Weekly Pbar Report 10/26 → 11/2. Stacking This Week …

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Brian Drendel June 8, Pulses of 120GeV proton beam, with intensity of ~8E12, from the Main Injector travel through the P1, P2 and AP1 beam lines,
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Antiproton source startup report Bill Ashmanskas Prevault sump water rerouted to Main Ring OTR installation in AP1. (Another OTR will go into.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
AP2 & Debuncher Acceptance Keith Gollwitzer Dept. of Energy Review February 25, 2004.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
Weekly Pbar Report 10/2 → 10/9. Stacking This Week …
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Antiproton Acceptance Steve Werkema February 8, 2005.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Challenges of Dual Harmonic RF Systems
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Studies for TBT optics measurements in the PSB
Presentation transcript:

Weekly Pbar Report 10/26 → 11/2

Stacking This Week …

Studies This Week … Reverse proton studies: - Debuncher apertures measured – H=35.2pi, V=34.9pi – very good! - More running wave measurements to identify aperture restrictions - Acc to Deb transfer efficiency & apertures Stacking Studies: - IPM measurements of cooling rates in Debuncher transverse systems - New emittance monitor calibration constants added. - Trying out our Accumulator horizontal damper – so far it functions well. - H & V beam sizes vs Debuncher cooling time - Emittance monitor cal check with Pbars

Repairs & Tuning Activities … Started running 2.2s cycle times this week. Lots of routine tuning to improve stacking and efficiency. Broken board in AP2 BPM system found and repaired D:SEXDI (sextupole defocusing) supply off due to bad local/remote switch Problems earlier in week with core emittance blowups – horizontal damper now working and no further problems PLC communication problems interfering with core momentum system gating off during transfers – this was why some shots earlier this week required 5 or 6 transfers to empty stack instead of only 3. Core vertical emittance monitor oscillator frequency incorrect due to 10MHz reference missing. A bad cable connection was the problem. P1-P2-AP1-AP2 beamline tuner (‘Overthruster’) fixed. Controls issues with Debuncher intensity monitor and SEMs fixed. Lots of work on Debuncher cooling. Worked on Accumulator extraction aperture – lambertson move and kicker voltages (so far). Lost D:TOR910 (AP3 line) – repaired more bad cable connections.

Study Requests … Need to commission new skew quadruple magnet A:SQ107 (small stack, parasitic) Stacktail momentum static distribution measurements (no stacking, 15 minutes) Complete characterization of all Debuncher cooling systems (1 shift, no stacking) Redo Accumulator vertical emittance monitor calibration measurements due to oscillator problem (reverse protons, 1.5 hr clean machine)

Upcoming Access Requests … Dead high-level amplifier for core horizontal band 2