PIP Update May 23 2012. Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Fermilab New Tuner J. Reid M. Slabaugh August 6, 2014 J. Reid 1.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Aug 22 th Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Feb 11 th Agenda Summary Update – Current Activities – Updates (Tom Kubicki) – Additional Meetings/Notes.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Proton Improvement Plan Accelerator Sector Planning and Strategy Oct. 27 and 28 W. Pellico Bob Zwaska, Keith Gollwitzer, Fernanda Garcia Valery Lebedev,
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
In House RF Power Option John Reid December 14, 2011.
Complementary ISTC Projects #3888, 3889p
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Presentation transcript:

PIP Update May

Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing Dennis

Update (PIP – Shutdown) RFQ – Energy Problem Continues (multiple tests – studies) – Schempp is coming to FERMI after IPAC – Buncher pumping down Cavity 7 Testing – Two tuners are off – Testing may start next week LCW – Set to go Booster RF – lots going on (slides later) Bias Supply work – ready to purchase transformers Linac High Power Write Up – on going Linac Modulator – met with Continental

Budget – Budget Update

Budget Update Project / TaskSum of OBL BUDREV OBL BUDGETCHANGEProject / Task AD AD-Linac PIP 200 MHz RF PS PA Prelim Design AD AD-Linac PIP 200 MHz RF PS PA Prototype (26.000) AD AD-Linac PIP 200 MHz RF PS Modulator Prelim Design AD AD-Linac PIP 200 MHz RF PS Modulator Prototype AD AD- Linac PIP 7835 Tube Procurement Strategy AD AD- Linac PIP 7835 Tube Acquisitions AD AD- Linac PIP Accelerator Physics Studies AD AD- Linac PIP Notching System Improvements AD AD- Linac PIP Beam Instrumentation AD AD- Linac PIP Beam Controls Prelim Design AD AD- Linac PIP Power Distribution Planning and Design

Budget Continued AD AD-Linac PIP Vacuum Systems Replacement AD AD- Booster PIP RF Anode PS Planning & Oversight ( ) AD AD- Booster PIP RF Bias Supp Planning & Oversight AD AD- Booster PIP RF Bias Supp Design & Specs ( ) AD AD- Booster PIP RF Test Stand ( ) AD AD- Booster PIP RF Cavities and Tuners Rework Planning & Oversight ( ) AD AD- Booster PIP RF Cavities and Tuners Rework AD AD- Booster PIP New RF Tuners Planning & Oversight AD AD- Booster PIP New RF Tuners Design AD AD- Booster PIP New RF Tuners Fabrication AD AD- Booster PIP New RF Cavities Planning & Oversight AD AD- Booster PIP New RF Cavity Preliminary Design 0.000

Budget Continued Project / TaskSum of OBL BUDREV OBL BUDGETCHANGE AD AD- Booster PIP New RF Cavity Final Design and Prototype AD AD- Booster PIP New RF Cavities Fabrication AD AD- Booster PIP RF Cavity AD AD- Booster PIP Accelerator Physics Studies AD AD- Booster PIP Aperture and Alignment AD AD- Booster PIP Notching System Improvements AD AD- Booster PIP 95 LCW Improvements AD AD- Booster PIP Vacuum Systems Replacement

Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 67 have been tested and calibrated. – 2 are in the queue to be tested. Completely assembled. – 1 was being tested, but needs a heat sink repair. Temperature of channel A was 20°F higher than the rest. – 3 have combiners in them, need to finish assembly. – 8 chassis built, need heat sinks. – 3 chassis need to be built, add heat sinks to those.

Solid State Driver Upgrade Update Issues – Not too many issues with testing and calibrating. Most common problem is usually an inability to match the currents to within 100mA per channel at 16dBm RF input and the output voltage at 0dBm RF input within ±1V. – Alleviated by swapping out Driver/Output FET’s. – 2 have had heat sink problems. Improper cooling on one channel. – Miscellaneous minor issues (bad IC or capacitor, etc.) – No real labor issues for now. A little behind schedule but amp testing and calibration won’t be a showstopper.

René Padilla, Matt Domeier Booster Modulator Upgrade All parts have been ordered We have 6 part time technicians making subassemblies and 3 full time technicians assembling the Modulators. There are 8 Modulators of the first batch of ten which are 25 % assembled. The other 12 Modulator are about 10 % assembled. The difficult part is the wiring. Expect the wiring to be done by the end of August.

René Padilla, Matt Domeier After the wiring installing the equipment and hooking them up should be quit easy. Maybe 2 months work. continued

High power testing of ferrite cores for new Booster ferrite bias tuners (Proton Improvement Plan) Dennis Barak On behalf of John Reid, Matt Slabaugh, and Steve Hays

What has been completed: Ferrite core samples have been obtained Low power testing of samples has been completed by Ralph Pasquinelli (Nov. 2011) – See THIS document for more detailsTHIS High power testing needs to be completed The high power testing fixture has been refurbished mechanically A high current PS has been designed and built by Steve Hays and co. – Capable of providing up to 30-kA Wednesday, May 23, 2012

Ferrite testing fixture Wednesday, May 23, 2012

High Current PS Wednesday, May 23, 2012

We are currently working on: Finish preparing the high current PS at the testing location (E48 kicker room) Connecting the high current PS to the testing fixture Initial measurements and adjustments need to be made to the fixture – Measure resonant frequency of the structure – Correct the resonant frequency through capacitive loading – Measure unloaded and loaded Q-factor of structure Complete high power test on each sample core Wednesday, May 23, 2012