Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy Cross Hospital – North Addition
Location: Silver Spring, MD Owner: Holy Cross Hospital Architect: SmithGroup Engineers: Leach Wallace Assoc. (MEP) CM/GC: Bovis Lend Lease Size: 124,000 s.f. Completion Date: July 2005 Final Cost: $21.9 million $7.8 million MEP * North Addition part of a global renovation plan for the facility totaling 260,000 s.f. and costing $69 million. HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Project Background
Lighting of Registration Space Lighting of Main Lobby Electrical Depth Final Conclusions Acknowledgements Covered in Final Report CM Breadth Mechanical Breadth HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Topics of Discussion
Lighting of Registration Space Lighting of Main Lobby Electrical Depth Final Conclusions Acknowledgements HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Topics of Discussion
Architectural Features: Curved wooden south façade Frosted glass north façade Open to concourse/lobby on east and west walls Metal partitions separate each workstation Design Goals: Accent architectural features Limit spill light into admin. Offices Provide ample task illuminance 30 fc horizontal (reading) 10 fc horizontal (corridor) HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Registration Space
4” Open Downlights (13Q) 2x2 Direct/Indirect Recessed Basket HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Registration Space 4” Open Downlights (18TRT)
Computer Analysis Results: (AGI32) HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Registration Space Allowable Power Density: 1.3 W/ft 2
Final Solution: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Registration Space
Building Background Lighting of Registration Space Lighting of Main Lobby Electrical Depth Final Conclusions Acknowledgements HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Topics of Discussion
Architectural Features: Information Kiosk central to space Reading area in SW corner Art wall adjacent to entrance Wood-paneled north facade Design Goals: Bring attention to info kiosk Accent architectural features Provide ample task illuminance at kiosk and reading space Accent back wall to limit depth of space 10 fc horizontal, 3 fc vertical (corridor) 50 fc horizontal (info kiosk) 30 fc horizontal (reading space) HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby
HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby 6” LED Cove Fixture 6” LED Cove Fixture In Column
6” Recessed Downlights (42TRT)Ceiling Mounted PhotosensorDimmed 6” Recessed Downlights (42TRT) HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby
Daylight Study Results: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby
Computer Analysis Results: (AGI32) HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby Allowable Power Density: 1.3 W/ft 2 (lobby) 1.2 W/ft 2 (reading)
Final Solution: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Lighting Depth – Main Lobby
Schematic: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Electrical Depth – Alternate 1 - denotes 480Y/277V panel - denotes 208Y/120V panel Panel MDP-N Panel LP-1N Panel LP-2N Panel LP-3N Panel LP-4N Panel PP-1N Panel PP-1N1 Panel HCK Panel PP-2N Panel PP-3N Panel PP-4N XFMR T-9 XFMR T-1 XFMR T-11 XFMR T-2 XFMR T-3 XFMR T-4 Panel MDP-N Panel MDP-L Panel PP-2N XFMR T-L Panel PP-2N Panel PP-2N Panel PP-2N Existing Normal Power DistributionProposed Normal Power Distribution
Summary: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Electrical Depth – Alternate 1 - Feeder upsized due to voltage drop
Proposed Standby Power DistributionExisting Standby Power Distribution Schematic: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Electrical Depth – Alternate 2 - denotes 480Y/277V panel - denotes automatic transfer switch SUBSTATION D LIFE SAFETY BRANCH ATS-1 ATS-2 ATS-3 EX. EMERGENCY GENERATOR SETS CRITICAL BRANCH EQUIPMENT BRANCH NORMAL BRANCH EMERGENCY BRANCHES - denotes switchgear with secondary voltage 480Y/277V SUBSTATION D LIFE SAFETY BRANCH ATS-1 ATS-2 ATS-3 ISOLATED EMERGENCY GENERATOR CRITICAL BRANCH EQUIPMENT BRANCH NORMAL BRANCH EMERGENCY BRANCHES ATS-4
Summary: HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Electrical Depth – Alternate 2 - Feeder upsized due to voltage drop
Building Background Lighting of Registration Space Lighting of Main Lobby Electrical Depth Final Conclusions Acknowledgements HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Topics of Discussion
Lighting Depth – Registration Space – complimented architectural elements while keeping fixtures minimally obtrusive to the space, provided sufficient illuminance levels under ASHRAE 90.1 Power Density recommendations Main Lobby – utilized light as a means to call attention to particular functions and artistic features within the space, created a more inviting space by washing the back wall, provided sufficient illuminance levels for various tasks under ASHRAE 90.1 Power Density recommendations Electrical Depth – investigated cost impact of centralizing normal branch step- down transformers, provided alternative emergency back-up power generation system and assessed the feasibility of proposed implementation HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Final Conclusions
Professional Leach Wallace and Associates, Inc. Reese Engineering, Inc. Faculty Dr. Richard Mistrick Dr. Martin Moeck Prof. M. Kevin Parfitt Personal Family Friends/ Roommates Fellow AE Students HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Acknowledgements
HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Questions? Comments