CJK IMT 28 Xi’an, China 2-3 Jun. 2011 CJK IMT 28, Xi’an, China 1/4 CJK-IMT28-012 Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of.

Slides:



Advertisements
Similar presentations
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible contribution for Revision of Rec. ITU-R M.1580/1581 ATARASHI,
Advertisements

Development of CEPT and ITU deliverables Ralf Trautmann 6 th International Seminar on Spectrum Monitoring Kyiv, 10 – 12 July 2013.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
1 9 th CJK NID WG, Beijing, China Status report on USN related activities in ITU-T Q.25/16 Document number Beijing, China July 2009 Hyoung Jun KIM,
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document.
1 ITU-R Liaison Group Report - Session #69 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0087r1.
Doc.: 19-11/81r1 Submission July 2011 Junyi Wang, NICTSlide Liaison Report Notice: This document has been prepared to assist IEEE It is.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04r1 Source:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC17-GRSC10-05 Source: GSC-IMT.
CJK IMT 28 Xi’an, China 2-3 June /n CJK IMT 28, Xi’an, China CJK-IMT Summary of AWG-10 HIROIKE, Akira
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
1/6 CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China CJK-IMT Possible Contribution to 11 th Meeting of WP5D ~ Related to Report ITU-R.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
Realizing Green ICT Dream with TTA Result of Regional WS - For information - LIM, Euntaek CJK IMT 28 Xi’an (西安), China June 2 ~ 3,
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/7 CJK-IMT Way forward on Chapter 4 of CJK White Paper by SIG-Future IMT ATARASHI,
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO,
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Doc.: IEEE /0172r0 Submission January 2008 Bruce Kraemer (Marvell); Darwin Engwer(Nortel)Slide 1 IMT-Advanced Opening Report Date:
1/11 CJK B3G #20, China TTA SDO Updates and WiBro Femto cell Standardization Status CJK B3G #20 China April. 8~10, 2009 Djey KIM
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Realizing Green ICT Dream with TTA Review of General WG activities at ITU-R WP5D#10 CJK IMT 28 Xi’an (西安), China June 2 ~ 3, 2011 SONG, Juyeon Samsung.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
ITU-R activities on WRC-19 AI 1.12
Status of AI 1.18 (WRC15) CPG PTC #1
Proposal for study scope of CJK IPTV-adhoc group
GSC IMT Task Force Report
ITU-R WP5D Preliminary Update – February 2009 Geneva Switzerland
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
TTA activities on IMT-Advanced Standardization
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
Update ARIB Activities on IMT Standardization
Update ARIB Activities on IMT Standardization
Update ARIB Activities on IMT Standardization
Sergio Buonomo Counselor ITU-R Study Group 5
GSC IMT Task Force Report
IEEE IMT-Advanced Review Process
GSC IMT Task Force Report
IMT-Advanced Opening Report
Status report from ITU-R WP 5A on ITS activities
GSC IMT Task Force Report
General Discussion Conclusions:
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
GSC IMT Task Force Report
Ca-US-ECC Consultation 2012
TTA Activities on IMT-Advanced standardization
Presentation transcript:

CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of Questions ITU-R 229-2/5 and ITU-R 77-6/5 ~ TANNO, Motohiro

2/4 CJK IMT 28, Xi’an, China Introduction This contribution provides preliminary draft texts for updating Questions ITU-R 229-2/5 and ITU-R 77-6/5 both assigned to WP 5D. Such updating was originally requested in Document 5D/712 (Chairman, SG5), and contributions have been invited at the past meetings of WP 5D, specifically by the Chairman of WG General Aspects.

3/4 CJK IMT 28, Xi’an, China Consideration on Question ITU-R 229-2/5 Question ITU-R 229-2/5 “Future development of the terrestrial component of IMT” One understanding may be that most of the assigned questions in Part A of “decides” have been completed by adoption of Recommendation ITU-R M.[IMT.RSPEC], and future work could focus on the questions in Part B.  Part A – Future development and ongoing enhancement of the terrestrial component of IMT  Part B – Long-term development of IMT However, we would suggest to retain most of the questions in Part A, noting that “Future development and ongoing enhancement” is still needed for current IMT systems (for both IMT-2000 and IMT-Advanced). Therefore, the proposed updating does not contain major deletions or additions of the questions in “decides” part, but proposes refinement of the text.

4/4 CJK IMT 28, Xi’an, China Consideration on Question ITU-R 77-6/5 Question ITU-R 77-6/5 “Consideration of the needs of developing countries in the development and implementation of mobile radiocommunication technology” There have been limited outputs in the past although the Question has identified many points for consideration and items to which attention should be given in carrying out the studies. We have attempted to simplify the text, merging the existing 3 questions in “decides” part into one comprehensive question and reducing the number of items under “considering” part and the associated NOTEs. Recognizing the importance of this Question, the specific elements to be addressed for developing countries are retained as far as possible.

5/4 CJK IMT 28, Xi’an, China Summary Preliminary texts for updating are provided in the Attachments of the contribution for both Questions.