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 2 Generator 3 Air intake and filter unit 4 Gas duct 5 HRSG KGT-10/4,0-440 6 Fire extinguishing system 7 Steam turbine T-6-4,0/0,18 8 Steam turbine generator 9 Condenser 10 Auxiliary switch and control gear 11 Switch and control gear 12 Control panels 13 Deaerator 3 6 11613 4600 19105 4000 4 1 2 К Р У , 5 к В С Н - . у 51000 750 200 9000 21 21

GTD-10R/RM drive (NPO Saturn) PGU-28 COMBINED CYCLE POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-10RM 2 Generator 3 Air intake and filter unit 4 Gas duct 5 HRSG KGT-10/4,0-440 6 Fire extinguishing system 7 Steam turbine T-8-4,0/0,18 8 Steam turbine generator 9 Condenser 10 Auxiliary switch and control gear 11 Switch and control gear 12 Control panels 13 Deaerator GTD-10R/RM drive (NPO Saturn) 22 22

PGU-32 COMBINED CYCLE POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine unit GTU-12P 2 Generator TS-12-2 RUHL3 3 HRSG KGT-17/4.0-440 4 Steam turbine T-8.5/10.2-3.4/0.18 with GTG-8-RUHL3 generator set 5 Exhaust duct 6 Gearbox 23 23

PGU-52 COMBINED CYCLE POWER PLANT MAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 4 2 Generator 3 Air intake and filter unit Gas duct 5 HRSG KGT-20/4,0-440 6 Fire extinguishing system 7 Steam turbine T-10-4,0/0,18 8 Steam turbine generator 9 Condenser 10 Switch gear 11 Auxiliary switch and control gear 12 Switch and control gear 13 Control panels 14 Deaerator 24 24