COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C. 2800 Post Oak Blvd., Suite 5850 Houston, Texas 77056.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Interior Wall and Ceiling Finish
Adhesives Questions 1)What is the best kind of clamp to use when gluing wood edge to edge? A.Spring clamp B.Bar clamp C.C clamp D.Hand screw clamp.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Aerospace Fastener Applications
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Installation. Indoor Unit Installation Typical Installation.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Lucas Air Mass Meter Stripdown sequence and technical information.
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Typical Walk-in Closet with elfa® décor
TUBING AND PIPING.
Concrete Pre Cast Panel By Peter Spence ID:
Pneumatic Arm Assembly Instructions
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Foundation Systems.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Installation. Indoor Unit Installation Typical Installation.
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Cutting and Swaging Tubing
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
TRENTON Casing Filler Presentation
Fasteners and Thread Repair
Fundamentals of Structural Detailing
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
How to Build a Divider Wall By Charysse Roberson.
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
Assembly of steering.
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
Leads Institute of Technology & Engineering
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Foundation – jay Desai.
FASTENERS AND THREAD REPAIR
SBN Far Detector Installation & Integration
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
STEP 1: ASSEMBLE ANGLE PLATES
Cast in Place 2 way Flat slabs Basically joists in both directions
AM-LINERII® INSTALLATION PROCEDURE Charles A. Munson 9/21/2018.
Adjusting Tilt and Turn Inswing Door or Window
Bunker Wall Design Wall ESS
Presentation transcript:

COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas 77056

COMPONENT IDENTIFICATION

GATE: The term “gate” refers to the buoyant composite beam itself. Identified here in red.

GATE PAN: The gate pan is a recessed pan that the gate to and fits into. Identified in green.

INSTALLATION BRACKET: The installation bracket is welded to the gate pan and is used for leveling the gate unit, as well as anchoring the gate unit to the structural footing. Identified in blue.

GATE UNIT: The entire structure, including the gate, gate pan, installation bracket, and wiper walls (not shown here).

INSTALLATION PLEASE NOTE THAT THE PHOTOS USED IN THIS PRESENTATION MAY REFLECT VARYING SITE CONDITIONS AND ARE INTENDED FOR ILLUSTRATION PURPOSES ONLY

Installation Kit 5/8” AND 9/16” MASONRY BITS LEVELING BOLTS GATE ANCHOR BOLTS WASHERS AND NUTS VINYLESTER CAPSULES PAINT, FILLER PUTTY AND HARDENER WIPER WALL ANCHOR BOLTS GRATING LIFTING HANDLES STAINLESS SHACKLES AND LIFTING CABLE

Identify the size of the of the rough opening required to accommodate placement of the gate unit. EXAMPLE: Proposed gate size 3‘X 25’ The additions to the gate dimension are constant regardless of the gate size. For a 3’ gate the equation to identify the rough opening (r.o.) would read as follows. 3’ (gate) + 1’-3” (gate pan) + 1’ (installation bracket) + 2’ (construction tolerance) = 7’-3” r.o. EXAMPLE: Proposed gate size 5’-6” X 25’ For a 3’-6” gate the equation to identify the rough opening (r.o.) would read as follows. 5’-6”(gate) + 1’-3” (gate pan) + 1” (installation bracket) + 2’ (construction tolerance) = 9’-9” r.o. THE ROUGH OPENING DEPTH IS THE “UNIT DEPTH” + 3” STANDARD = 12” ROADWAY = 16” STEP 1

Make two parallel saw cuts the correct distance apart as is determined by the rough opening dimension STEP 2

Break out, and haul off site the existing concrete. STEP 3

Excavate, and haul off site, the existing base to the required depth to accommodate the structural footing STEP 4

STRUCTURAL FOOTING The structural footing is a concrete footing placed 16” below finished grade to a depth determined by others. Varying geotechnical conditions and temperatures typically determine the required depth. Consultation with an engineer or local contractor is highly recommended. Load specifications are to be equal to or greater than the existing or proposed driveway design.

Place the 4” drain to storm sewer or exit point, centered both directions in the rough opening, leaving the “stub up “ high (above finished grade) to be cut off at the time of placing the gate unit. STEP 5

Place re-bar and concrete for structural footing (first lift) STEP 6

STEP 7 Remove all crating material from the gate unit. Including the wiper wall support angles and square tubing shims.

STEP 8 Using a spreader-bar of adequate length to make a two point lift, lift the gate unit from the trailer and swing it into position over the rough opening.

Spreader Bar

STEP 9 Leaving the gate unit suspended over the rough opening, screw the leveling bolts (provided) into the installation bracket approximately 1 ½” – 2”. When the gate unit is placed it should be very close to finished grade. Leveling Bolt

STEP 10 Cut off the 4” drain to allow the leveling bolts to sit firmly on the structural footing when the gate is placed. NOTE: Using a site level, make a mark on the 4” pipe at finished grade. Measure down from finished grade 4 ½” and cut off the pipe. This will leave some pipe in the pan to be finished later.

STEP 11 Place the gate unit in the rough opening making sure to keep the gate unit square with the existing structure before anchoring

STEP 12 Level the gate unit to match existing grade. NOTE: Using a site level, shoot several points on the existing concrete (both sides) to determine an “average” finished grade. Placing the mast on the finish angles of the gate unit, take shot at every leveling bolt location and use the leveling bolts to bring the gate unit to “average” finished grade.

STEP 13 Anchor the gate unit to the structural footing. Using a rotor hammer and a 9/16” masonry bit (provided) drill a minimum of 6” into the structural footing by placing the into the anchor holes located adjacent to the leveling bolts. Once the holes are all drilled, it is vey important to remove all dust from the holes by using a vacuum or compressed air. After the holes are thoroughly cleaned you can then drop the epoxy capsules (provided) into the holes. Place the ½” stainless all-thread bolts into the holes and strike with a hammer to ensure that the capsule is broken and the epoxy is released. Allow the anchor bolts to “set” for about an hour to an hour and half, depending on the ambient temperature, or until secure. Once set you can then bolt down the unit. Using a grinder with a cut-off wheel, remove the excess all-thread protruding above finished grade. Open the gate and put the prop-rods (located in the pan) into place making sure to use the safety pin to prevent the gate from falling. Repeat the anchoring process using the holes located on the retention arm brackets. The all-thread bolts used on the inside of the pan must be ground off flush with the top of the nuts to ensure proper closing of the gate. Return the gate to the closed position.

Attach lifting cable with stainless shackles

Retention Arms

Prop-rod

Rotate prop-rod upward

Slide prop-rod into position

Place prop-rod end into the receiver

Install safety pin

Lower Retention Arm Bracket

Using a rotor hammer and ½” masonry bit (provided) drill into the existing structure far enough to receive the wedge anchors and bolts (provided) by placing the bit into the pre- drilled holes in the wiper walls. Place the wedge anchors and bolts into the holes and tighten while ensuring the wiper walls are plumb and square to the gate surface. Sand the area around the bolt heads to remove the paint. Apply the two part putty (provided) to the sanded areas using the applicator provided. Allow the putty to harden and sand smooth. STEP 14 Anchor the wiper walls to the existing structure.

STEP 15 Protect the entire gate unit using duct tape and plastic to keep any concrete from getting on the gate unit.

STEP 16 Place the second lift of concrete to finished grade. NOTE: It is critical to pour the concrete from the front side or “wet side” and vibrate to the back to avoid any air pockets.

Wet Side Dry Side

Vibrating Concrete from “Wet Side” to “Dry Side”

STEP 17 Using non-shrink grout, grout the area between the wiper walls and existing structure. Wiper wall condition before grout

Wiper Wall condition after grout

STEP 18 Remove the tape and plastic, open the gate and put the prop-rods into place. Using a grinder with a cut-off wheel, cut the 4” drain off flush with the gate pan. Do not install a strainer. Re-paint the puttied areas of the wiper walls using the paint and roller provided.

ESTIMATED INSTALLATION TIME A typical retrofit installation, as we have illustrated here, under normal conditions usually takes four (4) men, three (3) days. The actual placement of the gate unit, i.e. leveling, anchoring, and placement of the second lift normally takes four (4) men, one and one half (1 ½) days. For assistance please contact FloodBreak technical services. FloodBreak, L.L.C Post Oak, Blvd. Suite 5850 Houston, Texas (713)