Aras Papadelis, NIKHEF Jaarvergadering 19/12/06 1 Fresh results from the LHCb Vertex Locator test beam Aras Papadelis Ann Van Lysebetten, Anne Keune, Eddy.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

First results from the ATLAS experiment at the LHC
TRT LAr Tilecal MDT-RPC BOS Pixels&SCT 1 The Atlas combined testbeam Thijs Cornelissen, NIKHEF Jamboree, Nijmegen, December 2004.
9 November 2006VELOEddy Jans 0 ACDC3 VELO-testbeam Nov ‘06 November 9, 2006 preparation for transport transport Assembly Lab -> H8 testbeam (Prevessin)
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
1Beam Line Review. 17th November Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
VELO Beamtest Trigger VELO meeting 08/12/2005 Jianchun (JC) Wang Syracuse University.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Increasing Field Integral between Velo and TT S. Blusk Sept 02, 2009 SU Group Meeting.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
The LHCb VErtex LOcator Olaf Behrendt on behalf of the VELO group Novosibirsk,
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
1 Jan Conrad (CERN) PSD Liverpool, Sept (CERN) Beam Test Performance and Simulation of Prototypes for the ALICE Silicon Pixel.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
LHCb VErtex LOcator & Displaced Vertex Trigger
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Detector Development Overview Group Meeting – October 2014 Euan N. Cowie 22 October Detector Development Overview - ENC.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Charmonium Production in 920 GeV Proton-Nucleus Interactions Presented by Wolfgang Gradl for the HERA-B
LHCb Vertex Detector and Beetle Chip
David Hutchcroft 1 VELO software. Lite clusters in Kalman fit 2 The VELO clusters are available both as a lite and “full” version Two consecutive blocks.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Luminosity monitor at LHCb Tomáš Laštovička (CERN ) on behalf of the LHCb Collaboration LHC workshop on the luminosity monitoring and measurement January.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
A novel approach to detector calibration parameter determination and detector monitoring Eduardo Rodrigues On behalf of the LHCb VELO Group CHEP 2010,
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Alignment Challenge at LHCb Steven Blusk Syracuse University LHC Alignment Workshop, Aug 3-5, 2006.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
12 th LECC, Valencia Sep 2006Aldo F. Saavedra 1 The Vertex Detector of LHCb - VeLo Aldo F. Saavedra Glasgow University On behalf of the VeLo group.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
First collisions in LHC
Beam test of Silicon-Tungsten Calorimeter Prototype
First data from TOTEM experiment at LHC
Beam Gas Vertex – Beam monitor
Simulated vertex precision
Kevin Burkett Harvard University June 12, 2001
Vertex, Track Reconstruction & Luminosity Monitoring at LHCb
The LHC collider in Geneva
Preparation of the CLAS12 First Experiment Status and Time-Line
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
VELO Software Status Some highlights of recent work
Niels Tuning (Outer Tracker Group LHCb)
LHCb Alignment Strategy
The LHCb VErtex LOcator
Aras Papadelis NIKHEF Vertex 2005, Nikko, Japan
LC Calorimeter Testbeam Requirements
First results from the LHCb Vertex Locator
Presentation transcript:

Aras Papadelis, NIKHEF Jaarvergadering 19/12/06 1 Fresh results from the LHCb Vertex Locator test beam Aras Papadelis Ann Van Lysebetten, Anne Keune, Eddy Jans, Hans de Vries, Martin van Beuzekom, Thijs Versloot, Tjeerd Ketel

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 2/17 ACDC, No ordinary test beam Test beam = R&D ? Not always! The VELO Alignment Challenge & Detector Commissioning (ACDC): ¼ of the real VELO in SPS 400GeV proton beam Final hardware and Experimental Control System (ECS) Operation in vacuum with CO 2 cooling Real LHCb firmware and software (event building, clustering, tracking, vertexing, alignment, online monitoring) - A FULL SYSTEM TEST - A DRESS REHEARSAL - THE FIRST STEPS OF THE COMMISSIONING

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 3/17 Beam z y x VELO in North Area, November 2006 ( 4 weeks ago!!!)

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 4/17 Targets 8 targets 200/300 micron Pb- coins Emulate open and closed VELO R =2.5 mm R =1 mm

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 5/17 Recabling in the name of physics Straight Tracks Interactions in silicon Angled TracksSome More Vertices Target

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 6/17 Online monitoring X Y # Online high level monitor  For example, see the beam spot in real time!

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 7/17 First tracks in the “real” VELO ● From LHCb event display - Panoramix

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 8/17 Software alignment ● Important part of the ACDC – demonstrate that the alignment software works with real data. Spacepoint y-residuals

Aras Papadelis, NIKHEFJaarvergadering 19/12/2006 9/17 Vertex analysis ● 35 M events from target runs on tape (1.5 TB) ● Low purity of sample  ~ useful target vertices. ● To reconstruct vertices every step in the software chain has to work. ● 1 st analysis focused on 4 targets (2 closed VELO + 2 open VELO) The data is very fresh (4 weeks since test beam) so the analysis results are preliminary!

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 The VELO locates a vertex! 2-track vertex event in Panoramix Seen “almost” online! 4 mm Al vacuum trolley wall Target cylinder

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 The vertices from the vacuum trolley proved very useful during data taking. Their XY distribution used as hit map during test beam. Offline we might use vertices in the trolley to unfold the beam profile. The vertex landscape z/mm x/mm y/mm “Closed VELO” targets

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Vertex z ● We can clearly reconstruct the z positions of the targets and silicon sensors. ● E particle < 1 GeV ● Targets far from first silicon Vertex resolutions are not LHC-like but worse z y x

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 X slice Edges in X-Y X/mm Y/mm Fit sum of two error functions (integral of gaussians) to central X and Y to find target edges Y slice x/mm y/mm

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Edge fits – “closed VELO” targets Red marker and rings = metrology result Blue markers = fitted edges and centre

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Edge fits – “open VELO” targets Red marker and rings = metrology result Blue markers =fitted edges and centre

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Analysis results so far ● Preliminary results! ● X-Y resolution is ~ 150 (closed) – 300(open)  m. ● Differences between metrology and reconstructed edges. Something to investigate! Still space for improvement. ● Move to more sophisticated fit method. ● More data on tape to look at! ● Compare with simulation Most important result at the moment: - The VELO software and hardware is there and it works! We see vertices!

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Summary In 2006 the VELO group conducted a system test (ACDC) in the SPS beam where hardware and software was commissioned in preparation for the LHC start One of the crucial exercises was to show the ability to reconstruct the xy positions of vertices from targets will be a very exciting year for the VELO: - finish assembly - installation in pit (May) - First beam in LHC (November) The battle of CERN Prevessin - Nov 2006 THE VELO IS PREPARED!

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 BACKUP SLIDES

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Fitting with error functions ● A simple Gaussian fit the x/y distribution doesn’t give edges. ● But, assume that each vertex measurement is Gaussian  Vertex x/y distribution is sum of Gaussians  described by two Error functions. diameter centre edge σ Erf(1; 0.3)-Erf(3; 0.3) edge

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 Target positions scintillator 100mm 90 mm ≥3 hits in modules + scintillator hit 4 upstream targets4 downstream targets 8 targets in total, 2 x 4, 200μm and 300 μm 4 inner – 1mm radius 4 outer – 2.5mm radius. Emulate a half open VELO. X /mm Target 1 Target 2

Aras Papadelis, NIKHEFJaarvergadering 19/12/ /17 A cool VELO MAIN LESSONS LEARNED The CO2 cooling method works. The cooling on the modules is sufficient. T < 0°C on sensors is no problem. CERN crane drivers don’t work after 5pm and weekends. CO2 batteries tend to need replacement by a crane driver after 5pm and on weekends. Cooling made at NIKHEF and operated by Ann Van Lysebetten & Eddy Jans